Loading...
Valley R Baptist-LR 940517 (2) Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TES~ JOB NO.: 94.1021 CLIEI~-- Valley Ranch~ DATE: 17 May 1994 PROJ~t Church Phase I, Coppell SUPPLIER: Pioneer LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 0'-1 5' west of east curb and 0'-20' north of south curb LOCATION OF POUR SET 2: Paving, west parking lot and fire lane, from 15'-30' west of east curb and 40'-60' north of south curb SAMPLE DATA: ' SET 1 SET 2 MIX NO. 4700 Truck No. 296 488 Cement 470 Type I Ticket No. 247007 247027 FIyash Time Batched 8:1 lam 10:32am Sand 1292 Time Sampled 9:10am 11:00am in. Concrete Temp. IASTM C1064) 84°F 84°F 1.0 in. 1875 Air Content (ASTM C231) 4.8% 4.8% Water 262 Unit Weight (ASTM C1381 Admix #1 MBL-80 @ 18.8 oz/yd Admix #2 AEA MBVR @ 2.3 oz/yd COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143} psi Strength 58 5.00 7 05/24/94 102,900 3640 59 5.00 7 05/24/94 106,900 3780 60 5.00 28 06/14/94 131,900 4660 61 5.00 28 06/14/94 130,100 4600 62 5.00 56 07/12/94 139,200 4920 28-Day Average 4630 3000 63 5.25 7 05/24/94 89,000 3150 64 5.25 7 05/24/94 90,000 3180 65 5.25 28 06/14/94 110,300 3900 66 5.25 28 06/14/94 110,200 3900 67 5.25 56 07/12/94 120,000 4240 28-Day Average 3900 3000 TECHNICIAN: LS DISTRIBUTION: (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. ~ ~ (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: Pioneer LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 15'-30' west of east curb and 60'-80' south of north curb LOCATION OF POUR SET 2: Paving, south half of approach at northeast corner of project SAMPLE DATA: · SET I SET 2 MIX NO. 4700 Truck No. 338 335 Cement 470 Type I Ticket No. 247052 247067 Flyash Time Batched 12:42pm 2:16pm Sand 1292 Time Sampled 1:30pm 3:00pm in. Concrete Temp. (ASTM C1064) 86°F 86°F 1.0 in. 1875 Air Content (ASTM C231) 4.5% 4.6% Water 262 Unit Weight IASTM C138i Admix #1 MBL-80 @ 18.8 oz/yd Admix #2 AEA MBVR @ 2.3 oz/yd COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 68 5.00 7 05/24/94 89,900 31 80 69 5.00 7 05/24/94 90,600 3200 70 5.00 28 06/14/94 ].:[4,600 4050 71 5.00 28 06/14/94 l].]. ,800 3950 72 5.00 56 07/12/94 :t23,300 4360 28-Day Average 4000 3000 73 4.75 7 05/24/94 91,300 3230 74 4.75 7 05/24/94 93,000 3290 75 4.75 28 06/14/94 ].06,000 3750 76 4.75 28 06/14/94 :[08,400 3830 77 4.75 56 07/12/94 115,800 4,[00 28-Day Average 3790 3000 TECHNICIAN: LS DISTRIBUTION: (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: Pioneer LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 0'-15' west of east curb and 0'-20' north of south curb LOCATION OF POUR SET 2: Paving, west parking lot and fire lane, from 15'-30' west of east curb and 40'-60' north of south curb SAMPLE DATA: SET 1 SET 2 MIX NO. 4700 Truck No. 296 488 Cement 470 Type I Ticket No. 247007 247027 Flyash Time Batched 8:11am 10:32am Sand 1292 Time Sampled 9:10am 11:00am in. Concrete Temp. IASTM C1064) 84°F 84°F 1.0 in. 1875 Air Content (ASTM C231) 4.8% 4.8% Water 262 Unit Weight (ASTM C138) Admix #1 MBL-80 ~ 18.8 oz/yd Admix #2 AEA MBVR @ 2.3 ozfyd COMPRESSIVE STRENGTH TESTS (ASTM C39i (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 58 5.00 7 05/24/94 102,900 3640 59 5.00 7 05/24194 106,900 3780 60 5.00 28 06/14/94 13:[, 900 4660 61 5.00 28 06/14/94 :[30,100 4600 62 5.00 56 07/12/94 28-Day Average 4630 3000 63 5,25 7 05/24194 89,000 3150 64 5.25 7 05/24/94 90,000 3180 65 5.25 28 06/14/94 :[:[0,300 3900 66 5.25 28 06/14/94 :[[0,200 3900 67 5.25 56 07/12/94 28-Day Average 3900 3000 TECHNICIAN: LS DISTRIBUTION: (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-DaVis-Drake, Inc. ~ ~ (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: Pioneer LOCATION OF POUR SET 1: Paving, west parking lot and fire lane, from 15'-30' west of east curb and 60'-80' south of north curb LOCATION OF POUR SET 2: Paving, south half of approach at northeast corner of project SAMPLE DATA: SET 1 SET 2 MIX NO. 4700 Truck No. 338 335 Cement 470 Type I Ticket No. 247052 247067 Flyash TimeBatched 12:42pm 2:16pm Sand 1292 Time Sampled 1:30pm 3:00pm in. Concrete Temp. (ASTM C1064) 86°F 86°F 1.0 in. 1875 Air Content {ASTM C231) 4.5% 4.6% Water 262 Unit Weight (ASTM C138) Admix #1 MBL-80 @ 18.8 oz/yd Admix #2 AEA MBVR @ 2.3 oz/yd COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 68 5.00 7 05/24/94 89,900 3180 69 5.00 7 05/24/94 90,600 3200 70 5.00 28 06/14/94 ]. ].4,600 4050 71 5.00 28 06/14/94 11].,800 3950 72 5.00 56 07112/94 28-Day Average 4000 3000 73 4.75 7 05/24/94 91,300 3230 74 4.75 7 05/24/94 93,000 3290 75 4.75 28 06/14/94 106,000 3750 76 4.75 28 06/14/94 108,400 3830 77 4.75 56 07/12/94 28-Day Average 3790 3000 TECHNICIAN: LS DISTRIBUTION: (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc, (2) DaI-Mac Construction, Scotty E0ff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppetl JOB NO. 94.1021 TIME: 1.0 hour AREA INSPECTED: Paving, west parking lot and fire lane; approach at northeast corner of project DATE OF INSPECTION: 5/17/94 (7:30am-8:30am) DEFICIENCIES NOTED: CORRECTIONS NUMBER LOCATION/ITEM DESCRIPTION OBSERVED None NOTE: All items reviewed were present and placed according to project plans and specifications, at time of final inspection. TECHNICIAN: LS DISTRIBUTION: (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Geotechnical Engineering · Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE ~OB NO. 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 17 May 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX WEAl~ER: Cloudy CONCRETE SUPPLIER: Pioneer AIR TEMP: 70°F LOCATION OF CONCRETE PLACED: Paving, west parking lot and fire lane, approach at northeast corner of project. Materials Oesign Mix Cement: Mix 4700 , 3000 psi Brand VP Type I Source Bin-Plant #22 Max. Water-Cement Ratio by weight Aggregate Type Source 8arch Weights - S. S. Dry Basis: Size F.A. 0 - #4 Sand Pioneer Cement 470 F.A. 1292 I.A. Z.A. C.A. 1875 C.A. 1" - #4 Cr. Stone Pioneer A~mix MBL-80 @ 18.8 oz/yd MBVR ~ Z.J oz/y~ Actual Batch Computations: Time Starte~: 8:30am % Free Actual Moisture Water 8arch Wts. Time Finishe~: 4:00pm Cement 470 Concrete Placed, c.y.: 320 F.A. 5.0 65 1357 Concrete Temp: 84-86°F I.A. '- Cylinders Made: 58 - 77 C.A. 1875 Remarks: Total Free Water 65 lbs. Added at Mixer 197 lbs. ~ ~, ~ Total Water 262 lbs. Certified Correct LS inspector 2870 Walnut Hill Lane Oallas, Texas 75229 (214) :~51-6419