The project area consists of a 10-acre tract adjacent to MacArthur Road and south of Sandy Lake Road.
This tract is shown on the drawing in this appendix. The project consists of fill in the floodplain with
compensating excavation that results in no increase in flood levels and no decrease in 100 year flood
storage.
Hydrologic and Hydraulic Information
The ten-acre tract is affected by the flood elevations fi.om the Elm Fork of the Trinity River. However,
these elevations are blocked from the actual flow of the river. The area is in an ineffective flow regime and
thus has no impact on flood elevations as long as storage levels are not reduced. This means that filling the
tracts has no impact on the flood elevations.
Storage Determinations
It is important to offset any lost storage created by filling the tract. This is accomplished by excavating a
portion of the adjacent tract as shown on the attached drawing. In order to determine the storage on the
property before and after the proposed project a computer model was created by describing cross sections
through the area. The results of this analysis are included in this appendix.
Results
The project site is in an area that receives floodwaters fi.om the Elm Fork of the Trinity River, but is
isolated from the actual flow of the river. Because of this the area can be filled w~thout impact to the flood
elevations of the river. This report has identified storage mitigation so that there is no net decrease in flood
storage.
CDC Forms
All required forms in support ora CDC approval are included in this appendix.
- - Standard CDC Form Instructions
September 1998
This application should be completed according to the guidelines set forth in the 2nd Edition
the CDC Manual.
To initiate the Corridor Development Certificate (CDC) permit process, the developer
should first contact the local government (City) for a pre-permit conference. The
CDC/Floodplain Administrator of that local government determines whether the project
lies within or partially within the Regulatory Zone. If the project lies completely outside
the Regulatory Zone, the CDC/Floodplain Administrator is not required to take any
further action beyond making this determination; no forms are required to be submitted
and the CDC process ends at this point.
If the project lies within or partially within the Regulatory Zone and there is a possibility that a
CDC permit might be granted, the CDC Process must be followed. The Applicant should fill out
Parts 1 and 2 of the Standard CDC Form and submit it to the CDC Floodplain Administrator
-- unless the Applicant is seeking an exemption, in which case the Applicant must only complete
Part 1. If the CDC/Floodplain Administrator decides at any time to deny a CDC permit, the CDC
Process can be terminated.
Information provided by the Applicant herein will be used by the City/County to evaluate this
Trinity, River Corridor Development Certificate (CDC). This application is public information
- and will be used by other relevant floodplain regulatory authorities, i.e., U.S. Army Corps of
Engineers (USACE), Federal Emergency Management Agency (FEMA), and the Texas Natural
Resource Conservation Cormnission (TNRCC). These and other regulato~ agencies may requite
additional information.
If an Intent to Process (1TP) is granted, the Standard Form shall be distributed to the following
agencies:
· USACE;
· FE/VlA;
· TNRCC;
· the North Central Texas Council of Governments (NCTCOG);
_ · the cities of Arlington, Carrollton, Coppell, Dallas, Farmers Branch, Fort Worth, Grand
Prairie, Irving. and Lewisville;
· the counties of Dallas, Denton and Tan'ant;
_ · the Tarrant Regional Water District; and the Trinity River Authority.
Appendix F lists addresses for the entities to which the ITP must be senc
If additional space is needed to complete this application, please attach a separate sheet labeleci.
appropriately.
- Hvdrologic and Hydraulic Data
Design discharges for the 100-year and Standard Project Flood storm events shall be based on
urbanization consistent with a "Future Conditions with CDC" Scenario or on supplemental data
provided by the USACE, whichever discharge is larger. (See Table 1 in Appendix B.) The
Applicant should identify these design discharges, including source and date, in the "100 Year
Flood Event" and "SPF Flood Event" tables in Part 2 #3.
Hydraulic calculations shall be continued for a distance great enough upstream and downstream
of the project to verify that water surface elevations are not raised by the proposed hydraulic
modifications (spaces are provided in the "100 Year Flood Event" and "SPF Flood Event" tables
in Part 2 #3 to list water surface elevations for a number of points upstream and downstream).
Elevation data should be computed considering full cross-section widths across the river or
creek.
Storage data for pre-project and with-project conditions (Part 2 #3) shall be developed within the
project borders alone and considering full cross-section widths across the river or creek. Storage
change is to be considered "on-site" (i.e., within upstream and downstream limits of the
discharge reach.) Compensating valley storage for a proposed activity can also be provided at
another site if the USACE recognizes and approves the "off-site" valley storage. In addition, if
any valley storage is lost elsewhere due to the project, storage change shall be addressed on a full
cross-section width basis, with change based on the original "on-site" storage.
Standard CDC Form Instructions
September 1998
Th. is application should be completed according to the guidelines set forth in the 2nd Edition ';f
the CDC Manual.
To initiate the Corridor Development Certificate (CDC) permit process, the developer
should first contact the local government (City) for a pre-permit conference. The
CDC/Floodplain Administrator of that local government determines whether the project
lies within or partially within the Regulatory Zone. ff the project lies completely outside
the Regulatory Zone, the CDC/Floodplain Administrator is not required to take any
further action beyond making this determination; no forms are required to be submitted
and the CDC process ends at this point.
If the project lies within or partially within the Regulatory Zone and there is a possibility that a
CDC permit might be granted, the CDC Process must be followed. The Applicant should fill out
Parts I and 2 of the Standard CDC Form and submit it to the CDC Floodplain Administrator
unless the Applicant is seeking an exemption, in which case the Applicant must only complete
Part I. If the CDC/Floodplain Administrator decides at any time to deny a CDC permit, the CDC
Process can be ten'n, inated.
Information provided by the Applicant herein will be used by the City/County to evaluate this
Trinity River Corridor Development Certificate (CDC). This applicfition is public information
and will be used by other relevant floOdplain regulatory authorities, i.e., U.S. ,~MTriy Corps of ':
Engineers (USACE), Federal Emergency Management Agency (FEMA), and the Texas Natural
Resource Conservation Commission (TNRCC). These and other regulatory agencies may require
additional information.
If an Intent to Process (ITP) is granted, the Standard Form shall be distributed to the following
agencies:
· USACE;
· FEMA;
· TNRCC;
· the North Central Texas Council of Governments (NCTCOG);
· the cities of Arlington, Carrollton, Coppell, Dallas, Farmers Branch. Fort Worth. Grand
Prairie, Irving. and Lewisville;
· the counties of Dallas. Denton and Tar'rant;
· the Tm'rant Regional Water District: and the Trinity River Authority.
Appendix F lists addresses for the entities to which the ITP must be sent.
If additional space is needed to complete this application, please attach a separate sheet labeled
appropriately.
Hydrologic and Hydraulic Data
Design discharges for the 100-year and Standard Project Flood storm events shall be based on
urbanization consistent with a "Future Conditions with CDC" Scenario or on supplemental data
provided by the USACE, whichever discharge is larger. (See Table 1 in Appendix B.) The
Applicant should identify these design discharges, including source and date, in the "I00 Year
Flood Event" and "SPF Flood Event" tables in Part 2 #3.
Hydraulic calculations shall be continued for a distance great enough upstream and downstream
of the project to verify that water surface elevations are not raised by the proposed hydraulic
modifications (spaces are provided in the "I00 Year Flood Event" and "SPF Flood Event" tables
in Part 2 #3 to list water surface elevations for a number of points upstream and downstream).
Elevation data should be computed considering full cross-section widths across the fiver or
creek.
Storage data for pre-project and with-project conditions (Part 2 #3) shall be developed within the
project borders alone and considering full cross-section widths across the river or creek. Storage
change is to be considered "on-site" (i.e., within upstream and downstream limits of the
discharge reach.) Compensating valley storage for a proposed activity can also be provided at
another site if the USACE recognizes and approves the "off-site" valley storage. In addition, if
any valley storage is lost elsewhere due to the project, storage change shall be addressed on a full
cross-section width basis, with change based on the original "on-site" storage.
CDC Tracking Code:
(To be supplied by CDC/Floodplain Administrator)
STANDARD CDC FORM - PART 1
(To be filled out by Applicant or Applicant's Representative and submitted to the appropriate local CDC/Floodplain
Administrator. If an ITP is granted, the CDC/Floodplain Administrator will send Part I along with Part 2 (unless an
exemption is granted), the 1TP form, and the Preliminary Technical Review (if requested) to the parties designated
on the ITP form.)
1. Applicant's Representative. Identify person knowledgeable of and authorized to respond to questions
concerning data provided by the Applicant.
Relationship to Applicant: ~'m ~ /~ ~ e W
Upper Trinity River Feasibility Study Mapping Grid ID :
__ MAPSCO and Location Reference: ~. ~ ~ / f~ - ~'
3. Location. Provide general description of location, including street address, nearest cross-street, and identified
-- 4. Site plan. (a) Please attach a location map (8 1/2 x 11). Plans attached: ~ Yes [] No
(b) Please attach a general site plan ($1/2 x ll). Plans attached: ~Yes ClNo
-- 5. Proposed Activity: (check appropriate categories)
[] dredge/channel modification [] swale construction Igi fill [] levee [] other
(attach explanation)
6. Proposed Use: (check appropriate categories)
[] private single dwelling(s) i~l private multi-dwelling(s) [] public [] commercial
[] industrial I-I other (attach explanation.)
-- 7. Applicant requests an exemption or variance to common permit criteria. [] Yes [] No
[ Please attach supporting material ]
_ Application is hereby made for a Corridor Development Certificate (CDC). I certify that I am familiar with
the information contained in this application, and that to the best of my knowledge and belief, this
information is true, complete, and accurate. '
Signature of CDC Applicant or Applicant's Representative / Typed Name / Title Date
CDC Tracking Code:
(To be supplied by CDCffFloodplain Administrator)
STANDARD CDC FORM - PART 2
Detailed Hydrologic/Hydraulic Information
(To be filled out by Applicant or Applicant's Representative and submitted to the appropriate local
CDC/~oodplain Administrator. The CDC/Floodplain Administrator will send will send Pm 2 along with
Part I, the ITP form, and the Preliminary Technical Review (if requested) to the parties designated on the
ITP form.)
General. CDC Applicants are requested to provide the following detailed hydrologic and hydraulic
information for all proposed projects within the CDC Regulatory Zone of the Trinity River Corridor. This
form and the data provided by the CDC Applicant herein are required to supplement Part 1 of the
Application Form. However, in certain cases the City/County may release the CDC Applicant from
completing all or portions of this form if the proposed project satisfies specific provisions. The CDC
Applicant is encouraged to schedule a pre-application meeting with the City/County if there are any
questions regarding the requirements of the City/County. This application is considered public
information and will be distributed to affected Federal, State, and local governmental agencies. Please be
as complete and concise as possible. Incomplete information can cause delays in the CDC process.
1. SitePlan. C~¢~ /~c~c~t X a) ,'
Please attach a detailed site plan. Plans attached: [] Yes [] No
The scale of project plans shall provide adequate detail of the whole project as well as individual features of the
project. The plans should show the .location of the FEMA Regulatory Floodway and the layout of cross-sections
used in the hydraulic model. Proposed changes to the Floodway should be clearly shown.
2. Operation and Maintenance. The operation and maintenance of flood water conveyance systems,
conveyance alterations, storm water conu'ol structures, equipment and appurtenances, and water quality
control measures will become the obligation of: (check one)
[] City [] County IZI,Owner
The annualized cost, including replacement costs, of operating and maintaining post-project storm
water control systems, conveyance alterations, and water quality control measures is estimated to be in
current year dollars: ($/yr)
Legal provision for commuuity monitoring and backup maintenance attached? [] Yes [] No
(Required if maintenance is to be accomplished by an agent other than the permitting entity)
J ! J J I ~ I I I I I I I I I I ! I !
TABLE 2
10 ACRE TRACT
Section 100 Yr Existing Proposed
SPF Vol, AF Vol, AF
1 445.25 0 0
I 450.3 0 0
2 445.21 0.92 0
2 450.25 6.76 5.08
3 445.1 2.52 0 10 Acre Tract
3 450.2 25.22 19.78
100 yr -4.25 AF
4 445 4.25 0 SPF -9.04 AF
4 450.1 39.32 30.28
Storage Pond 7.89 AF
100 Yr. 3.64 AF No Loss
SPF o 1.15 AF 2.9%
ST.adqDARD CDC FORM PART 2 - CONTINUED
3. Hydrologic/Hydraulic Information. Please provide the following data to characterize the hydrologic and
hydraulic impacts of the proposed project:
--- 100 YEAR FLOOD EVENT ---
Hydrologic / Hydraulic Impact Pre-Project Post-Project Change
Discharges: Upstream Boundary: ~ t~G O cfs. N/A N/A
Downstream Boundary: .~'~" t% E) C) cfs. N/A N/A
Date0..of discharge~4 data:,,~_O ~'~- ~ ,.c 0-~ 19 ~ /
Cha..elV~oaties: Ups~l~m ~u,~: ~4, q! fps.,7, 7 1 ,s. O fps.
~-/~ 9 ~-.3~0 Dow~tr~mBound~: 9, t 3 fps. a, ~ 3 ~,s. 0 fps.
Water Surface Upstream Boundary (UB): ft. ft. ft.
a//.~ y~?3o ~o ft. upstream of ~: ~¥~-=~Y~ ft. q q;. ?.~ ft. ~ ft.
~i00/q.~7~,o aW~.upstreamoft;,: 4'q,C, Ce/ ft' U qq, 7'q ft.[ o ft.
~/D /~Oft. upstreamofUB: /./t/./~, O ~- ft- ,t/qg,o..~_ ft' [ 0 ft'
c/757o .r45aft. upstreamoftm: qq~-,?2'" ft. q~,,'?t,2 ft. ..o
~<~:;"O /'2/t~ft. downstream of DB : /4tq~//,og.~ ft. g//~/~? ft. 0 ft.
~Le3 qOOOa ~;If',,4c~ft. downstreamofDB: /..] ~t ~ 4~ ft. qu]3' g? ft. ~ ft.
~/,,~ ~jt~ Oj~_] :~L~- ft. downstream of DB: /J' q3, O "7ft' 4~,0 c~ ft' <:D ft.
.q/5 ~?ql.,~9 3q,,ft. dow,stream of Da: 4'Ot,,¢-0 ft- ~q/0,~ ft- ,-~ ft-
Project Lands in ~,~,3'7 ac. ac. --.~, 37 ac.
Moodplain: /O ~ 'rte,,c44'
Project Lands: .~¢ ~. ~,.S-~r°
The CDC application shall include plots and electronic data files from the current hydraulic model (HEC-RAS.
obtained from the USACE) of cross-sections for pre-project and with-project conditions. Water surface profiles for
100-year flood and Standard Project Flood for pre-project and with-project conditions should also be included. The
number and location of sections should adequately describe and support documented computations.
Cross section plots attached? [] Yes ~ No
Cross section electronic data files included? [] Yes I~t No
Water surface profiles attached? [] Yes ~ No
STANDARD CDC FORM PART 2 - CONTINUED
--- SPF FLOOD EVENT ---
Hydrologic / Hydraulic Impact Pre-Project Post-Project Change
Discharges: Upstream Boundary: ]o O ~oO cfs. N/A N/A
Downstream Boundary: j~) O O 0 cfs. N/A N/A
Date of ai~chs~g, dam: ~'~¢,.. ~ ~ c...r~/ ~ ~ )
Cham, ei Velocit/es: upstream~ounoary: - 7, .Q- '% fps. ..~, D.3 fps. r'3 fps.
O-/k ?-~ ~O0 Downstream Boundary: ,~7_0 /3 fps. ~,9_, /,_~ fps. O fps.
W-ter Surface Ups~eam Boundary (UB): ft. ft. ft.
-- Mid-project: 45o. J,- q a. q ~c , D. 9 ft. c~ ft.
~ ~/'"'~(7) Downstream Boundary (DB): ,t.J~'O,O ? ft. 4~' C~ ft. a ft.
~'7(~ ~) ]40 ft. upstream of UB: ~O ,~.~ ft' ft- O ft-
- q'Y2/O /?.~ ft. ups~em of us: ¥6v, s"9 ft' f~- o ft'
-- ~/% fi(3 qcS/O )~10ff. downstreamofDB: ~ qq , gl ft. a. 0 ft.
;ooov:o~0~.do~s=e~ofD~: ~4ff,-~O ~. ~-o ft-
L
0-/s gf/5~ ~.ea. do~s=e~ofDB: ,~ ¢~','~ ~ ~. ~.~ ft.
-- Project Lands in [0 d Ct¥'~C3/- ~¢ ac. ~ ac. ~D ac.
Floodplain:
Valley Storage on -~ ~, 3o"L~ac.ft. ~ o . ~L ~ ac-ft. /, ! .~ ac-ft.
-- Project Lands: .,/-.'-7.~'9 ,~-~-4~, 3~,',~.~e--~, c/ c~°
The CDC application shall include plots and electronic data files from the current hydraulic model (HEC-RAS,
obtained from the USACE) of cross-sections for pre-project and with-project conditions. Water surface profiles for
100-year flood and Standard Project Flood for pre-project and with-project conditions should also be included. The
number and location of sections should adequately describe and support documented comPUtations.
Cross section plots attached? [] Yes ~ No
-- Cross section electronic data files included? [] Yes ~ No
Water surface profdes attached? ~ Yes ~ No
STANDARD CDC FORM PART 2 - CONTINUED
4. Flood Storage/Hydraulic Mitigation. Please identify all flood storage and other hydrologic/hydraulic
mitigation areas on the site plan, and describe them in the space below: ~
Habitat/Wetland Mitigation. If a Section 404 permit is required, please identify, all habitat and/or
land resource area used for environmental mitigation purposes on the site plan, and describ~ them in
the space below:
_ 6. Land Cover Information. Please provide the following data, in total acres, to characterize the
impacts on current land cover which will result from construction of the proposed project:
..- LAND COVER INFORMATION ---
Land Use / Land Cover Classification ** Pre-Project Post-Project
(Total Acres) (Total Acres)
-- I00 urban/built up
200 agricultural/pasture
300 rangeland/shrub & brush /0_ ca_ C .
400 forest/woodlands O
500 water (identify on site plan)
-- 600 wetland (identify on site plan)
700 barren land/mines & quarries
"' Note: Listed land cover types are "Level 1" categories (100 through 700) defined in accordance with
the land use and land cover classification of the U.S. Geological Survey. U.S. Department of the Interior.
This data may be required by the U.S. Army Corps of Engineers and other regulator' agencies.
To the best of my knowledge, the information in Part 2 is complete and accurate:
- z.
Signature of CDC Applicant or Applicant's Representativedl'yped Name/Title Date
CDC Tracking Code:
CDC EXTENSION REQUEST
(To be submitted by CDC Applicant to local CDC/Floodplain Administrator, with a copy to NCTCOG)
General. This application should be completed according to the guidelines set forth in the Corridor Development
Certificate Manua~ 2~ Edition. Information provided by the Applicant herein will be used by the City/County to
evaluate the extension of the Trinity River CDC permit. This application is public information and will be used by
other relevant flood plain regulatory authorities (e.g., USACE, FEMA and TNRCC). If granted, the permit
extension applies to the Corridor Development Certificate only. If additional space is needed to complete this
application, please attach a separate sheet labeled appropriately.
Applicant's Representative. Identify person knowledgeable of and authorized to respond to questions concerning
data provided by the Applicant.
Name:
Relationship to Applicant:
Address:
Telephone/fax/e-mail:
Explanation for Extension Request
Status of Other Related Permits / Projects
Applicant's Signature / Typed Name / Title Date
CDC Administrator Action/Findings
(To be filled out by CDC Administrator)
Extension Request Granted? Yes [] No []
Period of Extension: FROM: TO:
Signature of CDC Administrator / Typed Name / Title Date
CDC Tracking Code:
INTENT TO PROCESS FORM
(To be filled out by CDC/Floodplain Administrator and submitted along with Part 1, Part 2, and the Preliminary.
Technical Review (if requested) to USACE, local signatories, NCTCOG, TNRCC & FEMA, whose addresses are
listed in Appendix F of the CDC Manual.)
If a project falls partially or completely in the Regulatory Zone, this form should be completed.
1. City/County of:
CDC/Floodplain Administrator:
Telephone No:
_ 2. Part or all of project is within the CDC REGULATORY ZONE. Yes [] No []
If the answer to this question is No, NO CDC PERMIT is required and this form does not have to be completed.
3. Exempt Category: (check if applicable - additional documentation may be required)
[] maintenancedrepair of flood control structures
[] ouffall/intake structure permitted under N-PDES program
-- [] discharge of material for backfill or bedding for utility lines with no change to bottom contours
[] bank stabilization activities
[] other
4. State/Federal Review likely to be required:
a. FEMA Conditional Letter of Map Revision (CLOMR) [] Yes [] No
-- b. USACE Section 404 Permit & TNRCC State Certification [] Yes [] No
Pursuant to Clean Water Act Section 401 (required for projects
involving dredging or filling in Waters of the US)
_ c. TNRCC Plan of Reclamation (for levee improvement districts only) [] Yes [] No
5. Administrative Comments:
6. rip sent to: USACE? ~ Local Signatories? NCTCOG? ~ FEMA? ~
-- TNRCC?
-- By my authority under the City/County, I hereby issue and record the City/County's findings. This notice of
Intent to Process in no way implies that final project approval will be granted by the City./C~unty..
Signature of CDC/Floodplain Administrator / Typed Name / Title Date
CDC Tracking Code:
- FINAL CDC ACTION/FINDINGS FOI M
(To be filled out by CDC/Floodplain Administrator and submitted to NCTCOG)
1. CDC Action: (check one) [] permit granted Date
El permit granted w/conditions (explain in #8) Date
[] permit denied
2. City Action if Variance was requested: [] granted (explain in #8) [] denied [] N/A
_ 3. Listing of Commentators (written comments on this application were received from):
4. USACE Preliminary Technical Review completed? [El Yes (attached) r'l No (explain)
5. Operation and Maintenance Agreement: [] executed (attach copy) [] not applicable (explain)
Date/Initials:
-- 6. The CDC will cease to be in effect:
[Z] five years after the date of issuance if no development activities are undertaken
[] DATE: (if different from 5 years)
?. Final Findings of Fact: (summary, of City or County's findings/comments/conditions)
8. Project Changes: Is the project substantially the same as the project described in Pans 1 & 2 of the Standard
CDC Form? [] Yes [] No
If no, please explain:
By my authority under the City/County, I hereby issue the Cit~/County's findings and final action.
Signature of CDC/Floodplain Administrator / Typed Name /Title Date
Storage Volume Bases on
Trapezoidal Approximation
Elev. Area Inc. Vol. Tot. Vol.
Ft. SF CF AF
\ \ 437 13528 0 0
...................... 438 29913 21720.5 0.498634
? \\ 439 32069 30991 1.21009
`\\\ \\ \ 440 34372 33220.5 1.972727
\ \\ 441 36726 35549 2.78882
��.\ \ \\\\ 'F, 442 39160 37943 3.659871
443 42943 41051.5 4.602284
\
... i. 444 46029 44486 5.623542
445 49258 47643.5 6.717287
1 ' `. \ �, 446 52644 50951 7.886961
e".4.-*-,,„\ \ �n
1` 4i4yT\ `•ssa-""-/ p .i
ae
\ m
0 410 /
o� SR. \ 2 Q /
/
ti `� � ` 9s \ o W �./�t `
e ' R �. , F / y /cn' PROP. DRAINAGE ESMT. �• , ` \\ // 5.y.
//
7=69"29'09' I %11111, e / � �'
R=75.00' ' +'�� ••......\
T=52.02' i l�I, ���.� '``'_����iI/� ♦'
L=90.96 .5 1f00.0-- / ���m- ,�`+VIII- •
ii� ■■tea«i IMMINO i7 U�a // \
PROP. 30' DRAINAGE ESMT. I I, ii��^ i����i������` �""r''�"■��
� `'�''� — �"'■"'�/ / ���,` Morrison Hydrology Engineering, Inc.
` 442 I♦O.
INE = C _� _._ L /
Allr .-
_�� 11�„ _ __ , __ 210 Arnold Ave. Fax Texas 76010
(817) 461-0321 Fax(817) 274-1338
In
+ r"n■■�■�s a 2 / / —
/ Townhouses of Coppell
Q� 443
7=25'50'31" EXISTING 54 CITY OF IRVING YYATER LINE Storage Compensation Pond
,________ Coppell, Texas
R=75.00'
T=17.21'
L=33.83'
i.---- Scale: 1"--50' Date: 8/00
.-" " ...... ,". ' ~-- "- \' ~'.:'. ' '"1 't i ./ ' ".,. ' . ....... ; ............................. . ' ',
, , -. ~ ~ ..,. ,.~ ... ....... ... E ,- ~ ~ . . .
. - - ~ ~'-, ,,.. ---~ I. - , '; - · '~ - ! '-. ·
,i ." / t'~ ;-,.".- . ~ /'] · -~ ; ," ..:.. ." .. -¥' ,'.. . I I ~ ' ".. ',-' '
.~ [ /' ' ~'"--/I '' , '/ ' ' / ' .':. i i ~ ' '~ -- . - · - ---'-c~ '~ '
~ i i ",'" " ........... r .').". .... '~' ." ~ .-'.".' ~7 ~ ~ ~ '~ i~
'- .'/..' ' . · .- ' r"-'· ','. ..-~'~-~''// ,'~ '·· ' / - ~ · , ~,~ ,v --
/
· L' ,," '.,/ ;.' ,"' ~ i ' ' -"
· ' ,,m-/ ,b ..",.. '.." / '"~ ." H'" : . //'., x / ,- : - . ,
,'.'"" -..t_, ..,........,'V,' ," ..." ,' ," , ';
"~<,'" ,'}"'.' ' / / I ,~ .... '~ ~-'l ." '
" ,.",,.-"?-:.~ -"-' '-' ;' 'i '.¢ ....... ' · ,"0 J' .,~
/- ...,. ,' f-.,. ..... ~ · .-. · ~ :.
,., ..' ,,' / . .. ¢ ,'~-/ / ,:'
.-',. .' ~ ~ ' .--_~ , /~ I ...' / " ~ ..... ' ' " -'%'~ ~ '- '. ' "1 1
.... :~,...,.~., ,' 1 ......... ~.. /, -, , ,. ~ -. ,-, .. -
,, \ I * ......... . ..... _. ..,' /' / .- -" '-...-"' I ' '- · · / . " ' "" ' '
,.,.,)'!1 .' , · . ..... ¢ ~ ,' ..... . · , ~ '. ./' .- , .'/ .'.
",.'.,'-. ' - ~: -~..'.-. '-:' .' ~ : ~ ~ ;~ ~..~ .- '. ~-~ , :._~'~-,;- -- -' "'=-=-:'- ' .- = .... ' ........ %'"-'~'~ ....... ~ ? // ' J / ~ .' ·
., , '\ ': ~" ..' . ..... i .' .-.' ," ' ~ / ¢, .. ......... " , ._' ,,- . .,'/. I17' .-... ." .'
",/ ,' I ." ~ --" .-"' -" / '" ," ! z , '~ ~ "! ' ',~ - ' .' '
. . ~ ' // .... \ .
~ .... ...' .. · .,,.-.._,. .... ~-.**~.."-..~.... .... ;;'-.,.., . ,,;,.:
, . / .,. /,,/,/ .. . '...-,.. ...',~.~r,,/ .
, - ...C-..~.~,X:.
.......... · - / / ./.,,{' . ~ '., ~ 'q,..
,,. '; ,/.. ,,' / ~ ..
..... ~', .. -"'?'/ ' 4'" '
......... ' ' '" k '"¥-"..":'"-'., ,' "'-" "
,. I'""; r' '~ ""'
EXISTING 100 year an~ spf volume 10 AC SITE ~
_ * m~c-2 WA~ S~AC~ ~O~=S * 10 ACRE TRACT ~.s. m taus o~ ~m
' Version 4.6.2; ~ 1991 ' · 609 SE~ S~, SUI~ ~
- - ' DAVIS, ~IA 95616-%6
' R~ DA~ 21J~99 TI~ 15:~6:43 * ' (916) 7S6-110~
X X X.X~XXXX X.XXXX XXXXX
X X X X X X X
X X X X X
XX.v~.XXX XX.XX X XX.v~.X XXX.XX
X X X X X
X X X X X X
X X ~ XX.XXX
EXISTING 100 year and spf volume 10 AC SIT~ ~
21JAN99 15: 46: 43 PAGE
THIS R~ EX~o'I'ED 21JAN99 15:46:43
H~C-I WATI~ SURFACE PROFILES
Version 4.6.2; May 1991
T1 VOLUM~ D~-~'~a~4LNATION FOR SIT 1/9/99
T2 ELM FORK OF THE TRINITY
T3 I00 ~ D~IGN CITY OF COPPELL FILE: VOL10E
J1 ICH~CK
0 2 0 0 0 0 0 0 445.25 0
J2 NPROF [PLOT PP.e'VS X~ECV XSECH ~ ALLDC IBW CHNIM IT~ACE
i 0
J3 VARIABr-~ CODES FOR SUPI~ARY PRINTOUT
39 1 4 7 25
J5 LPRNT NU~4SEC ***--**-R~QU~STED SECTION NUMBERS*e***--'
-10 -i0
QT 2 1000 i000
NC .05 .OS .05 .1 .3
X1 i 6 0 695 0 0 0
X5 2 445.2S 450.3
G:~ 451 0 442 0 446 465 448 5TS 450
GR 452 695
X1 2 7 0 635 i00 100
X5 2 44~.21 450.15
GR 451 0 442 0 444 S0 446 260 448 S4O
GR 450 620 452 635
X5 2 445.1 450.2
GR 451 0 442 O 444 75 446 475 448 550
GR 450 570 452 S90
Xi 4 7 O 635 200 200 200
X5 2 445 450.1
GR 451 0 442 0 444 200 446 495 448 595
GR 450 ~15 452 635
T1 VOLUM~ DE'tERMINATION FOR SI-"~E 1/9/99
T2 ELM FOP. K OF THE TRINITY Ri'ER
T3 SPF D~SIG~ CIT~ OF COPP~I.L
~ I~-I~CK INQ NINV IDIR STRT ~TRIC HVINS Q WSEL P~
0 3 O O 0 Gl 0 0 450 · 3 0
J2 NPROF iPLOT pP. FVS ~;C"~ XSEC~ PN A3.J~DC IB~ C/41~IM IT~.ACE
15 0 -1
EXISTING 100 year a~ spf volume 10 AC SIT~ ~
__ 21JAN99 15:46=43 PA~E 3
~IS R~ ~C~ 21J~/~99 15:46:43
WA~ SUILFAC~ PROFILES
4.6.2; May 1991
NOT~- ~TERISK (') AT LE~ OF C~OSS-SECTION NIF~BER INDICAT--c .MESSAGE IN SU~4ARY OF
I00 Y~ DESIGN CITY OF
SU~t~ARY ~RI. NTOUT
SEC~qO CWS~L TOPWID VOL. A~EA
1.000 445.25 377.$1 .00 613.95
1.000 450.30 673.75 .00 3416.55
2.000 445.21 177.05 .92 187.36
2.000 450.25 621.88 6.76 2475.23
3.000 %45.10 295.00 2.52 278.50
3.000 450.20 572.00 25.22 2884.21
4.000 445.00 347.50 4.25 473.75
4.000 450.10 616.00 39.32 3Z56-55
-- ~,X'~TZN~ XO0 7ea~ a~ ap£ volume 10 AC ~ZT'g ~
21JAN99 15: 4~: 43 ~A~E
SU~E~ARY OF ERRORS AND $~ECIAL NOTES
NOTE SE~NO= i .0a0 PROFILe= i WS~r- HASED ON X5 CARD
NOTE SE~N0= ~.0a0 PROFILe- 2 WSEL BA~ED ON XS CARD
WA~2/ING SECNO= 2. 000
NO~ S;~= 2.000 PRO~= 2 WS~
NO~ S~= 3.000
................................ ]0 ACRE TRACT
~C-2 WA~ S~AC~ ~O~S ~ ~ U.S. ~ ~S OF
Version 4.6.2; May 1991 * * 609 SECO~ S~, SUI~ D
R~ DA~ 21J~9 TI~ 15:50:~1 * ' (916) 756-110~
X X X~'~XXXX XXXXX ~
X X X X X X X
~ X X X X X
XXXXXXX XXXX X XXXXX XXXXX
X X X X X
X X X X X X
X X X.'C~XXXX XXXXX XXXXXXX
PROPOSED 100 ye~ ~ ~pf volume 10 AC $IT~ ,
21J~/~99 15: 50: 31 PAGE I
.-"HIS RUN EX~CLrI'~.b 21JA/q99 15:50:31
.~C-2 WA~ER SURFAC~ PROFILES
Versic~x 4.6.2; May 1991
T1 VOr.U~E Dmr~u~INATION FOR $IT~ 1/9/99 PROPOSED COND.
T2 ELM FORK OF THE TRINITY RIVER
T3 100 ~ D~SIG~ CITY OF COPPELL FIV-~: voll0p
J1 ICP~CK INQ NINV IDIE STET METRIC HVINS Q WSEL FQ
0 2 0 0 0 0 0 0 445.25 0
J2 I~PROF IPLOT ~m.~'~S X~ECV XSE~ ~-~ AT-T.~C
1 0 '1
J~ VA/~IA~r.~ CODP.~ FOR SU~A~Y PRINTOUT
38 I 4 7 25
J5 Lug R.~'T I~.S EC *-----**REQUESTED SE~.. I0N
-10 -10
QT 2 1 1000
NC .05 .05 .05 .i .3 ,
X1 1 T C 695 0 0 0
X5 2 445.25 450.3
GR 451 0 446 . 25 0 446 . 25 465 446 . 15 475 . 75 448 575
GR 450 670 452 695
Xl 2 $ 0 635 100 100 i00
X5 2 445.21 450.25
GR 451 0 446.21 0 446.21 50 446.21 260 446.21 289.
X1 3 8 0 590 ~00 300 300
X5 2 445. i 450.2
GE 451 0 446 . 1 0 446 . 1 75 446 . 1 4.'5 446 . 1 479
GE 448 550 450 570 452 590
X1 4 ? 0 635 200 200 200
XS 2 445 450.1
GR 451 0 445 0 446 200 446 495 445 595
GR 450 615 452 635
PI~OPOSED 100 yew an~ sp£ volume 10 AC SITE
21JAN99 15: 50: 31 PAGE
TI VOr.UM~ DJ~-%'~KI~INATION FOR SITE 1/9/99
T2 Er~M FOP. K OF TH~ T~INITY RI'~R
%'3 S~F DESIGN CITY OF COPP~.LL FILE:
J1 IC~CK INQ NLNV IDIR STRT MB'r~ RIC HVINS Q WSEL FQ
0 3 O 0 0 0 0 0 450.3 0
J2 NPROF iP~OT P~--VS X~S~C"7 XSE~ FN AJ.J~D C IBW ~--~HNIM
15 o
~ROPOSED 100 year and. apf~ vo].ume 10 AC STT; ~'
~... 21J~N99 15:50:3~ PAGE 3
.ri'HiS RUN EX~C"~ 21JAR*99 15:50:31
WATE~ SURFACE PROFILES
Versi~ ~.6.2; Ma~ 1991
~T~ISK (*) AT ~ OF ~SS-SE~ION ~ I~I~S ~SAGE IN S~Y OF ~O~ LEST
~ D~I~ CI~ OF
SE~ ~SEL ~ VOL
1.000 ~47.25 533.75 .00 506.25
1.000 450.30 673.75 .00 2368.59
2.000 447.21 429.%0 .99
2.000 %50.25 621.88 ~.08 2057.55
3.000 447.10 516.37 ~.95 497.68
3.000 450.20 572.00 19.78 2211.75
4. 000 ~47. O 0 545.0O 6.28 520.00
4.000 ~50,I0 616.00 30.28 2361.~S