Loading...
Valley R Baptist-LR 940406Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF SOIL GRADATIONS CLIENT: Valley Ranch Baptist Church DATE: 6 April 1994 PROJECT: Valley Ranch Baptist Church Phase I JOB NO.: 94.1021 SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 4/6/94. 3) 4) 5) 6) 7) 8) 9) 10) LOCATION PERCENT PASSING NO. 4 SIEVE % South Parking Area 125' north of south curbline 25' east of west curbline RETAKE 30' north of south curbline 25' east of west curbline RETAKE 60' north of south curbline 20' west of east curbline 125' north of south curbline 25' east of west curbline RETAKE 30' north of south curbline 25' east of west curbline RETAKE 40' north of south curbline 75' east of west curbline 100' north of south curbline 75' east of west curbline 60' north of south curbline 20' west of east curbline RETAKE with project specifications. 56.5' *Does not comply TECHNICIAN: DISTRIBUTION: 56.4* 41.8' 60.6 65.0 60.0 50.0' 48.6* Contractor notified. CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell SPECIFICATION REQUIREMENTS % 60+ 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148