REPORT OF CONCRETE MIX INSPECTION
Report Date: April 29, 1998 Date Concrete Placed: April 20, 1998
Client: Ewing Properties
Project: Town Center Shopping
Coppell, Texas
Royal General
Contractor:
Concrete Supplier and Plant:
Location of Placement: Piers
MATERIALS s ..... ~ SSD Ba,chWu. INSPECTION DATA
Description (Lbs/CuYd)
Standard 6"x12"
Area 28.27 Square Inches
Concrete Report No.: 1
Project No.: 298-0165
Mix Number: Time Sample Batched:
Cement: Time Sampled:
Sample Location:
Fly Ash: Truck/Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range:
Fine Aggregate: Concrete Range:
Admixtures: Slump Range (inches):
Weather Conditions:
I Time Started:
2 Time Completed:
Added Water: 0 Gallons Sample Air Content (%):
Total Cubic Yards Placed:
Required Strength (Lbs./sq.in.): 3,000
Specimen Measured Age Date Total Load Compressive Strength Remarks
Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.)
CTC 1 7 04/27/98 106,560 3,770
CTC 2 28 05/18/98
CTC 3 28 05/18/98
CTC 4 H Hold
Test Methods Utilized Fracture Regular Cylinders Made By: Contractor
ASTM C-3[,C-39.C-143 (Unless Noted Otherwise)
Remarks and/or Distribution:
cc:
Mr. John Maggiore - Ewing Properties
Mr. Hank Quigg - Richmond Group
Mr. Steve Dial - Hunt & loiner Engineering
Mr. Eric Royal - Royal General Constractos(2)
Mr. Larry Davis - City of Coppell(2)
Revie~e~by:
All letters and reports are for the exclusive use of the client to whom they are addr*ssed and shall not b~ reprnduc.~d without the full approval of GEE Comulmnts, tee. TM: u~ of our nam~ must receive
our prior written approval. Our letters and repo~ apply only to the sample tested and/or impectnd and are not n~cessarity indi~ttive of the quanlit~$ of apparently identical or similar prndm:ta.