Summit P2-CS 990205 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Mike Martin, P.E. Asst. City Engineer *
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Work~ I~
Date: February 1, 1999
RE: Final Acceptance Letters
pa~. ent
In reviewing information from the Finance De , I noticed that as of this date we
have not provided an acceptance letter o'~Summlt at the Springs~'~z the Finance Department
for tracking of the erosion control escrow. Is that project final and if so a f'mal acceptance
letter needs to be provided to the Finance Department?