Valley R Baptist-LR 940315Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTR
CLIENT: Valley Ranch Baptist Church
DATE: 15 March 1994
PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX
JOB NO.: 94.1021
MATERIAL DESCRIPTION: 1) On-Site Fill - Tan & Grey Clay
2) On-Site Fill - Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 101.0pcf~21.0% Moisture
2) 99.0 pcf ~ 22.0% Moisture
13)
14)
15)
LOCATION PROCTOR LIFT
BELOW
Backfill 0v~r 8" Water Line GRADE
Station O +80 · '. _ 1 0.5'
Station 2 +00 2 1.3'
Station 3 + 60 1 0.8'
MOISTURE DRY PERCENT
CONTENT DENSITY COMPACTION
% PCF %
24.2 96.7 95,7
25.9 94.5 95.5
23.3 101.9 100.9
REQUIRED
COMPACTION
%
95+
+1% to +3%
Of Optimum
TECHNICIAN: RDG
DISTRIBUTION: i. '(1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte
(1) Brockette-Davis-Drake, Inc.
(2) DaI-Mac Construction, Scotty Eoff
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148