Loading...
Valley R Baptist 2-CS 970823The City With A Beautiful Future Jeff Julian Valley Ranch Baptist Church 1501 E. Beltline Rd. CoppeR, TX 75019 P.O. Box 478 Coppell, Texas 75019 214-462-0022 August 23, 1997 Valley Ranch Baptist Church, Phase 2 Roadway Impact Fee Dear Mr Julian: Enclosed is a copy of the City of Coppell Roadway Impact Fee calculation sheet for the referenced development. Please make payment to the City of Coppell in the amount of $451.15 and forward to the Finance Department along with a copy of the Impact Fee Assessment calculation sheet. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be calculated. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, 1~) Director of Public Works/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services ROADWAY IMPACT FEE CALCULA 'IONS PROJECT: DATE: Valley Ranch Baptist Church, Phase 2 8/23/97 ROADWAY IMPACT FEE: Service Area * 8 Catel~or~ ** Institutional Land Use ** Buildin$ Size (Sq. Ft.) Development Units ** ~ Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Church/Slma~o~ue 11,885 11.885 0.52 $73 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = . $451.15 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)