Valley R Baptist-LR 940517Hooper Engineering Laboratories,
Construction Materials Testing
Inc.
REPORT OF CONCRETE TESTS
CLIENT: Valley Ranch Baptist Church
PROJECT: Valley Ranch Baptist Church Phase I, Coppell
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 94.1021
DATE: 17 May 1 994
SUPPLIER: Pioneer
Paving, west parking lot and fire lane, from 0'-15' west of
east curb and 0'-20' north of south curb
Paving, west parking lot and fire lane, from 15'-30' west of
east curb and 40'-60' north of south curb
SAMPLE DATA: SET 1 SET 2
Truck No. 296 488
Ticket No. 247007 247027
Time Batched 8:1 lam 10:32am
Time Sampled 9:10am 11:00am
Concrete Temp. (ASTM C10641 84°F 84°F
Air Content (ASTM C2311 4.8% 4.8%
Unit Weight (ASTM C1381
MIX NO. 4700
Cement 470 Type I
Flyash
Sand 1292
in.
1,0 in. 1875
Water 262
Admix #1 MBL-80 ~ 18.8 oz/yd
Admix #2
AEA MBVR @ 2.3 oztyd
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
COMPRESSIVE STRENGTM TESTS (ASTM C39)
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143)
58 5.00 7 05~24~94
59 5.00 7 05~24~94
60 5.00 28 06/14~94
61 5.00 28 06/14~94
62 5.00 56 07/12~94
63 5.25 7 05/24/94
64 5.25 7 05/24/94
65 5.25 28 06/14/94
66 5.25 28 06/14/94
67 5.25 56 07/12/94
TECHNICIAN:
DISTRIBUTION:
102,900 3640
106,900 3780
28-Day Average 3000
89,000 3150
90,000 3180
28-Day Average 3000
LS
(1) Valley Ranch Baptist church, Bob Arnold
(1) Urban Architecture, Betsy del Monte
(1) Brockette-Davis-Drake, Inc.
(2) Dal-Mac Construction, Scotty Eoff
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper
Engineering Laboratories,
Construction Materials Testing
Inc.
REPORT OF CONCRETE TESTS JOB NO.: 94.1021
CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994
PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: Pioneer
LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 15'-30' west of
east curb and 60%80, south of north curb
LOCATION OF POUR SET 2: Paving, south half of approach at northeast corner of project
SAMPLE DATA: SET 1 SET 2 MIX NO. 4700
Truck No. 338 335 Cement 470 Type I
Ticket No. 247052 247067 Flyash
Time Batched 12:42pm 2:16pm Sand 1292
Time Sampled 1:30pm 3:00pm in.
Concrete Temp. {ASTM C1064) 86°F 86°F 1.0 in. 1875
Air Content {ASTM C231) 4.5% 4.6% Water 262
Unit Weight (ASTM C138) Admix #1 MBL-80 @ 18.8 oz/yd
Admix //2
AEA MBVR @ 2.3 oz/yd
COMPRESS~YE STRENGTH TESTS {ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
68 5.00 7 05/24/94 89,900 3180
69 5.00 7 05/24/94 90,600 3200
70 5.00 28 06/14/94
71 5.00 28 06/14/94
72 5.00 56 07/12/94
28-Day Average
73 4.75 7 05/24/94 91,300 3230
74 4.75 7 05/24/94 93,000 3290
75 4.75 28 06/14/94
76 4.75 28 06/14/94
77 4.75 56 07/12/94
TECHNICIAN:
DISTRIBUTION:
28-Day Average
LS
(1) Valley Ranch Baptist church, Bob Arnold
(1) Urban Architecture, Betsy del Monte
(1) Brockette-Davis-Drake, Inc.
(2) DaI-Mac Construction, Scotty Eoff
(1) City of Coppell, Garreth Campbell
3000
3000
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148