Loading...
Valley R Baptist-CS 920110MEMO TO: FROM: SUBJECT: RE: DATE: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer~~~ Belt Line Road from MacArthur Blvd. to the Eastern City Limit Valley Ranch Baptist Church, letter dated 12/20/91 January 10, 1992 The above referenced section of Belt Line Road (E-W) was a Dallas County project, and mainly funded by the County. It is my understanding that the City of Coppell had funded the roadway design, prepared by Ginn & Case, Inc. As a result of my research and conversation with Frank Trando, I provide the following comments regarding paving assessment: The only two (2) roads that paving assesSment was implemented on are Belt Line Road (N-S) and Denton Tap Road. Paving assessment process must be implemented prior to the actual roadway improvement. Belt Line Road east of MacArthur Blvd. is an improved roadway. To my knowledge, in order to assess any roadway improvement costs the assessment must be done prior to the start of construction. Although there is no paving assessment for the referenced section of Belt Line Road, this does not preclude the possibility of assessment for any additional travel lanes in the future. Please note that the above information is based on my findings, as I was not involved with any of the above mentioned CIP's and/or paving assessments. If you have any questions, please advise. MSD/bd cc: Frank Trando, Finance Director VALLEY