Loading...
Town Center L1B2-LR 980521-----] · G~OTECHNICAL ENGINEERING E I · ENV'RONMENTAL CONSULT'NG GEE.Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: May 21, 1998 Date Concrete Placed: April 22, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Tex~ Tri Cities Fo~dation TXI #41 Piers C ontracto r: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 2 Project No.: 298-0165 MATERIALS s ..... · SSD B~tch wu. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 9506 Time Sample Batched: 11:44 am Cement: Time Sampled: 12:20 am Sample Location: Piers: B.2-1.5 Fly Ash: Track/Ticket No: 640/1031874 Coarse Aggregate: Temperature: Intem~ediate Aggregate: Ambient Range: 68°F Concrete Range: 79°F Fine Aggregate: Slump Range (inches): 5~A'' Admixtures: Weather Conditions: Clear I Time Started: 09:30 am 2 Time Completed: 03:30 pm Added Water: 0 Gallons Sample Air Content (%): 1 ~A % Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 3,000 S~cllnen Me~u~d Age Date Total Load Comp~sive Strength Rcmark~ Number Slump (in.) (Days) Tested (LI~.) (Lbs./Sq.ln.) CTC 5 7 04/29/98 84,120 2,980 CTC 6 28 05/20/98 132,780 4,700 CTC 7 5V2" 28 05/20/98 122,200 4,320 CTC 8 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CW ASTM C-31.C-39.C-t43 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors(2) Mr. Larry Davis - City of Coppell(2) All letters ~ reports are tbr the exclusive use of the client to whom they are addressed and shall mx be reprod~l w~thout the full approval ot GEE Consultants. Inc. The nsc of oar name must rec~ve our prior written approval. Our letters and repons apply only to the sample tested and/or inspected and are'l16t ~ntessa'ily indicative of the quanttttes of apparently ~demw, al or s~mtlar producla. · GEOTECHNICAL ENGINEERING E · ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E [ · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 15 (298-0165) Method: ASTM D2922 D3017 D698 Page of 1 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppell (Lbs/CuFt) Percent I. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 18.4 Test Date: May 19, 1998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 21, 1998 Required Density (%): Min. 95% ~ Required Moisture (%): Opt +5%/-t-3% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) No. Probe Depth 3 Water Line - First Lift - Retest 43 70' W. & 10' N. of NW building corner 114.9 14.6 99.8 3 Water Line - Final Lift 44 5' S. & 20' E. of NW building corner 103.2 9.9 89.5 * 8" *Test does not meet project specifications CC' Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. l~ric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name~(~st receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.  ' GEOiECHNICAL ENGINEERING / E GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 ° Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 14 (298-0165) Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppell (Lbs/CuFt) Percent 1. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 18.4 Test Date: May 18, 1998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select ~l) 115.0 11.5 Report Date: May 21, 1998 Required Density (%): Min. 95% Required Moisture (55): Opt 3-5%/-I-3% Mat Location/Eld-vat(on (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFf) Content (%) No. Probe Depth 3 Utility Trench - Waiter Line - Retest 41 60' N. of Telephone Pole 105.8 13.5 92.0 * 4" 3 Utility Trench - Water Line - Retest 42 5' N. K Line, 8' E. of Line I 113.3 13.1 98.5 2" *Test does not meet project specifications Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) Our letters and reports are for the exclusive use of the client to whom they are addressed se of our name must receive our prior wriuen appro al. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products. · GEOTECHNICAL ENGINEERIN/'''~G ~ E · ENVI:ONMENTAL CONSULTING Consultan s Into lEI CONSTRUCT'ON M^TER'^LS TEST'NGG EE 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 13 (298-0165) Method: ~STM D2922 D3017 D698 Page of 1 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppell (Lb$/CuFt) Percent 1. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 18.4 Test Date: May 18, 1998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 21, 1998 Required Density (%): Min. 95% Required Moisture (%): Opt _5%/-F3% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) No. Probe Depth 3 2" Water Line - First Lift - Center 38 64' W. of SW building corner 100.8 14.5 87.6 * 6" 3 Electrical - Final Lift 39 60' E. of Column Line 3 & 25' S. of Column Line A 118.8 11.4 I03.3 6" Electrical - Final Lift 40 10' S. of Colmnn Line A & 100' E. of Column Line 3 118.6 11.5 103.1 6" *Test does not meet project specifica[ions CC: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) · GEOiECHNICAL ENGINEERING FI GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTLTRE OF SOIl, Density Report No. 12 (298-0165) Method: ASTM D2922 D3017 D698 Page of 1 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppeil (Lbs/CuFt) Percent 1. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 15.4 Test Date: May 15, 1998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 21, 1998 Required Density (%): Min. 95% Required Moisture (%): Opt __5%/+3% Mat Location/Elevation land/or) Lilt In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFf) Content (%) No. Probe Depth 1 Utility Trench - Telephone Line - Final Lift 35 100' N. of Telephone Pole 104.1 17.6 100.9 6" 1 Utility Trench - Telephone Line - Final Lift 36 200' N. of Telephone Pole 103.6 19.4 100.4 6" 3 Final Lift - Select Fill 37 16' of Line "G" & 10' E. of Line "2" 110.8 11.6 96.3 6" Tests meet project specifications Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppetl (2)