Town Center L1B2-LR 980422EOTECH N ICAL
GEE Consultants, Inc.
10046 Monroe Drive
Dallas, Texas 75229
· (214) 352-5433 · Fax (214) 352-6972
PIER INSPECTION REPORT
Report Date: April 22, 1998 Inspection Date: April 20, 1998
Client: Ewing Properties Pier Inspection Report No.: 1
Project: Town Center Shopping-Coppell Page Number: Page 1 of 1
Identification: Belled Piers Project Number: 298-0165
Method of Test: Visual
Depth to
Bearing
Pier Shaft Bell Strata Total Bearing Casing
# Size Size (Penetration) Depth Material Depth Remarks
2-E 18" 54" 29'0" 31.3' Brown Sandy Shaley N/A Clean, Plumb
Clay
cc: Mr. John Maggiore - Ewing Properties Mr. Hank Quigg - Richmond Group
Mr. Steve Dial - Hunt & Joiner Engineering
Mr. Eric Royal - Royal General Contractors(2)
Mr. Larry Davis - City of Coppell (2)
All letters and reports are for tile exclusive use of [he client to whom t~ey a,"~ addressed and shall no~ be reproduced WidlOat the full approval of GEE Consultants, Inc. The use of our name must receive our prior
written approval. Our letters and repo,'ts apply only to the sample tested and/or inspected and are no~ necessarily iodicative of the quamities of apparently identical or similar products.