Valley R Baptist-LR 940331Hooper
Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TEST-C;
CLIENT: Valley Ranch Baptist Church
DATE: 31 March 1994
PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX
JOB NO.: 94.1021
MATERIAL DESCRIPTION: 1 ) On-Site Fill - Tan & Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 101.0 pcf ~ 20.0% Moisture
LOCATION PROCTOR LIFT
TU Electri~ Lin~ Ditch Backfill
29) 30' north and 6' west of 1 Final
northwest light pole
30) 40' south and 6' west of I Final
northwest light pole
31) 90' south and 6' west of 1 Final
northwest light pole
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
19.6
103.6' 102.6 95+
Over Optimum
20.6 104.0' 103.0
19.9 104.2' 103.2
*Presence of rock at this location creates a heavier, drier material.
TECHNICIAN:
DISTRIBUTION:
MFM
{1) Valley Ranch Baptist Church, Bob Arnold
(1) Urban Architecture, Betsy del Monte
{1 ) Brockette-Davis-Drake, Inc.
(2) Dal-Mac Construction, Scotty Eoff
(1).City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148