Loading...
Town Center L1B2-LR 980724[· GEOTECHNICAL ENGINEERING E I'ENVI ON ENT^ CONSU'T'NG 'GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: Client: Project Identification Method of Test July 24, 1998 Ewing Properties Town Center Shopping - Coppell, Tx. Reinforcing Steel Inspection Visual Inspection Test Date: July 23, 1998 General Report No.: 11 Project No.: 298-0165 Results On July 23, 1998, reinforcing steel was inspected at the following locations: Sidewalk adjacent to front entrances of building Page 1 of 1 There were no discrepancies. Tech: AS cc: Mr. ~rohn Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Copp¢ll (2) GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 5 (298-0275) Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: First United Methodist Church Material Description Maximum Optimum Dry Moistur~ Density Content Project:First United Methodist Church (Lbs/CuFt) Percent of Coppell 1. Gray Sandy Clay(Natural) 96.3 18.2 Test Date: July 22, 1998 2. Dark Brown & Brown Silty Clay w/occasional Calcareous nodules(fill) 103.6 16.2 3. Dark Brown & Light Brown Clay w/occasional Report Date: July 24, 1998 Calcareous nodules(fill) 94.1 24.0 4. Dark Brown Clay(fill) 91.2 24.5 Required Density (%): 95% - 105% Required Moisture (%): N/A Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test No. (Lbs/CuFt) Content (%) Probe Depth 2 Final Lift 15 40' E. & 170' S. of NW parking corner 100.1 18.5 96.5 4." 3 Final Lift 16 35' E. & 120' S. of NW parking corner 93.0 16.9 98.7 4." 2 Final Lift 17 30' E. & 75' S. of NW parking corner 103.8 19.2 100.1 4." 1 Natural 18 50' E. & 35' S. of NW parking corner 93.8 10,6 97.4 4" 1 Natural 19 S. Approach 97.4 11.4 101.1 3 Final Lift 20 75' W. & 200' S. of NE corner Vanbebber & Heartz 94.4 17.4 100.3 2" 3 Final Lift 21 70' W. & 150' S. of NE corner Vanbebber & Heartz 93.5 10.6 99.3 4" tests meet prOject specifications GEE Consultants, Inc. Dallas, Texas 214-352-5433 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 5 (298-0275) Method: ASTM D2922 D3017 D698 Page 2 of 2 Client: First United Methodist Church Material Description Maximum Optimum Dry Moisture Density Content Project:First United Methodist Church (Lbs/CuFO Percent of Coppell ~.~ ls.2 1. Gray Sandy Clay(Natural) Test Date: July 22, 1998 2. Dark Brown & Brown Silty Clay w/occasional 103.6 16.2 Calcareous nodules(fall) 3. Dark Brown & Light Brown Clay w/occasional 94.1 24.0 Report Date: July 24, 1998 calcareous nodu~(r~ 91.2 24.S 4. Dark Brown Clay(fill) Required Density (%): 95% - 105% Required Moisture (%): N/A Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuF0 Content (%) No. Probe Depth 3 Final Lift ~ 22 70' W. & 95' S. of NE corner Vanbebber & Heartz 93.9 12.1 99.8 3 Final Lift 23 60' W. & 75' S. of NE corner Vanbebber & Heartz 95.1 15.8 101.1 4" 3 Final Lift 24 50' W. & 50' S. of NE corner Vanbebber & Heartz 97.2 19.5 103.3 4" All tests meet project specifications cc: Ms. Lynn Johnson - First United Methodist Church Mr. Charles Harper - Harper perkins Architects Mr. Larry Davis - City of Coppell Mr. Bill Anderson - Dowdey, Anderson g: Associates, Inc. Our letters and reports are for the exclusive use of the client to whom they are addr~sed. The use of our name must ~r~ive ~r prior writt~ approval. Our letters and reports a~ply only to the sample tinted and/or inspected, and are not nec~$arily indicative of thc quantities of apparently identical or similar prnduc~.