Loading...
Town Center L1B2-LR 980518 ° GEOTECHNICAL ENGINEERING E I GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 11 (298-0165) Method: ASTM D2922 D3017 D698 Page of 1 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppell (Lbs/CuFt) Percent 1. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 18.4 Test Date: May I4, I998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 18, 1998 Required Density (%): Min. 95% Required Moisture (%): Opt _+3% Mat Location/Elevation (and/or) Lif~ In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) No. Probe Depth 3 Gas Line - Final Lift 33 30' W. & 25' S. of SE building corner pad 111.4 9.6 96.8 6" 3 Subgrade 34 18' S. of column line 'G' & 21' E. of column line '2' 116.8 14.1 101.5 6" Tests meet project specifications' CC: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) Our letters and reports are tbr the exclusive use of the client to whom they are addressed. Th~use of our name must receive our prior written approval. Our letters and reports apply only to the san~ple tested and/or inspected, and are not necessarily indicative of the quantifies of apparently identical or similar produCXS.