Loading...
Valley R Baptist-LR 940330Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 30 March 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: LOCATION OF POUR SET 1: Sanitary sewer manhole at northeast side of jobsite LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO.' Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064i 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 25 7 04/06/94 127,200 4500 26 28 04/27/94 140,600 ** 27 28 04/27/94 182,800 6470 28-Day Average 6470 4200 *Irregular fracture. Not included in 28-day average. NOTE: Cylinders and all information furnished by Contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 94.1021 CLIENT: Valley Ranch Baptist Church DATE: 30 March 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell SUPPLIER: LOCATION OF POUR SET 1: Sanitary sewer manhole at northeast side of jobsite LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064) 1.0 in. Air Content {ASTM C2311 Water Unit Weight (ASTM C138} Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTr~ C39~ Cylinder Slump Age Test Number Inches Days Date (ASTM C143~ {Standard 6 inch x 1 2 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 25 7 04/06/94 26 28 04/27/94 27 28 04/27/94 127,200 4500 28-Day Average 4200 NOTE: Cylinders and all information furnished by Contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Valley Ranch Baptist church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Valley Ranch Baptist Church DATE: 30 March 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1 ) On-Site Fill ~ Tan & Grey Clay 2) On-Site Fill - Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 101.0 pcf @ 20.0% Moisture 2) 99.0 pcf @ 22.0% Moisture 26) 27) 28) LOCATION PROCTOR Backfill Over StQrm Sewer Line 75' east of Station 3+21 (Line A-l) RETAKE LIFT BELOW SUBGRADE Fin. Sub. B~ckfill Over 6" Sanitary Sewer Line approx. 50' south of manhole MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % approx. 125' south of manhole 22.3 100.7 99.7 2 3' 24.1 98.3 99.3 2 3' 25.0 94,8 95.8 REQUIRED COMPACTION % 95+ +1% to +3% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148