Loading...
Valley R Baptist-LR 940517Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS CLIENT: Valley Ranch Baptist Church PROJECT: Valley Ranch Baptist Church Phase I, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 94.1021 DATE: 17 May 1 994 SUPPLIER: Pioneer Paving, west parking lot and fire lane, from 0'-15' west of east curb and 0'-20' north of south curb Paving, west parking lot and fire lane, from 15'-30' west of east curb and 40'-60' north of south curb SAMPLE DATA: SET 1 SET 2 Truck No. 296 488 Ticket No. 247007 247027 Time Batched 8:1 lam 10:32am Time Sampled 9:10am 11:00am Concrete Temp. (ASTM C10641 84°F 84°F Air Content (ASTM C2311 4.8% 4.8% Unit Weight (ASTM C1381 MIX NO. 4700 Cement 470 Type I Flyash Sand 1292 in. 1,0 in. 1875 Water 262 Admix #1 MBL-80 ~ 18.8 oz/yd Admix #2 AEA MBVR @ 2.3 oztyd (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength COMPRESSIVE STRENGTM TESTS (ASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) 58 5.00 7 05~24~94 59 5.00 7 05~24~94 60 5.00 28 06/14~94 61 5.00 28 06/14~94 62 5.00 56 07/12~94 63 5.25 7 05/24/94 64 5.25 7 05/24/94 65 5.25 28 06/14/94 66 5.25 28 06/14/94 67 5.25 56 07/12/94 TECHNICIAN: DISTRIBUTION: 102,900 3640 106,900 3780 28-Day Average 3000 89,000 3150 90,000 3180 28-Day Average 3000 LS (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: Pioneer LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 15'-30' west of east curb and 60%80, south of north curb LOCATION OF POUR SET 2: Paving, south half of approach at northeast corner of project SAMPLE DATA: SET 1 SET 2 MIX NO. 4700 Truck No. 338 335 Cement 470 Type I Ticket No. 247052 247067 Flyash Time Batched 12:42pm 2:16pm Sand 1292 Time Sampled 1:30pm 3:00pm in. Concrete Temp. {ASTM C1064) 86°F 86°F 1.0 in. 1875 Air Content {ASTM C231) 4.5% 4.6% Water 262 Unit Weight (ASTM C138) Admix #1 MBL-80 @ 18.8 oz/yd Admix //2 AEA MBVR @ 2.3 oz/yd COMPRESS~YE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 68 5.00 7 05/24/94 89,900 3180 69 5.00 7 05/24/94 90,600 3200 70 5.00 28 06/14/94 71 5.00 28 06/14/94 72 5.00 56 07/12/94 28-Day Average 73 4.75 7 05/24/94 91,300 3230 74 4.75 7 05/24/94 93,000 3290 75 4.75 28 06/14/94 76 4.75 28 06/14/94 77 4.75 56 07/12/94 TECHNICIAN: DISTRIBUTION: 28-Day Average LS (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 3000 3000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148