Loading...
Valley R Baptist-CS 940824COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: August 24, 1994 Engineering Staff Public Works Staff Revised Development Fees for Valley Ranch Baptist Church The Equivalent Service Units remain the same for fireline meters. The only change is the cost of the actual 6" fireline meter, which changed to $1,338.90. /dm COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: August 23, 1994 Engineering Staff Public Works Staff Revised Development Fees for Valley Ranch Baptist Church The following fees should be assessed on the above referenced project. Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's i - 1" Irrigation Meter/s = 2.5 ESU's 1 - 6" Fireline Meter/s = 2.5 ESU's Total 13 ESU's @ $650.00 ea = $8,450.00 100% due prior to Council approval of final plat. Wastewater Impact 1 - 2" Domestic meters = 8 ESU's Total 8 ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee 1 lot/s @ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 2" Domestic Meter @ $296.84 ea Total = 100% due prior to issuance of building permit. = $296.84 $ 296.84 Water Meter Fee (Irrigation & Fire) 1 - 6" Irrigation Meter/s @ $62.10 ea = $62.10 Fireline Meter/s @ $1,338.90 ea = $1,338.90 Total $1,401.00 100% due prior to issuance of water meters. Water Meter Deposit 3 meters @ $35.00 ea = $105.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works FEES/VALYd HUR