Loading...
Town Center L1B2-LR 980514GEOTECHNICAL ENGINEERING GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 9 (298-0165) Method: ASTM D2922 D3017 D698 Page of 2 Client: Ewing Properties Material Description Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-Coppell (Lbs/CuF0 Percent 1. Olive Gray Clay 103.2 17.6 2. Reddish Brown Sandy Clay 99.6 18.4 Test Date: May 11, 1998 3. Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 14, 1998 Required Density (%): Min. 95% Required Moisture (%): Opt +5% Mat Location/Elevation land/or) Lift In-Place In-PLace Percent No. Dry Density Moisture Compaction Test (LbstCuPt) Content (%) No. Probe Depth 2 Phone Line Trench at East Approach - 1st lift 20 25' NW of utility pole 95.1 17.0 * 95.5 3 20' E. of column line H-i; 1st and final lift 21 119.3 13.4 103.7 8" 2 Phone Line Trench at East Approach of Sandy Lake - 1st lift 22 160' NW of utility pole 97.9 18.6 98.3 2 Phone Line Trench at East Approach of Sandy Lake - 1st lift 23 100' NW of utility pole 101.4 16.8 * 101.8 8" 3 Fire lane; Final lift 24 60' N & 31' E. of SW building corner 111.4 14.4 96.8 8" 3 Fire lane; Final lift 25 140' N & 31' E. of SW building corner 116.1 13.2 100.9 8" 3 Fire lane; Final lift 26 100' S & 52' W. of NE property line 100.9 7.4 * 87.7 * 8" Tests do not meet project spec .ons GEE Consultants, Inc. Dallas, Texas (214) 352-5433 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 9 (298-0165) Method: ASTM D2922 D3017 D698 Page 2 of 2 Client: Ewing Properties Mmfia~ Desmp~on Maximum Optimum Dry Moisture Density Content Project: Town Center Shopping-eoppell (Lbs/CuF0 Percent 1. Olive Gray Clay 103.2 17.6 Test Date: May 11, 1998 231 Reddish Brown Sandy Clay 99.6 18.4 Brown & Yellowish Brown Silty Clay 98.2 17.8 4. Yellowish Brown Clayey Sand (select fill) 115.0 11.5 Report Date: May 14, 1998 Required Density (%): Min. 95% Required Moisture (%): Opt +5% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/Cuff0 Content (%) No. Probe Depth 3 Fire lane; Final lift 27 130' S & 52' W. of NE property line 105.4 7.9 * 91.6 * 8" 3 Fire lane; Final lift 28 25' E of SE building comer 113.1 9.9 * 98.3 8" * Tests do not meet project specificauons cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and repons apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparentiy identical or similar products.