Loading...
Town Center L1B2-LR 980429 ~, EOTECHNICAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: April 29, 1998 Date Concrete Placed: April 20, 1998 Client: Ewing Properties Project: Town Center Shopping Coppell, Texas Royal General Contractor: Concrete Supplier and Plant: Location of Placement: Piers MATERIALS s ..... ~ SSD Ba,chWu. INSPECTION DATA Description (Lbs/CuYd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 1 Project No.: 298-0165 Mix Number: Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: Admixtures: Slump Range (inches): Weather Conditions: I Time Started: 2 Time Completed: Added Water: 0 Gallons Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 3,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CTC 1 7 04/27/98 106,560 3,770 CTC 2 28 05/18/98 CTC 3 28 05/18/98 CTC 4 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: Contractor ASTM C-3[,C-39.C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group Mr. Steve Dial - Hunt & loiner Engineering Mr. Eric Royal - Royal General Constractos(2) Mr. Larry Davis - City of Coppell(2) Revie~e~by: All letters and reports are for the exclusive use of the client to whom they are addr*ssed and shall not b~ reprnduc.~d without the full approval of GEE Comulmnts, tee. TM: u~ of our nam~ must receive our prior written approval. Our letters and repo~ apply only to the sample tested and/or impectnd and are not n~cessarity indi~ttive of the quanlit~$ of apparently identical or similar prndm:ta.