Loading...
ST9601-BD 980428 BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 1 - Paving and Drainage Improvements # U Description I i~ n t e ~ i ~ t RI I-I 1 LS Prepare Right Of-Way I-2 110 LF Remove existing COncrete Curb or COncrete Curb & Gutter 1-3 4219 CY Unclassified Street Excavation 1-4 5555 SY 8' Lime Stabilized Subgrade 1-5 85 TON Lime for Subgrade Stabilization 1-6 5310 SY 7' Reinforced Concrete Pavement w/6" Integral Curb 1-7 110 LF COncrete Street Header 1-8 125 SY COncrete Paving-Stone Pavement I-9 120 LF 3' PVC COnduit Sleeve for Freeport Pkwy Intersection 1-10 2 EA Pull Boxes 1-11 4 EA Adjust Existing Water Valve Box to Grade 1-12 1 LS Restore Parkways & Yards Block Sad (Approx 575 SY) 1-13 1 LS Restore Parkways & Yards Hydromulch (Approx 2450 SY) 1-14 27 LF Thermoplastic 18" Stop Bars (Type 1) 1-15 3 EA Thetmoplastjc Directjonal Arrow Pavement Marking (Type 1) 1-16 I EA Thermopiastic Word CONLY') Pavement Marking (Type 1) 1-17 10 EA Type P-TW 4" White Non-Reflective Traffic Buttons Tiseo Paving Co. 419 E. Hwy. 80 Mesquite, TX 75150 972/2890723 Unit ] Total Price Price 67,000.00 67,000.00 2.00 220.00 4.50 18,985.50 1.50 8,332.50 100.00 8,500.00 23.50 124,785.00 5.00 550.00 70.00 8,750.00 10.00 1,200.00 1,000.00 2,000.00 100.00 400.00 5,000.00 5,~00.00 5,000.00 5,000.00 12.00 324.00 220.00 660.00 400.00 400.00 Ed Bell Construction Co. McMahon 10605 Harry Hines BIrd. Contracting, Inc. Dallas, TX 75220 P.O. Box 153086 214/358-6581 Irving, TX 75015 972/399-1951 Unit Total Unit ] Total Price Price Price Price 10,000.00 10,000.00 18,500.00 18,500.00 4.00 440.00 8.00 880.00 8.00 33,752.00 11.00 46,409.00 2.00 11,110.00 1.80 9,999.00 125.00 10,625.00 95.00 8,075.00 27.50 146,025.00 26.50 140,715.00 11.00 1,210.00 9.00 990.00 75.00 9,375.00 43.00 5,375.00 6.50 780.00 5.00 600.00 300.00 600.00 300.00 600.00 125.00 500.00 150.00 600.00 2,~00.00 2,0~0.00 3,000.00 3,000.00 2,200.00 2,200.00 5,000.00 5,000.00 9.00 243.00 12.00 324.00 260.00 780.00 175.00 525.00 260.00 260.00 290.00 290.00 5.50 55.00 5.00 50,00 Unit } Total Price Price Unit Price Total Price BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT 1 - Paving and Drainage Improvements # U I t i Description 1-18 10 EA Type P-15W 4" White Reflective Traffic Buttons 1-19 103 EA Type P-117Y 4' Yellow Double- Reflective Traffic Buttons 1-20 3 EA Roadside Sign Assembly 1-21 94 LF 21" RCP (Class lID 1-22 118 LF 30" RCP (Class lID 1-23 117 LF 36" RCP (Class lit) 1-24 14 LF 42' RCP (Class Ill) 1-25 295 LF 48" RCP (Class Ill) 1-26 401 LF 54" RCP (Class IIl) 1-27 18 LF 60' RCP (Class lID 1-28 4 EA Plug for 30' RCP 1-29 I EA Remove Top of Exist. Drop Inlet & Construct 4' Square SDMH Top 1-30 1 EA 4' Square Storm Drain Manhole 1-31 1 EA 10' Recessed Curb Inlet 1-32 l EA 12" Recessed Curb Inlet 1-33 3 EA 14' Recessed Curb Inlet 1-34 1057 LF Trench Safety for Storm Drain Installation SUBTOTAL UNIT I - Section 1 II (Bid ll~ms I-1 thru 1-34) BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 1 - Paving and Drainage Improvements Tiseo Paving Co. Ed Bell Construction Co. 419 E. Hwy. 80 10605 Harry Hines Blvd. Mesquite, TX Dallas, TX 75220 75150 214/358-6581 972/289-0723 Unit Total Unit I Total Price Price Price Price 6.00 60.00 6.60 66.00 8.00 824.00 6.60 679.80 440.00 1,320.00 250.00 750.00 38.50 3,619.00 42.00 3,948.00 52.50 6,195.00 57.00 6,726.00 70.50 8,248.50 80.00 9,360.00 96.00 1,344.00 1 I0.00 1,540.00 108.50 32,007.50 125.00 36,875.00 133.50 53,533.50 150.00 60,150.00 178.50 3,213.00 190.00 3,420.00 152.50 610.00 100.00 400.00 1,400.00 1,400.00 2,000.00 2,000.00 1,90000 1,900.00 4,000.00 4,000.00 1,900.00 1,900.00 2,500.00 2,500.00 2,000.00 2,000.00 2,800.00 2,800.00 2,100.00 6,300.00 3,200.00 9,600.00 1.10 1,162.70 2.50 2,642.50 377,784.20 377,412 .~ ]] McMahon Contracting, Inc. P.O. Box 153086 Irving, TX 75015 972/399-1951 Unit Total Price Price 7.00 70.00 7~00 721.00 48.00 4,512.00 63.00 7,434.00 76.00 8,892.00 99.130 1,386.00 114.00 33,630.00 141.00 56,541.00 157.00 2,826.00 175.00 700.00 2,000.00 2,000.00 3,500.00 3,500.00 2,500.00 2,500.00 3,000.00 3,000.00 3,200.00 9,600.00 1.00 1,057.00 381,201.00 ] Unit Total Unit Total Price Price Price Price BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT 1 Section 2 - Water Improvements # U Description I n t i e t HI 1-35 785 LF 12" PVC Water Pipe (DR 14) 1-36 20 LF 12" Ductile Iron Water Pipe (Class 51) 1-37 40 LF 8" PVC Water Pipe (DR 14) 1-38 20 LF 8" Ductile Iron Water Pipe (Class 51) 1-39 10 LF 6' PVC Water Pipe (DR 14) 1-40 1.50 TON Ductile Iron Fittings 1-41 I EA 12" Gate Valve 1-42 I EA 8" Gate Valve I43 1 EA 6' Gate Valve 1-44 1 EA Fire Hydrant 1-45 2 EA Connect to Existing System 1-46 885 LF Trench Safety for Water Line Installation SUBTOTAL UNIT I - Section '~ (Bid Items 1-35 thru 1.46) TOTAL UNIT I BID (Bid Items I-1 thru 1.46) BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 2 - Water Improvements Tiseo Paving Co. Ed Bell Construction McMahon Contracting, 419 E. Hwy. 80 Co. Inc. Mesquite, TX 75150 10605 Harry Hines P.O. Box 153086 972/289-0723 Blvd. Irving, TX 75015 Dallas, TX 75220 972/399-1951 214/358-6581 Unit ~ Total Unit I Total Unit Total Price Price Price Price Price Price 27.00 21,195.00 37.00 29,045.00 35.00 27,475.00 49.50 990.00 47.00 940.00 39.00 780.00 31.50 1,260,00 27.00 1,080.00 29.00 1,16ff00 40.00 800.00 37.00 740.00 31.00 620.00 29.00 290.00 27.00 270.00 27.00 270.00 5,250.00 7,875.00 4,200.00 6,300.00 3,500.00 5,250.00 1,600.00 1,600.00 1,500.00 1,50000 1,200.00 1,200.00 _ I, 125.00 i, 125.00 1,200.00 1,200.00 775.00 775,00 975.00 975.00 1,100.00 1,100.00 550.00 550.00 1,800.00 1,800.12102,100.00 2,100.00 2,400.00 2,400.00 895.00 1,790.00 1,700.00 3,400.00 1,500.00 3,000.00 1.10 973.50 2.00 1.770.00 1.00 885.00 Unit Price 40,673.50 49,445.00 44,365.00 418,457.70 416,857.30 425,566.00 Total Price Unit Price Total Price BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 2 - Water Improvements # U I 11 t i e t II-1 1 LS Description BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 2 - Water Improvements Tiseo Paving Co. Ed Bell Construction Co. McMahon 419 E. Hwy. 80 10605 Harry Hines Blvd. Contracting, Inc. Mesquite, TX Dallas, TX 75220 P.O. Box 153086 75150 214/358-6581 Irving, TX 75015 972/289-0723 972/399-I951 Unit ~ Total Unit Total Unit I Total Unit ~ Total Price Price Price Price Price Price Price Price PREPARE RIGHT-OF-WAY 128,0(10.0 128,000.00 10,000.00 0 11-2 250 LF Remove Existing Concrete Curb or 2.00 500.00 4.00 Concrete Curb & Gutter I1-3 675 SY Remove Existing Concrete Pavement 4.00 2,700.00 5.00 II-4 1605 SY Remove Existing Concrete Driveways, 4.00 6,420.00 5.00 Valleys and Sidewalks 11-5 1 EA Remove and Relocate Existing Street 5,000.Be 5,000.00 2,000.00 Light Assembly II-6 11447 CY Up, classified Street Excavation 5.75 65,820.25 8.00 II-7 19665 SY 8" Lime Stabilized Subgrade 1.00 19,665.00 2.00 I1-8 295 TON Lime for Subgrade Stabilization 100.00 29,500.00 125.00 11-9 18815 SY 7' Reinforced Concrete Pavement w/6' 22.00 413,930.00 27.50 Integral Curb lI-10 215 LF Concrete Street Header 5.00 1,075.00 11.00 II-ll 1645 SY 6" Reinforced Concrete Driveways, 27.00 44,415.00 35.00 Driveway Transitions & Valleys II-12 860 SY 6' Type 'A' Grade 1 Flexible Crushed 7.00 6,020.00 10.00 Stone Base for DW/Pavement Transition 11-13 860 SY 2" Type 'B' HMAC for Driveway & 12.00 10,320.00 10.00 Pavement Transition 11-14 860 SY 2" Type 'D' HMAC for Driveway & 12.00 10,320.00 10.00 Pavement Transition 11-15 2445 SF 4" Reinforeed Concrete Sidewaik and 3.00 7,335.00 3.50 Barrier-Free Sidewalk Ramps I1-16 195 SF Modular Concrete Block Retaining Wall 25.00 4,875.00 25.00 II-17 9 EA Adjust Existing Manhole to Grade 600.00 5,400.00 650.00 10,000.00 88,500.00 88,500.00 1,000.00 8.00 2,000.00 3,375.00 16.00 t0,800.00 8,025.00 4.00 6,420.00 2,000.00 3,900.00 3,900.00 91,576.00 11.21 128,320.87 39,330.00 1.65 32,447.25 36,875.00 95.00 28,025.00 517,412.00 24.50 460,967.50 2,365.00 9.00 1,935.00 57,575.00 27.00 44,415.00 8,600.00 10.50 9,030.00 8,600.00 8.50 7,310.00 8,600.00 8.50 7,310.00 8,557.50 3.10 7,579.50 4,875.00 23.00 4,485.00 5,850.00 350.00 3,150.00 Unit I Total Price Price BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT II Section 1 - Paving and Drainage Improvements I # U Description t 11 e i lrl t 11-18 22 EA Adjust Existing Water Valve Box to Grade 11-19 2 EA Adjust Existing Sanitary Sewer Cleanout to Grade II-20 4 EA 11-21 400 LF 11-22 1 LS 11-23 1 LS II-24 1 LS II-25 145 LF II-26 7 EA II-27 4 EA 11-28 18 EA Type P-7W 4" White Non-Reflective Traffic Buttons 11-29 18 EA Type P-15W 4' White Reflective Traffic Buttons II-30 375 EA Type P-117Y 4" Yellow Double Reflective Traffic Buttons It-31 6 EA Roadside Sign Assembly II-32 216 LF 18" RCP (Class lit) II-33 116 LF 21" RCP (Class lID CONTINUE ON NEXT PAGE Adjust Existing Fire Hydrant to Grade800.00 Replace VehicleDetector Loops 6.00 Reconstract Existing Berms at Enterprise2,000.00 Drive Restore Parkways & Yards - Block Sod40,000.00 (Approx. 9450 SY) Restore Parkways & Yards - Hydromulch (Approx. 4475 SY) Thermoplastic 18" Stop Bars (Type 1) Thermoplastic Directional Arrow Pavement Marking (Type 1) Thermoplastic Word ("ONLY") Pavement Marking (Type 1) BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT II Section 1 - Paving and Drainage Improvements Tiseo Paving Co. Ed Bell Construction Co. 419 E. Hwy. 80 10605 Harry Hines Blvd. Mesquite, TX Dallas, TX 75220 75150 214/358-6581 972/289-0723 Unit Total Unit I Total Price Price Price Price 200.00 4,400.00 125.00 2,750.00 250.00 500.00 250.00 500.00 3,200.00 1,000.00 4000.00 2,400.00 8.00 3,200.00 2,000.00 5,000.00 5,000.00 40,000.00 32,000.00 32,000.00 5,000.00 5,000.00 4,000.00 4,000.00 12.00 1,740.00 9.00 1,305.00 220~00 1 ~540.00 260.00 1,820.00 400.00 1,600.00 26000 1 ~040.00 4.00 72.00 5.50 99.00 6.00 108.00 6.60 118.80 8.00 3,000.00 6.60 2,475.00 450.00 2,700.00 250.00 1,500.00 34.50 7,452.00 52.00 11,232.00 39.00 4,524.00 56.00 6,496.00 McMahon Contracting, Inc. P.O. Box 153086 Irving, TX 75015 972/399-1951 Unit Total Price Price 150.00 3,300.00 375.00 750.00 750.00 3,000.00 6.00 2,400.00 7,500.00 7,500.00 35,0~0.00 35,000.00 9,000.00 9,000.00 12.00 1,740.00 195.00 1,365.00 300.00 1,200.00 5.00 90.00 7.00 126.00 7.00 2,625.00 200.00 1,200.00 40.00 8,640.00 49.00 5,684.00 Unit Total Unit Total Price Price Price Price BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT II Section 1 - Paving and Drainage Improvements I # U t n e i 111 t Description 11-34 10 LF 24" RCP (Class I11) 11-35 263 LF 27' RCP (Class 11I) II-36 187 LF 30" RCP (Class lit) II-37 66 LF 36' RCP (Class Ill) II-38 40 LF 42" RCP (Class lIB 11-39 432 LF 4' x 3' Concrete Box Culvert ll~0 1298 LF 5' x Y Concrete Box Culvert I1-41 250 LF 6' x Y Concrete Box Culvert II-42 39 LF Double 6' x Y Concrete Box Culvert II-43 I EA 4' Square Storm Drain Manhole 11-44 I EA 5' Square Storm Drain Manhole 11-45 I EA 6' Square Drop Inlet II-46 2 EA Special 4' Sq Storm Drain Access Manhole / Box Culvert (Modi. TypeB) I1-47 5 EA 10' Recessed Curb Inlet 11-48 5 EA 12' Recessed Curb Inlet 11-49 1 EA Plug for 18" RCP I1-50 I EA Plug for 30" RCP It-51 2 EA Plug for 6'xY Concrete Box Culvert II-52 898 LF Trench Safety / Storm Drain Installation 11-53 2019 LF Trench Safety / Box Culvert Installation BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT lI Section 1 - Paving and Drainage Improvements Tiseo Paving Co. Ed Bell Construction Co. 419 E. Hwy. 80 10605 Harry Hines Blvd. Mesquite, TX Dallas, TX 75220 75150 214/358-6581 972/289-0723 Unit Total Unit Total Price Price Price Price 71.00 710.00 61.00 610.00 47.00 12,361.00 69.00 18,147.00 54.50 10,191.50 74.00 13,838.00 75.00 4,950.00 95.00 6,270.00 96.00 3,840.00 125.00 5,000.00 121.50 52,488.00 145.00 62,640.00 135.50 175,879.00 175.00 227,150.00 173.50 43,375.00 205.00 51,250.00 342.00 13,338.00 500.00 19,500.00 1,850.001,850.00 4,600.00 4,600.00 2,000.002,000.00 5,000.00 5,000.00 2,100.002,100.00 6,200.00 6~200.00 1,725.003,450.00 2,500.00 5,000.00 1,850.00 9,250.00 2,500.00 12,500.00 1,950.00 9,750.00 2,800.00 14,000.00 132.00 132.00 65.00 65.00 158.00 158.00 130.00 130.00 945.00 1,890.00 400.00 800.00 1.10 987.80 2.00 1,796.00 2.10 4,239.90 4.60 9,287.40 McMahon Contracting, Inc. P.O. Box 153086 Irving, TX 75015 972/399-1951 Unit Total Price Price 55.00 550.00 59.00 15,517.00 63.00 11,781.00 76.00 5,016.00 100.00 4,000.00 134.00 57,888.00 154.00 199,892.00 191.00 47,750.00 385.00 15,015.00 4,000.004,000.00 5,000.005,000.00 3,000.003,000.00 3,000.006,000.00 2,100.00 10,500.00 2,400.00 12,000.00 150.00 150.00 175.00 175.00 350.00 700.00 1.00 898.00 1.00 2,019.00 Unit Total Unit Price Price Price ITotal Price SUBTOTAL UNIT It - Section 1 I 1,194,471.45 (Bid Items II-1 thru H-53) 1,355,935.20 1,332,066.12 BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT II Section 2 - Water And Sanitary sewer Adjustments # I t e II-54 1 1[-55 1 11-56 1 Ib57 1 II-58 1 II-59 t II-60 1 II-61 1 11-62 15 11-63 4 11-64 1 11-65 1 II-66 390 U Description 11 i t LS Adjust/Lower Existing 12" Water Line - Sta. 9+14 LS Adjust/Lower Existing 12" Water Line - Sta. 18+00 LS Adjust/Lower Existing 12" Water Line - Sta. 23+00 LS Adjust/Lower Existing 12" Water Line - Sta. 28+00 LS Adjust/Lower Existing 12" Water Line - Sta. 29+65 LS Adjust/Lower Existing 12" Water Line - Sta. 37+20 LS Adjust/Lower Existing 12" Water Line - Sta. 43+57 LS Adjust/Lower Existing 8~ Water Line - Sta. 33+00 LF Concrete Encuase Existing Sanitary Sewer EA Remove/Relocate Existing Fire Hydrant Assembly EA Fire Hydrant EA 6' Gate Valve LF Trench Safety / Untility Adjustments Subtotal UNIT II - Section 2 (Bid Items 11-54 thru 11-66) BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT II Section 2 - Water and Sanitary Sewer Adjustments Tiseo Paving Co. 419 E. Hwy. 80 Mesquite, TX 75150 972/289-0723 Unit Total Price Price 4,200.00 4,200.00 3,400.00 3,400.00 3,150.00 3,150.00 3,150.00 3,150.00 3,700.00 3,700.00 3,150.00 3,150.00 3,300.00 3,300.00 2,000.00 2,000.00 81.00 1,215.00 1 ~900.00 7,600.00 1,600.00 1,600.00 685.00 685.00 1.10 429.00 1,194,471.45 Ed Boll Construction Co. McMahon 10605 Harry Hines Blvd. Contracting, Inc. Dallas, TX 75220 P.O. Box 153086 214/358-6581 Irving, TX 75015 972/399-1951 Unit Total Unit Total Price Price Price Price 3,800.00 3,800.00 4,500.00 4,500.00 6,300.00 6,300.00 4,200.00 4,200.00 4,300.00 4,300.00 3,800.00 3,800.00 4,300.00 4,300.00 3,700.00 3,700.00 5,200.00 5,200.00 3,700.00 3,700.00 6,000.00 6,000.00 3,700.00 3,700.00 4,300.00 4,300.00 3,700.00 3,700.00 4,000.00 4,000.00 2,300.00 2,300.00 85.00 1,275.00 35.00 525.00 2,600.00 10,400.00 1,800.00 7,200.00 2,100.00 2,100.00 2,400.00 2,400.00 1,000.00 1,000.00 550.00 550.00 4.00 1,560.00 1.00 390.00 54,535.00 40,665.00 Unit I Total Unit Price Price Price Total Price TOTAL UNIT H BID (Bid Items H-1 thru H-66) 37,579.00 1,410,470.10 1,372,731.12 TOTAL BID UNITS I & H 1,232,050.45 1,837,327.50 1,798,297.12 (Bid Items I-I thru 1-46