Town Center L1B2-LR 980702· GEOTECHNICAL ENGINEERING E"I GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 2, 1998 Dat' Concrete Placed: June 24, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI/Plant #31 Paving Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12' Area 28.27 Square Inches Concrete Report No.: 17 Project No.: 298-0165 MATERIALS s ..../ SSD Batch Wt$. INSPECTION DATA Description (Lbs/CuYd) Mix Number: Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Track/Ticket No: Coarse Aggregate: 1" Temperature: Intermediate Aggregate: Ambient Range: 97°F Concrete Range: 95°F Fine Aggregate: Slump Range (inches): 8" Admixtures: Weather Conditions: Clear I Time Started: 06:30 am 2 Time Completed: 01:45 pm Added Water: 0 Gallons Sample Air Content (%}: 4% Total Cubic Yards Placed: 220 Required Strength (Lbs./sq.in.): 3.500 11:27 am 12:50 pm Paving - 75' N. & 50' W. of S. Building comer 736/1080404 Spemmen Measured Age Date Total Load Compressive Strength Remarks Number Slump (itl.) (Da~s) Teated (Lbs.) (Lbs./Sq.in.t CTC 70 7 07/01/98 78,440 2,770 CTC 71 28 07/22/98 CTC 72 8" 28 07/22/98 CTC 73 H HOLD I I Tcst Methods Utilized Fracture Regular Cylinders Made By: VW ASTM C-3LC-39.C-143 (Unless Nntnd Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) I I xx,.,/& All letters and reports are tbr the exclusive uae of the client to whom they are addressed and sba not be reprodule~tthout the full ap~oval of GEE Cousultam$. Inc. The uae of our ,tame must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are nm mcessarily indicative of the quantities of apparently identical or similar products.  ° GEOTECHNICAL ENGINEERING E GEE Consultants Inc. I E 'J . CONSTRUCTION MATERIALS TESTING 0046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 2, 1998 Date Concrete Placed: June 24, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI/Plant//31 Paving Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 16 Project No.: 298-0165 MATERIALS s .... ~ sso ~a,~ wu. INSPECTION DATA Description (Lbs/CuYd) Mix Number: Time Sample Batched: Cement: Time Sampled: Fly Ash: Sample Location: Coarse Aggregate: !" Truck/Ticket No: Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 97°F Concrete Range: 90°F Admixtures: Slump Range (inches): 7" 1 Weather Conditions: Clear 2 Time Started: 06:30 am Added Water: 0 Gallons Time Completed: 01:45 pm Sample Air Content (%): 4% Total Cubic Yards Placed: 160 Required Strength (Lbs./sq.in.): 3,500 09:56 am 10:40 am Paving - 175' N. & 100' W. of S. Building comer 427/1080283 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CTC 66 7 07/01/98 77,900 2,760 CTC 67 28 07/22/98 CTC 68 7" 28 07/22/98 CTC 69 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: HG ASTM C-3[,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) All letters and reports are fo: the exclusive ~e of the client to whom they are addressed and shall not be reproduced wi~l~ the full approval of OEp. Consultants. Inc. The use of o~t rmma must receive our prior written approval. Our letters and reports apply only to the sample tested and/of in~pected alld are not nervily ledtcatlve of the quatltltlel of apparently identical or similar prodncts. 1· GEOTECHNICAL ENGINEERING E Consultants, Inc. IE ] 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 2, 1998 Date Concrete Placed: June 24, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI/Plant #31 Paving Contractor: Concrete Supplier and Plant: Location of Placement: Standant 6"x12" Area 28.27 Square Inches Concrete Report No.: 15 Project No.: 298-0165 MATERIALS soiree, SSD .a,ch wu. INSPECTION DATA Description {Lbs/CuYd) Mix Number: Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Coarse Aggregate: 1" Track/Ticket No: Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 86°F Concrete Range: 93°F Admixtures: Slump Range (inches): 6tA" 1 Weather Conditions: Clear 2 Time Started: 06:30 am Added Water: 0 Gallons Time Completed: 01:45 pm Sample Air Content (%): 4% Total Cubic Yards Placed: 90 Required Strength (Lbs./sq.in.}: 3,500 07:35 am 08:30 am Paving - 233' W. & 38' N. of S. Building coITler 369/1O79950 Specimen Measured Age Date Tolai Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CTC 62 7 07/01/98 88,420 3,130 CTC 63 28 07/22/98 CTC 64 61/2" 28 07/22/98 CTC 65 H HOLD Test Methods Utiliz~l Fracture R*gu~ Cylinders Made By: HG ASTM C-31,C-39.C-143 (Unless Noted Otherwise) Remarks and/or Distribution: CC: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) All letters and reports are for the exclusi ..... f c' y P uc~ithot · · the henttowhomtbe are addressed and shall noc be re rod itho~ the full aq~'oval of GEE Comultants lnc The use ofour name must rece~ve our prio¢ written approval. Our letters and reports apply only to tbe sample tested and/or respected and are not recessardy md~catwe ot the quantltms of apparently identical or s~mdat products. · GEOTECHNICAL ENGINEERING E GEE Consultants Inc. E · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 2. 1998 Date Concrete Placed: June 3, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI #31 Panels Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 12 Project No.: 298-0165 so ..... SSD,a~h w~. INSPECTION DATA MATERIALS >.~.p,,o. (~bs/CuVa~ Mix Number: 9506 Time Sample Batched: 07:59 am Time Sampled: 08:45 am Cement: Sample Location: Wall Panel Grid 3 from G-H Fly Ash: Truck/Ticket No: · 632/1064079 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 76°F Concrete Range: 88°F Fine Aggregate: Slump Range (inches): 5~,~'' Admixtures: Weather Conditions: Partly Cloudy 1 Time Started: 05:00 am 2 Time Completed: 10:30 am Added Water: 15 Gallons Sample Air Content (%): 1.5% Total Cubic Yards Placed: 110 Required Strength (Lbs./sq.in.): 3,500 sbecimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CTC 49 7 06/10/98 84,240 2,980 CTC 50 28 07/01/98 146,600 5,190 CTC 5 l 5 ]/2" 28 07/01/98 141,540 5,010 CTC 52 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: AS ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) G~ · GEOTECHNICAL ENGINEERING El. GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: July 2, 1998 Date Concrete Placed: June 3, 1998 Client: Ewing Properties Project: TOWI1 Center Shopping Coppell, Texas Tri Cities Foundation TXI//31 Panels Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12~ Area 28.27 Square Inches Concrete Report No.: 11 Project No.: 298-0165 s ..... , ssD ~,,chWa. INSPECTION DATA MATERIALS ~,ip, io, Mix Number: 9506 Time Staple Batched: 06:01 am Time Sampled: 06:45 am Cement: Sample Location: Panel g4, N.E. comer; N. Wall from B-B.3: Fly Ash: Top-Bosom Coarse Aggregate: Tmc~Ticket No: 36211063863 Inte~ediate Agg~gate: Tem~m~: Ambiem ~ge: 77~F Fine Aggrega~: Concrete Range: 89~F Admixtures: Slump Range (inches): 1 Wea~er Conditions: Partly Cloudy 2 Time Smn~: 05:~ am Added Water: 20 Gallons Time Completed: 10:30 am Sample Air Content (%): 0.5% Total Cubic Ya~s Placed: 30 Requi~ Streng~ (Lbs./sq.in.): 3.5~ Specimen Measured Age Date To~al Load Compressive Strength Remarks Number Slump (in,) (Days) Tested (Lbs.) (LbsJSq.ln.) CTC 45 7 06/10/98 71,360 2,520 CTC 46 7V2" 28 07/01/98 113,760 4,020 CTC 47 28 07/01/98 116,740 4,130 CTC 48 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: AS ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: Superintendent was informed of slump results cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) our prior written approval Our letters and reports apply only to the sample tested and/or inspected and ate n~ oec~,r, atlly Indle.,arlve of the quantities of applltently identical or slntdar prOdL~L~,