Loading...
Valley R Baptist-LR 940408Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF SOIL GRADATIONS CLIENT: Valley Ranch Baptist Church DATE: 8 April 1994 PROJECT: Valley Ranch Baptist Church Phase I JOB NO.: 94.1021 SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 4/8/94. 13) LOCATION South Parking Area 60' north of south curbline 20' west of east curbline PERCENT PASSING NO. 4 SIEVE % 76.2* SPECIFICATION REQUIREMENTS % 60+ *Sampled by Contractor. TECHNICIAN: DISTRIBUTION: CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Valley Ranch Baptist Church DATE: 8 April 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppetl, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Dark Brown Clay with Lime 2) Lime Stabilized Subgrade - Brown Clay with Gravel & Lime ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf ~ 22.0% Moisture 2) 100.0 pcf ~ 21.0% Moisture 35) 36) 37) LOCATION PROCTOR LIFT South Parkin,q Area 60' north of south curbline 20' west of east curbline 50' north of south curbline 60' west of east curbline 50' south of north curbline 75' west of east curbline 1 Fin. Sub. 2 Fin. Sub. 2 Fin. Sub. MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 24.1 91.2 96.0 23.0 97.3 97.3 23.1 95.9 95.9 REQUIRED COMPACTION % 95+ Min. +2% Over Optimum TECHNICIAN: DISTRIBUTION: CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Del-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148