Valley R Baptist-LR 940329Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Valley Ranch Baptist Church
DATE: 29 March 1994
PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX
JOB NO.: 94.1021
MATERIAL DESCRIPTION: 1) On-Site Fill - Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 99.0 pcf @ 22.0% Moisture
LOCATION PROCTOR LIFT
BELOW
SUBGRADE
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Backfill Over Sanitary Sewer Line
N~)rth,of N(~rth Parking Area
23) approx. 25' eaSt of'manhole ."' 1 ,2' 23.5
24) approx. 25' east, of manhole 1 4' 24.2
25) ' approx. 25' east of manhole 1 6' 23.3
98.7 . 99.7 95+
97.2 98.2 +1% to +3%
95.8 96.8 Of Optimum
TECHNICIAN: CDJ
DISTRIBUTION: '., {1) Valley Ranch .Baptist Church, Bob Arnold
· ' (1) Urb;~n ArChitecture, Betsy del Monte ~.' i. {i) B~oCke~te;D~Vis. Drake, Inc.
(2)'Dal:Mac COnstruction, Scotty Eoff
(1) City of COppell' Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148