Loading...
Town Center L1B2-LR 980611· GEOTECHNICAL ENGINEERING E · ENVIRONMENTAL CONSULTING E GEE Consultants, Inc. · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: June II, 1998 Date Concrete Placed: June 3, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI//31 Panels Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 12 Project No.: 298-0165 s ..... sso B.,c, wa. INSPECTION DATA MATERIALS Oesc,p.on ILb.,CuYd~ Mix Number: 9506 Time Sample Batched: 07:59 am Cement: Time Sampled: 08:45 am Sample Location: Wall Panel Grid 3 from G-H Fly Ash: Truck/Ticket No: 632/1064079 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 76°F Concrete Range: 88°F Fine Aggregate: Slump Range (inches): 5~A" Admixtures: Weather Conditions: Partly Cloudy 1 Time Started: 05:00 am 2 Time Completed: 10:30 am Added Water: 15 Gallons Sample Air Content ( %): 1.5 % Total Cubic Yards Placed: 110 Required Strength (Lbs./sq.in.): 3.500 Sbeclmen Measured Age Date Total Load Compressive Strength Remarl~ Number Slump lin.) IDaysl Tested (Lbs.) (Lbs./$q.ln.) CTC 49 7 0,5/1.0/98 84,240 2,980 CTC 50 28 07/01/98 51/2'. CTC 51 28 07/01/98 CTC 52 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: AS ASTM C-31.C-39.C-143 (Unleas Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppeil (2) /~ . All et~rs aM r~ are f~ t~ excl~i~ ~e of thc client to w~m t~y are address~ a~ s~ll ~ ~ re~ wi~ t~ ~ll ~ of GEE Comutm~. I~. ~ ~ of ~ *m~ mini r~clVe ~ pri~ wri,en ~roval. Our letmrs aM ~m apply ~iy to t~ sample t~t~ ~ I~t~ a~ ~ ~ ~ily i~ti~ of ~ q~tt~ of ~ntly i~nl~i ~ slmll~ pr~. · GEOTECHNICAL ENGINEERING El' ENVI~ONMENTALCONSULTING T TIN GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: June 11, 1998 Date Concrete Placed: June 3, 1998 Client: Ewing Properties prolect: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI #31 Panels Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 11 Project No.: 298-0165 Source,' SSt) Batch Wts. INSPECTION DATA MATERIALS ~,crip,ion Mix Number: 9506 Time Sample Batched: 06:01 am Time Sampled: 06:45 am Cement: Sample Location: Panel//4. N.E. comer: N. Wall from B-B.3: Fly Ash: Top-Bottom Coarse Aggregate: Track/Ticket No: 362/1063863 Intermediate Aggregate: Temperature: Ambient Range: 77°F Fine Aggregate: Concrete Range: 89°F Admixtures: Slump Range (inches): 7th" 1 Weather Conditions: Partly Cloudy 2 Time Started: 05:00 am Added Water: 20 Gallons Time Completed: 10:30 am Sample Air Content (%): 0.5% Total Cubic Yards Placed: 30 Required Strength (Lbs./sq.in.): 3.500 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tcsted (Lbs.) (Lbs./Sq.ln.) CTC 45 7 06/10/98 71,360 2,520 CTC 46 28 07/01/98 71/2" CTC 47 28 07/01/98 CTC 48 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: AS ASTM C-31.C-39. C-143 (Unless Noted Otherwise} Remarks and/$r Distribution: Superintendent was informed of slump results cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) ~ C~,~m~l~,~ Tw~. Reviewe~ by, ~ ^11 letters and reports are for the exclusive use of the client to whom they are addressed and shall hOC be repr~ucel~vJithout the full approval of GEE Consultants, Inc. The use of our ,tame must rccetve our prim' written approval. Out letters and reports apply only to the sample tested and/or inspected and are not'Wecessarily indicative of the quantttlea ol apparently identical or similar products. · GEOTECHNICAL ENGINEERING E · ENVIRONMENTAL CONSULTING GEE Consultants, Inc. · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: June 11, 1998 Ewing Properties June 8, 1998 Town Center Shopping Coppell, Texas Moisture Density Relationship ASTM D698 Project No: 298-0165 Moisture Report No. 5 Test Results: Method ..................................... A Optimum Moisture Content ......................... 20.6 percent Maximum Density .............................. 93.2 pounds per cubic foot Rammer Type ................................. Manual Material Description ............................. Brown Clayey Sand (Lime Treated)Material Origin ........................... Pavement Subgrade, 150' S.W. of ........................................... Building Pad Moisture Preparation Procedure ...................... Air Dry Liquid Limit .................................. 33 Plastic Limit .................................. 27 Plasticity Index ................................ 6 Technician: AT Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors Mr. Larry Davis - City of Coppell(2) Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our l~r~ and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.  · GEOTECHNICAL ENGINEERING El' GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-$433 · Fax (214) 352-6972 GENERAL REPORT SIEVE ANALYSIS Report Date: June 11, 1998 Client: Ewii'~g Properties Project: Town Center Shopping - Coppell, Tx. Test Date: June 10, 1998 General Report No.: 1 Project No: 298-0165 Identification: Sieve Analysis of Road Mixed Material (lime treated) Method of Test: TEX-101-E Page 1 of 1 Results Location 1. 115' E. & 115' N. of SW comer of property 2. 150' E. & 50' N. of SW comer o~ property 3. 100' S. & 30' W~ of NE comer of property Actual Percent Passing! 1" Sieve /14" Sieve 100% 61.2% 100 % 55. 1%* Sl~ecifications SDHPT Item 260 - 1972 Minimum Percent Passing I~A'' Sieve #4 Sieve 100% 60% 100% 60% 100% 68.5% 100% 60% * Failed to meet project specifications Technician: JS/VW cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.