Loading...
Valley R Baptist-CS 940330DEVELOPMENT FEES JECT NAME. Valley Ranch Baptist Church NEER: Brockett, Davis and Drake, Inc. SION DATE: 'I 02A In SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 2/11/94 Water Impact Fee $8,450.00 $8,450.00 2/21/94 2/11/94 Wastewater Impact Fee $3,600.00 $3,600.00 2/21/94 Street Sign Street Light 2/11/94 Construction Inspection $628.70 $628.70 2/21/94 Irrigation Street Cut Permit Overtime Inspection 2/11/94 2/11 /94 Water Tap Inspection Utility Final Inspection $300.00 $300.00. 2/21/ 2/11/94 2/11/94 Water Meter Fee(Lots) 55000 $296.84 $50.00 $296.84 1/21/94 2)1/94 2/11/94 Water Meter (1 rrig. &Fire) Water Meter Deposit $1, 594.27 $1, 594.27 2!71 /94 2/28/94 2" Water Relocation $105.00 S 1,111.48 8105.00 2/21/94 TOTALS Total F $16,136.29 Fees Paid , $15,024.81 Amounts Owed $1,111.48 Prior To Construction w /Plans Erosion Control Approved N/A E.P.A.- N.O.I. Recd. 3/7194 Const. Plan Approved 12/22/93 Irrigation Plan Recd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. 2/21/94 Irrigation Plan Approved