Loading...
Valley R Baptist-LR 940321Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF IN-PLACE DENSITY TESTS CLIENT: Valley Ranch Baptist Church DATE: 21 March 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Tan & Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 101.0 pcf ~ 21.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % Backfill Over Storm Sewer Line 16) Line A-l, 75' east of Sra. 3+21 1 Final 18.9' 99.4 98.4 17) Line A-l, 20' east of Sra. 3+21 1 Final 22.1 100.9 99.9 18) Line A-l, 20' south of Sra. 2+55 1 Final 21.3 103.6'* 102.6 19) 8" service to building, 1 Final 22.0 98.6 97.6 75' south of Sta. 2+55 REQUIRED COMPACTION % 95+ +1% to +3% Of Optimum *Test results indicate fill is not compacted to required density/moisture. Contractor notified. **Presence of rock at this location creates a heavier, drier material. TECHNICIAN: DmSTRIBUTION: MFM (1) Valley Ranch Baptist ChurCh, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc~ (2) Dal-Mac Construction, Scotty Eoff (1).City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148