Loading...
Valley R Baptist-LR 940405Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF SOIL GRADATIONS CLIENT: Valley Ranch Baptist Church DATE: 5 April 1994 PROJECT: Valley Ranch Baptist Church Phase I JOB NO.: 94.1021 SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 4/5/94. LOCATION PERCENT PASSING NO. 4 SIEVE % South Parking Area 1) 125' north of south curbline 40.5* 25' east of west curbline 2) 30' north of south curbline 56.7* 35' east of west curbline SPECIFICATION REQUIREMENTS % 60+ *Does not comply with project specifications. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148