Town Center L1B2-LR 980506EOTECHNICAL E[NGINEERING J E JNVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: May 6, 1998 Date Concrete Placed: April 23, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Tri Cities Foundation TXI #41 Piers Contractor: Concrete Supplier and Plant: Location of Placement: Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 3 Project No.: 298-0165 MATERIALS Sourc*: $SD Batch w~. INSPECTION DATA Description (Lbs/CuYdi Mix Number: 9506 Time Sample Batched: 11:44 am Cement: Time Sampled: 12:15 pm Sample Location: Piers: E-l: F-l; G-I Fly Ash: Truck/Ticket No: 805/1033155 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 70°F Fine Aggregate: Concrete Range: 80°F Slump Range (inches): I V~" Admixtures: Weather Conditions: Clear I Time Started: 09:00 am 2 Time Completed: 02:30 pm Added Water: 5 Gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 3,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Numt~r Slump tin.) IDays} Tested (Lbs.) (l..bs./Sq.ln.} CTC 9 7 04/30/98 95,440 3,380 CTC 10 28 05/21/98 ll/z" CTC 11 28 05/21/98 CTC 12 H Hold Test Methods Unlized Fracture Regular Cylinders Made By: AS ASTM C-31.C-39.C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & Joiner Engineering Mr. Eric Royal - Royal General Contractors (2) Mr. Larry Davis - City of Coppell (2) cook, tarts, :~c. ~"~"'"~Lff*i~~)lj ' All letters and reports are fro' the exclusive use of the client to whom they are addressed and shall not be r thont the full approval of GEE Consultants, Inc. The use of our ~'.ame must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and ate nol necessarily indicative oftbe quantities of apparently identical or similar products. jEOTECHNICAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 PIER INSPECTION REPORT Report Date: Cliem: Project: Identification: Method of Test: May 6, 1998 Ewing Properties Town Center Shopping Coppell, Texas Straight Shaft Piers Visual Observation Inspection Date: April 30, 1997 Pier Inspection Report No. 4 Page Number: Project Number: Page 1 of 2 298-0165 Depth to Pier Shaft Bearing Req'd. Actual Total Bearing Casing # Size Strata Peru. Pent. Depth Material Depth Remarks J.1-3 54" N/A N/A N/A 5.8' Tan Sand N/A Clean, Dry, Plumb K-3 54" N/A N/A N/A 8.1' Tan Sand N/A Clean, Dry, Plumb H.4-3 54" N/A N/A N/A 5.3' Tan Sand N/A Clean, Dry, Plumb G.6-3 54" N/A N/A N/A 5.1' Tan Sand N/A Clean, Dry, Plumb F.7-3 54" N/A N/A N/A 5.1' Tan Sand N/A Clean, Dry, Plumb K-1.9 54" N/A N/A N/A 8.5' Tan Sand N/A Clean, Dry, Plumb K-1 54" N/A N/A N/A 8.0' Tan Sand N/A Clean, Dry, Plumb K-12 36" N/A N/A N/A 7.5' Tan Sand N/A Clean, Dry, Plumb J.7-3.2 2A" N/A N/A N/A 8.5' Tan Sand N/A Clean, Dry, Plumb J.9-3.2 24" N/A N/A N/A 8.2' Tan Sand N/A Clean, Dry, Plumb Consult_sots, Inc. Project No. 298-0165; Report No. 4 Page 2 of 2 Depth to Pier Shaf~ Bearing Req'd. Actual Total Bearing Casing # Size Strata Pent. Pent. Depth Material Depth Remarks SW 24" N/A N/A N/A 12.6' Tan Sand N/A Clean, Dry, Pltmalo CRNR* SE 24" N/A N/A N/A 12.8' Tan Sand N/A Clean, Dry, Plumb CRNR* NE 24" N/A N/A N/A 13.0' Tan Sand N/A Clean, Dry, Plumb CRNR* NW 24" N/A N/A N/A 12.2' Tan Sand N/A Clean, Dry, Plumb CRNR* * Dumpster cc: Mr. John Maggiore - Ewing Properties Mr. Eric Royal - Royal General Contractors(2) Mr. Hank Quigg - Richmond Group Mr. Larry Davis - City of Coppell(2) Our letters and reports are tbr the excltt.aive use or' the client to whom they are addressed. The use of our namem~Yeceive our prior written approval. Our letters and~ports apply only to the sample tested and/or i~pected, and are not necessarily indicative of the quantities of apparently identical or similar products. EOTECHNICAL E NGINEERING E ] NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 PIER INSPECTION REPORT Report Date: Client: Project: Identification: Method of Test: May 6, 1998 Ewing Properties Town Center Shopping Coppell, Texas Straight Shaft Piers Visual Observation Inspection Date: April 29, 1997 Pier Inspection Report No. 3 Page Number: Page 1 of 1 Project Number: 298-0165 Depth to Pier Shaft Bearing Req'd. Actual Total Bearing Casing # Size Strata Pent. Pent. Depth Material Depth Remarks B-3-3 54" N/A N/A N/A 10.6' Tan Sand N/A Clean, Dry, Plumb A.9-2.6 54" N/A N/A N/A 13.3' Tan Sand N/A Clean, Dry, Plumb A.7-2 54" N/A N/A N/A 12.5' Tan Sand N/A Clean, Dry, Plumb A.5-1.5 54" N/A N/A N/A 12.0' Tan Sand N/A Clean, Dry, Plumb A3.1-1.2 54" N/A N/A N/A 12.0' Tan Sand N/A Clean, Dry, Plumb A.3-1 54" N/A N/A N/A 8.2' Tan Sand N/A Clean, Dry, Plumb E.8-3 54" N/A N/A N/A 6.4' Tan Sand N/A Clean, Dry, Plumb D.9-3 54" N/A N/A N/A 6.0' Tan Sand N/A Clean, Dry, Plurab D.1-3 54" N/A N/A N/A 5.6' Tan Sand N/A Clean, Dry, Plumb C.2-3 54" N/A N/A N/A 5.8' Tan Sand N/A Clean, Dry, Plumb G-2 54" N/A N/A N/A 5.1' Tan Sand N/A Clean, Dry, Plumb H-2 54" N/A N/A N/A 5.2' Tan Sand N/A Clean, Dry, Plumb J-2 54" N/A N/A N/A 5.1' Tan Sand N/A Clean, Dry, Plumb CC: Mr. John Maggiore - Ewing Properties Mr. Eric Royal - Royal General Contractors(2) Mr. Hank Quigg - Richmond Group Mr. Larry Davis - City of Coppell(2) Mr. Steve Dial - Hunt Joiner Engineering Q~/~a. ~ I nl tothe Our I~tters and reports are for the exclusive use of the client to whom they are addl~ased. Tim use of ot/~lt~ must receive om' prior written approval. Our letters andr~on.~ apg y o y sample test*d and/or iuspcctnd, and ar~ not nece~arily indicative of the quantities of apparently ideotical or similar products.