Loading...
Summit P2-CS 980903DEVELOPMENT REVIEW COMMI'I 'I 'EE ENGINEERING COMMENTS ITEM: Summit at the ,5_orin_ps. Pb_,zee L Re?at of Lots 36 and .;7. Block B and Summit at the Sprin_os. Phase H. R__~_~ of Lots $1..;4. ~1. ~2. and 45. Block B to allow the recordation of the new flood limit on selected lots along the west side of Lexington Avenue and Edmondson Drive at the request of Dowdey,/lndersen and Associates DRC D/ITE: ~4ugust 27,1998 to September $,1998 CONT~I CT: Mil~ Martin, P.E., ~4ssistant City Engineer 004-3679) COMMENT STATUS: D I~ ~T T7&/i'T~T A 70'T/ ,4F/'ER-g6~ No Comments.