Loading...
Summit P2-CS 990205 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Mike Martin, P.E. Asst. City Engineer * Kenneth M. Griffin, P.E., Dir. of Engineering/Public Work~ I~ Date: February 1, 1999 RE: Final Acceptance Letters pa~. ent In reviewing information from the Finance De , I noticed that as of this date we have not provided an acceptance letter o'~Summlt at the Springs~'~z the Finance Department for tracking of the erosion control escrow. Is that project final and if so a f'mal acceptance letter needs to be provided to the Finance Department?