Loading...
Valley R Baptist-LR 940531Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Valley Ranch Baptist Church DATE: 31 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1) On-Site Fill - Grey Clay 2) On-Site Fill -Tan & Grey Clay 3) Borrow Fill - Brown Chalky Clay with Limestone Chips ASTM D 698 STANDARD PROCTOR: 1) 99.0 pcf ~ 22.0% Moisture 2) 101.0 pcf ~b 21.0% Moisture 3) 97.0 pcf ~ 20.0% Moisture 44) 45) 46) 47) LOCATION PROCTOR Sidewalk. North Side of Building AlonQ EdQe of North Parkin.q Area 25' west of east curb 80' west of east curb Sidewalk Along South Curb of Belt .Line Road 25' east of west property line 75' east of west property line LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 Final 21.6 2 Final 20.3 98.9 99.9 95+ 101.8 100.8 -2% to +4% Of Optimum 3 Final 18.6 93.7 96.6 2 Final 21.5 100.9 99.9 TECHNICIAN: DISTRIBUTION: MFM (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallaa, Texaa 75229 (214) 351-6419 Fax (214) 351-5148