Summit P2-CS 980903DEVELOPMENT REVIEW COMMI'I 'I 'EE
ENGINEERING COMMENTS
ITEM:
Summit at the ,5_orin_ps. Pb_,zee L Re?at of Lots 36 and .;7. Block B and
Summit at the Sprin_os. Phase H. R__~_~ of Lots $1..;4. ~1. ~2. and 45. Block
B to allow the recordation of the new flood limit on selected lots along the
west side of Lexington Avenue and Edmondson Drive at the request of
Dowdey,/lndersen and Associates
DRC D/ITE: ~4ugust 27,1998 to September $,1998
CONT~I CT: Mil~ Martin, P.E., ~4ssistant City Engineer 004-3679)
COMMENT STATUS:
D I~ ~T T7&/i'T~T A 70'T/
,4F/'ER-g6~
No Comments.