Trinity Shores-CS010416 T H E C I T Y 0 F ~
COPPELL
April 16, 2001
Dan Grant
Kimley-Hom and Associates, Inc.
12700 Park Central Drive, Suite 1800
Dallas, TX 75251
RE: Conditional Letter of Map Revision Trinit3, Shores
Engineering Services Contract review'
Dear Mr. Grant:
The enclosed flood study is processed to you in accordance with our contract with
Kimley-Hom for the review ood studies for the City of Coppell.
Under the terms of the . the review fee for this Conditional Letter of Map Revision is
based on a lump of $2000. This project also requires a CDC review and permit
which is an lump sum fee of $1000.
If you should an)' questions concerning this please feel free to contact me at (972)304-
3686.
Ito. t e
4-
1
Kenneth M. Griffin, P.E. VI O ~ ~r~.-oo J~ ~ ~
Director of Engineering/Public Works ~~,~ dc-. lb' [ % ~~ $~"-~
file/floodplain/trini¢'shores
............................................
255 PARK~AY ~l{ P O BOX 478 11{ COPPELL TX 75019 ~l{ TEL 972:462 0022 ~ FAX 972/304 3673