Summit P2-CS 980827DEVELOPMENT REVIEW C OMMITFEE
ENGINEERING COMMENTS
ITEM:
Summit at the St, rOt_es. Phase L Replat o_£ Lots 36 and 3Z Block B and
Summit at the Sprinp_s. Pkase IL R~_ !__~ o_f Lots 31. 34. 41. 42. and 43. Block
B to allow the recordation of the new flood limit on selected lots along the
west side of Lexington Avenue and Edmondson Drive at the request of
Dowdey,,4ndersen and Associates
DRC DA TE: August 27, 1998 to September 3,1998
CONTACT: Mike Martin, P.E., Assistant City Engineer 004-$679)
COMMENT STATUS:
1. Provide the floodplain paragraph on drawings.