Loading...
Valley R Baptist-LR 940315Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTR CLIENT: Valley Ranch Baptist Church DATE: 15 March 1994 PROJECT: Valley Ranch Baptist Church Phase I, Coppell, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1) On-Site Fill - Tan & Grey Clay 2) On-Site Fill - Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 101.0pcf~21.0% Moisture 2) 99.0 pcf ~ 22.0% Moisture 13) 14) 15) LOCATION PROCTOR LIFT BELOW Backfill 0v~r 8" Water Line GRADE Station O +80 · '. _ 1 0.5' Station 2 +00 2 1.3' Station 3 + 60 1 0.8' MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 24.2 96.7 95,7 25.9 94.5 95.5 23.3 101.9 100.9 REQUIRED COMPACTION % 95+ +1% to +3% Of Optimum TECHNICIAN: RDG DISTRIBUTION: i. '(1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) DaI-Mac Construction, Scotty Eoff (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148