Town Center L1B2-LR 980519' GEOTECHNICAL ENGINEERING ~ E I: Consultants, Inc. lEI 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: May 19, 1998 Date Concrete Placed: April 20, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Royal General Contractor: Concrete Supplier and Plant: Location of Placement: Piers MATERIALS s ...... ' SSD.arch w.. INSPECTION DATA Description (Lbs/CuYd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 1 Project No.: 298-0165 Mix Number: Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Track/Ticket No: Coarse Aggregate: Temperamre: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: Slump Range (inches): Admixtures: Weather Conditions: 1 Time Started: 2 Time Completed: Added Water: 0 Gallons Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 3.000 Specimen Measured Age Date To{al Load Compressive Strength Remarka Number Slump (in,) (Days) Tested (Lbs,) (Lbs./Sq.ln.) CTC 1 7 04/27/98 106,560 3,770 CTC 2 28 05/18/98 142,160+ 5,030+ CTC 3 28 05/18/98 133,440 4,720 CTC 4 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: Contractor ASTM C-31.C-39.C-143 (Unless Noted Otherwise) Remarks and/or Distribution: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Constractos(2) Mr. Larry Davis - City of Coppell(2) All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be repmd~ without the full app~nal of GEE Comultants, Inc. The use of out tame must receive our prior written approval. Our letters and reports apply only to the sample teated and/or ~mpncted and are l~t neceusanly ~nd~cauve of the quaotmes of apparently ~dentical or stm~lar products. · GEOTECHNICAL ENGINEERING E GEE Consultants, Inc. iE] CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: May 19, 1998 Date Concrete Placed: May 08, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI/141 Footings Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 6 Project No.: 298-0165 MATERIALS s ..... / SSD ~a,~h w~. INSPECTION DATA Description (LbslCuYd) Mix Number: 9506 Time Sample Batched: 01:17 pm Cement: Time Sampled: 01:50 pm Sample Location: NE side of project Fly Ash: Track/Ticket No: 834/1045797 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 86°F Concrete Range: 82°F Fine Aggregate: Slump Range (inches): 3~A" Admixtures: Weather Conditions: Clear I Time Started: 12:30 pm 2 Time Completed: 03:30 pm Added Water: 15 Gallons Sample Air Content (%): I t.6 % Total Cubic Yards Placed: 80 Required Strength (Lbs./sq.in.): 3,500 Spemmen Measured Age Dale Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CTC 21 7 05/15/98 86,540 3,060 CTC 22 28 06/05/98 33A,, CTC 23 28 06/05/98 CTC 24 H HOLD Test Methods Utilized Fracture Regular Cylinders Made By: LW ASTM C-31.C-39,C-143 (Unless Noted Othcrwisel Remarks and/or Distribution: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) All letters and reports are for the exclusive use of the client to whom they are addressed and shall not he reproduc~l~ilix~c the. Rill approval o/" GEE Co~ullalm, Inc. The m d ~ I,alnc must receive our prior wrinen approval. Our letters and reports apply only to the sample tested and/or inspected and are mt necessarily indicative of the quantities of appansndy identical or similar products.