Valley R Baptist-CS 940330DEVELOPMENT FEES
JECT NAME. Valley Ranch Baptist Church
NEER: Brockett, Davis and Drake, Inc.
SION DATE: 'I 02A In
SENT
ASSESSMENT
ASSESSED FEE
AMOUNT PAID
DATE
Park Fee
2/11/94
Water Impact Fee
$8,450.00
$8,450.00
2/21/94
2/11/94
Wastewater Impact Fee
$3,600.00
$3,600.00
2/21/94
Street Sign
Street Light
2/11/94
Construction Inspection
$628.70
$628.70
2/21/94
Irrigation
Street Cut Permit
Overtime Inspection
2/11/94
2/11 /94
Water Tap Inspection
Utility Final Inspection
$300.00
$300.00.
2/21/
2/11/94
2/11/94
Water Meter Fee(Lots)
55000
$296.84
$50.00
$296.84
1/21/94
2)1/94
2/11/94
Water Meter (1 rrig. &Fire)
Water Meter Deposit
$1, 594.27
$1, 594.27
2!71 /94
2/28/94
2" Water Relocation
$105.00
S 1,111.48
8105.00
2/21/94
TOTALS
Total F
$16,136.29
Fees Paid ,
$15,024.81
Amounts Owed
$1,111.48
Prior To Construction
w /Plans Erosion Control Approved
N/A E.P.A.- N.O.I. Recd.
3/7194 Const. Plan Approved
12/22/93 Irrigation Plan Recd.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
2/21/94 Irrigation Plan Approved