Loading...
Valley R Baptist-LR 940225Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Valley Ranch Baptist Church DATE: 25 February 1994 PROJECT: Valley Ranch Baptist Church, Coppell, TX JOB NO.: 94.1021 MATERIAL DESCRIPTION: 1) On'Site Fill - Tan & Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 101.0 pcf @ 21.0% Moisture 1) 2) 3) LOCATION PROCTOR LIFT North Parkin¢l Area 40' south of north curbline 20' west of east curbline 20' south of north curbline 20' east of west curbline 75' south of north curbline 30' east of west curbline I Exist. Sub. I Exist. Sub. I Exist. Sub. MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 22.7 100.2 99.2 22.8 98.2 97.2 22.9 97.3 96.3 REQUIRED COMPACTION % 95+ +1% to +3% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (1) Valley Ranch Baptist Church, Bob Arnold (1) Urban Architecture, Betsy del Monte (1) Brockette-Davis-Drake, Inc. (2) Dal-Mac Construction, Scotty Eoff 2870 Walnut Hill Lane Dallaa, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper 2e70 Welnut Hill £ Client: Project: 8oil Engineering Laboratories, Inc. Lene Dellel , Texe. 75229 (214) 351-6419 Valley Ranch Valley Ranch Coppell~ TX Demo ription: Baptist Church Date: 25 February 1994 Baptist Church Phase I Job No: 94.1021 Borrow Fi 11 Brown Chalky Clay with Limestone Chips 97.0 pcf Liquid Limit : 38.4 20.0% Plemticity Index : 19.8 Mmximum Denmity : Optimum Moimture: Dimtribution: 0 12o 0 11o :3 100 0 ! mm ~) 90 13 80 (1} Valley Ranch Baptist Church, Bob Arnold {1} Urban Architecture, Betsy del Monte {1} Brockette-Davis-Drake, Inc. {2} Dal-Mac Construction, Scotty Eoff MOISTURE- DENSITY R'ELATi ONSHIP AST. M..Deg8 10 20 30' Moisture Content - percent