Switching Sta-AG 930209 ITEM CAPTION: PUBLIC HEARING: To consider approval of a zoning change request, Case ~S-1041(A), for an amendment to an SUP site plan for an electrical substation, located at the northwest corner of Thweatt Road and Coppell Road, at the request of Brazos Electric Cooperative, SUBMI'I'FED BY: ~ EVALUATION OF ITEM: Date of P C~ Z Meeting: January 21, 1993 · Decision of P C~ Z C2ommi~ion: Approved (6-0) with the following conditionS: STAFF RE~' Planning Direc OTHER REP.: DATE: 1) that TU Electric and Brazos Electric Cooperative would enter ~nto an agreement with the City of Coppell that relieves both electric companies of paving Thweatt Road and Coppell Road, contingent upon the dedication of right-of-way for both roads to the City of Coppell, and also donation of right-of-way for the old power and light easement, which parallels Sandy Lake Road; 2) ~U Electric and]or Brazos Electric Cooperative will pay for relocation of the line. at the time the City indicates the upgrade and improvement of Sandy ~ake 3) more complete landse~p~ug along ~hweatt Road andCoppell Road.when the 4) including the four variances requested ·'/ Please see attached staff report for further details. BUDGET AMT. AMT +/- BUDGET N/A AMT. ESTIMATED FINANCIAL REVIEW BY ~OMMENTS: AGF-¼DA REQUEST FORM REV]SF.D b'91 /.fy..4 ,,4'-~ ,c~"'"ORT DOCLT~ENTATION FOR AGENDA ITEM ..'-TA.MP RECEIV[D BY CITY MA,'~AGER'o OFFICE: £UPPORT DOCLT~NTAT[ON SUBHITTED k'lT~ AGENDA ITEH: .'~EMOS/LETTERS/REPORTS/BILLS/~INUTES; NO. OF ORIGI~LS each C.i,P. CONTRACT ..................... : CHANGE ORDERS ....................... : ORDINANCE ........................... : CAPTYON ............................. ; RESOLUTION .......................... : PROCLAMATION ....................... : 3 oriEinale for sisnaCure 6 originals for si~uature 3 ori$inale for signat~re I blueback for signature + 3 copies I blueback for signature + 3 copies 2 bluebsck~ for e{4nature + I copy 2 blueback~ for ei~ture + I copy 1 each LOCATION MAFS ....................... : ZONING PLA~S ........................ : PRELIMINARY/FINAL PLATS ............. : SITE PLANS ........................... LANDSCAPE PLAI~S ..................... : ARCHITEC27IRAL RENDERINCS ............ : 12 12 12 12 12 12 DATE PUBLISHED IN THE CITIZENS'ADVOCATE: NOTIFZCATION TO: DATE/HETI{OD OF CO~TACT: Greg Jones, Chief Building Official, made a presentation. Mr. Jones indicated that the staff recommended denial of this request. Tim tlouse, representing the applicant, also made a presentation to the council. Following discussion, Councilman' Robertson moved to approve a variance from Section 10-8-3 D of the Sign Ordinance concerning subdivision signs with the condition that the sign come down when the two combined subdivlslons have been 75% sold or a period of one year, whichever comes first. Councilman Morton seconded the motion; the motion carried 6-1 with Mayor Pro Tern Smothermon and Councilmen Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion, and Councilman Weaver voting against the motion. 14. Consideration of a varlance from Section 10-8-3 D of the Sign Ordinance concerning subdivision signs. This variance is being requested by Mr. Steve Parsons for the property located on the west side of MacArthur Blvd., south of the Woodridge subdivision. Greg Jones, Chief Building Official, made a presentation stating that there is already one sign on Mockingbird and recommended denial of this request. Steve Parsons, representing applicant, also made a presentation to the Council. Following discussion, Councilman Robertson moved to approve a variance from Section 10-8-3 D of the Sign Ordinance concerning subdivision signs with the condition that the sign come down when 75% of the homes are sold in Phase 10A or for a period of one year, whichever comes first. Councilman Morton seconded the motion; the motion was denied 3-4 with Mayor Pro Tem Smothermon and Councilmen Morton and Robertson voting in favor of the motion, and Councilmen Weaver, Thomas, Mayo and Garrison voting against the motion. 15. PUBLIC HEARING: To consider approval of a zoning change request, Case #S-1064, (Salerno Pizza Company), from (C) commercial to {C-SUP) Commercial Special Use Permit, for approval of an SUP for a restaurant expansion, located at 1086 Sandy Lake Road, at the request of Ms. Gloria Salerno. Gary Sieb, Director of Planning and Community Services, made the presentation to Council and stated that the Planning & Zoning Commission recommended approval of the zonlng change. Ms. Gloria Salerno also made a presentation. Mayor Wolfe opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. Again, there were none. Mayor Wolfe then closed the Public Hearing. Councilman Robertson moved to approve the zoning change request, Case #S-1064, (Salerno Pizza Company), from (C) commercial to (C-SUP) Commercial Special Use Permit, for approval of an SUP for a restaurant expansion, located at 1086 Sandy Lake Road. Councilman Morton seconded the motion; the motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. 16. PUBLIC HEARING: To consider approval of a zoning change request, Case #S-1041(A), for an amendment to an SUP site plan for an electrical substation, located at the northwest corner of Thweatt Road, at the request of Brazos Electric Cooperative, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation. The Plamfing & Zoning Commissioq recommended approval of the zoning change subject to certalq conditions and that it be brought back to council before final adoption. Al Petter, representing Brazos Electric, also made a presentation to the Council. Mr. Pelter stated that Brazos Electric was now ready to complete its connection with TU Eleclric and will provide an addltiooal source of power into that substation. Brazos will also construct a line out of the substation to the Flower Mound area to a substation that will serve Denton Counly Electric Co-op and TU Utillties. Mayor Wolfe opeued the Public llearing and CM020993 asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. Again, there were none. Mayor Wolfe then closed the Public Hearing. Philip Segrest, Attorney for Brazos Electric, made comments to the Council concerning land that was dedicated to the City of Coppell by Brazos Electric. Mr. Segrest also spoke regarding a line down Sandy Lake Road that was traded to TU Electric for another line. Mayor Pro Tem Smothermon moved to approve the zoning change request with the four conditions and variances attached with the provision that it will not come back to Council in ordinance form and will not be effective until such time as Staff and Brazos has worked out the pertinent language for the ordinance. Councilman Morton seconded the motion; the motion was denied 3-4 with Mayor Pro Tem Smothermon and Councilmen Morton and Robertson voting in favor of the motion, and Councilmen Weaver, Thomas, Mayo and Garrison voting against the motion. Mayor Pro Tern Smothermon moved to deny the zoning change request Case #S- 1041(A). Councilman Morton seconded the motion; the motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. 17. PUBLIC HEARING: To consider approval of a replat of Pecan Hollow Addition, Block II, Lots 27 & 28 (197 and 201 lloliowtree), located approximately 450' south of Parkway Boulevard, along the west side of Lodge Road, at the request of American Surveying Company. Gary Sieb, Director of Planning and Community Services, made a presentation. Mayor Wolfe opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. tie then asked for those persons wishing to speak in favor of this proposal. Again, there were none. Mayor Wolfe then closed the Public Hearing. Mayor Pro Tem Smothermon moved to approve the replat of Pecan Hollow Addition, Block H, Lots 27 & 28 (197 and 201 Hollowtree). Councilman Morton seconded the motion; the motion carried 7-0 with Mayor Pro Tem Smothermon and Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. 18. PUBLIC HEARING: To consider approval of a site plan amendment, Case #S-1037(A), Riverchase Clubhouse Addition, to allow the expansion of the Clubhouse, located along the east side of Riverchase Drive, within the Riverchase Golfcourse, at the request of Golf Enterprises. Gary Sieb, Director of Planning and Community Services, made the presentation to the Council and stated that the Planning & Zoning Commission recommended to approve the amendment. Jim Helms, representing applicant, also made a presentation to the Council. Mayor Wolfe opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. Jerry Ragsdale, representing the owner of Riverchase, spoke in support of the change. Mayor Wolfe then closed the Public Hearing. Following discusson, Councilman Mayo moved to approve a site plan amendment, Case #S-1037(A), Riverchase Clubhouse Addition, to allow the expansion of the Clubhouse. Councilman Mayo seconded the motion; the motion carried 6-0 with Councilmen Weaver, Thomas, Morton, Mayo, Robertson and Garrison voting in favor of the motion. Mayor Pro Tem Smothermon abstained from the vote due to a conflict of interest. 19. PUBLIC HEARING: To consider approval of a replat of Riverchase Clubhouse Addition, to allow the expansion of the Clubhouse, located along the east side of Riverchase Drive, within the Riverchase Golfcourse, at the request of Golf Enterprises. CM020993 Page 5 of 8 TU/BRAZOS ELECTRICAL SUBSTATION SUMMARY CHRONOLOGY March 9, 1993 Mar. 16, 1989 CPC approves zoning--SUP " prelim plat--dedication of r.o.w, or esmts. Apr. 11, 1989 CC approves zoning--SUP 1. s. comparable to Hackberry sta. " plat--rock yard surface rock driveway open ditch drainage easements worked out with staff Apr. 20, 1989 CPC approves final plat--separate dedication instr, for road esmts filed prior to CC apvl. 4 prelim, plat cond. escrow agreement ($140,204) Thweatt/Coppell final 1.s. within 30 days of road impvmts May 9, 1989 Jun. 5, 1989 CC Denies final plat City Manager's letter to Tom Parsons rec. apvl of plat subject to: TU relieved of paving cost if: TH dedicate r.o.w, for Coppell and Sandy Lake Roads donate r.o.w, for old Brazos Power esmt which parallels Sandy Lake Road TLI pays for relocation of this line when Sandy Lake is impvd TH provide executed esmts for Coppell/Sandy Lake Rd r.o.w. Jun. 13, 1989 CC approves final plat with above conditions (which inclds CPC conds?) Jan. 21, 1993 CPC approves zoning--SUP revision TU and Brazos relieved of paving costs if: dedication of r.o.w, for Coppell and Thweatt Roads donate r.o.w, for old Brazos Power esmt which parallels Sandy Lake Road they pay for relocation of this line when Sandy Lake is improved more complete landscaping when Thweatt/Coppell Rds are improved 4 plat variances rock Yard surface rock driveway Feb. 9, 1993 Feb. 16, 1993 Feb. 26, 1993 Mar. 2, 1993 Mar. 9, 1993 tubraz CC open ditch drainage 1.s. minimal until rd. impvmts Denies final plat Letter from Brazos requesting re-hearing Letter from Brazos outlining agreeable conditions for apvl of SUP: pay paving assessment for Thweatt/Coppell NOW (est. at between $179-200/ft.-380 and 172 ft. respectively) more complete 1.s. when Thweatt/Coppell Rds are impvd. 4 plat variances rock yard surface rock driveway open ditch drainage minimum 1.s. until rd. impvmts IN LIEU OF: paving Thweatt/Coppell paying to relocate power lines impvd when Sandy Lake is Letter from TLI Electric outlining agreeable SUP conditions: TU will remove wood poles along Sandy Lake and Coppell Rds donate the r.o.w, esmts, for widening of Sandy Lake Rd. pay paving assessment for Coppell Rd NOW (est. at between $179-200/ft.) IF: City provide TU sufficient r.o.w, along Sandy Lake to construct a trans, line (in median!) assurance that the line extending west from the substation is not subject to .any of these agreements CC Deliberations CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE #: S-1041(A) - ELECTRICAL SUBSTATION P & Z HEARING DATE: January 21, 1993 C. C. HEARING DATE: February 9, 1993 LOCATION: The northwest comer of Thweatt Road and Coppell Road. SIZE OF AREA: 2.72 Acres of land. REQUEST: Approval of an amendment to a site plan, to allow the expansion of the electrical substation. APPLICANT: Brazos Electric Cooperative Representative: Mr. A1 Petter Right-of-Way Department 2404 Lasalle Avenue Waco, Texas 76702-2585 (817) 750-6500 HISTORY: An S.U.P. and a plat were approved for the switching station, at the request of T.U. Electric in 1989. TRANSPORTATION: The property is situated at the intersection of Thweatt, Coppell and Sandy Lake Roads. Thweatt and Sandy Lake Roads are classified as (C4D/6) divided thoroughfares with 100-110 feet of right-of-Way; Coppell Road is planned to be a (C2U), an undivided street contained within a 60 foot right-of-way. SURROUNDING LAND USE & ZONING: North - vacant; LI South - single-family; PD-SF East - vacant; R West vacant; R & C ANALYSIS: Brazos Electric Cooperative is seeking approval to allow expansion of the subject substation. The applicant wishes to complete the inter-connection between Brazos Electric and TU Electric at the Coppell Substation. The inter-connection will allow for an exchange of electrical power between the two utilities. If either of these utilities loses a transmission line or elects to take it out of service, this substation can remain operative with power from the other line. Presently, the Brazos Electric line along Thweatt Road and Coppell Road merely passes through the substation without inter-connecting. Brazos Electric proposes to construct three 48 foot six inch towers inside the substation. These towers will be 13 feet shorter than the existing tower in the substation. The existing screening fence and landscaping will be extended 90 feet along Thweatt Road and 90 feet along Coppell Road. Approximately 235 feet of screening fence exists along Thweatt Road and 215 feet of screening fence exists along Coppell Road. Additional landscaping and new fencing will be installed as was required by the City Council in 1989. The final plat for the Coppell Switching Station was approved with the provision that TU Electric would be relieved of paving Thweatt Road and Coppell Road, contingent upon TU's dedication of right-of-way for both roads, and also donation of right-of-way for the old Brazos Power and Light easement, which parallels Sandy Lake Road. TU Electric will pay for the line at the time the City initiates the upgrade and improvement of Sandy Lake Road. Because TU Electric has frontage on Coppell Road and Brazos Electric owns property along both Coppell and Thweatt Roads the City will initiate an agreement which includes both utilities and the City of Coppell. The following variances were requested along with this site plan amendment: 1) Using rock vs. concrete for yard surface 2) Open ditch drainage 3) Minimum landscaping to be done at this time (complete landscaping to take place when the street is widened) 4) Rock instead of concrete drive (concrete drive to be added when street is widened) Staff has no objections to the approval of the variances; however, the conditions of approval should be placed on the site plan as well. ALTERNATIVES: 1) Approve the site plan amendment 2) Deny the site plan amendment 3) Modify the site plan amendment ATTACHMENTS: 1) Site plan 2) Zoning exhibit 3) Letter requesting variances 4) City Manager's comments (6-13-89) sl041a, stf BRAZO$ E;[cra c Coot'ER 4m'£ January 6, BRAZOS ELECTRIC POWER COOPERATIVE. INC. 2404 LaSalle Avenue · P.O. Box 2585 VYaco, Texas 76702-2585 {817~ 750-6500 FAX 18171 750-6290 1993 Coppell CiO Council & Coppell Planning & Zoning Committee 255 Parkway Blvd. Coppell, Texas 75019 Re; Zoning Application, Coppell Substation, Brazos Electric Power Cooperative, Inc. Gentlemen: Along with the above referred to Zoning Application, Brazos Electric hereby requests the following variance, which is identical to the variance granted to TU Electric in 1989 for this same substation site: 1. Using rock versus concrete for yard surface. 2. Open ditch drainage. 3. Minimum landscaping to be done at this time (complete landscaping to be done when street is widened). 4. Rock instead of concrete drive (concrete to be added when street widened). We will be happy to discuss this with you or your staff. Very truly yours, Albin A. Petter, P.E. Enhroment~ & ~d Acquisition M~ager B ALZOS ECTRIC COOPERATIVE BRAZOS ELECTRIC POWER COOPERATIVE, INC. 2404 LaSalle Avenue · P.O. Box 2585 Waco, Texas 76702-2585 (817) 750-6500 FAX (817) 750-6290 Mr. Gary Sieb, A.I.C.P. Director of Planning & Community Services 255 Parkway Blvd. Coppell, Texas 75019 Re: Case #S-1041 (A) - SUP Application Dear Mr. Sieb: Pursuant to our conversation on February 26, 1993, I am writing to conf~m that subject to the City's approval of Brazos Electric's SUP application, Brazos Electric would agree to certain conditions, set forth below, to be incorporated in the SUP pursuant to the above referenced application. By way of background, the June 5, 1989 letter from Alan D. Ratliff, City Manager for the City of Coppell to Tom Parsons, the then District Manager for TU Electric (a copy is attached as Exhibit A) and the City Council minutes of the 1989 SUP approval (a copy is attached as Exhibit B) indicates that TU would be relieved of the cost of paving pursuant to the future widening of Thweatt and Coppell Road contingent upon the following conditions: 1) The dedication to the City of a 40' easement out of the substation site along Thweatt and Coppell Road; 2) The donation to the City by TU Electric of "the right-of-way for the old Brazos Power and Light easement which parallels Sandy Lake Road," and 3) TU Electric would pay for the relocation of "this line" (referring to the "old Brazos Power and Light" line) at the time the City initiates the upgrade and improvement of Sandy Lake Road. Although Brazos Electric and TU Electric dedicated the 40' easement as agreed upon in condition #1 above, the agreements negotiated and agreed to between TU Electric and the City in 1989 were never incorporated into a written agreement, and there appears to be some disagreement as to what the parties intended with regard to condition 2 and 3. Because it is essential that Brazos Electric proceed with the needed improvements to the Coppell Substation site immediately, and in order to secure approval of the Special Use Permit at the March 9, 1993 City Council meeting, Brazos Electric has agreed to pay to the City the paving assessment (estimated at between $179 and $9.00 per running foot) for the 379.57 feet of substation site frontage along Thweatt Road and the 171.06 feet of substation site frontage along Coppell Road, such frontage being shown on Exhibit C, attached hereto Please confh'm in writing that Brazos Electr/c's SUP application #1041 {A) is set on the March 9, 1993 City Council A~enda, and that the City Manager and Planning Department will recommend to the City Council that Brazos Electr/c's SUP application be approved with the following conditions, in lieu-of conditions i and 2 of your letter to me dated January 22, 1993. As restated, these conditions would state: 1) that Brazos Electric will pay to the City the paving assessment (estimated at between $179 and $200 per running foot) for the 379.57 feet of substation site frontage along Thweatt Road and the 171.06 feet of substation site frontage along Coppell Road, as shown on Exhibit C; 2) more complete landscaping along the substation site frontage along Thweatt Road and Coppell Road when the roads are £mished; and 3) including the four variances set forth in Brazos Electric's letter to the City dated January 6, 1993. If the City Council should deny Brazos Electr/c's application for a Special Use Pei-mit at its March 9, 1993 meeting, this offer will be withdrawn. Very truly yours, Albin A. Petter, P.E. Environmental & Land Acquisition Manager Encl. P 0 Box 478 Coppeil. Texas 75019 214 - 462 - 0022 June 5, 1989 Mr. Tom Parsons District Manager TU Electric 14400 Josey Lane Farmers Branch, TX Dear Mr. Parsons: We will place an item on Coppell's City Council's June 13th agenda for approval of TU Electric's final plat. As discussed, I will recommend to the Council that TU be relieved of the cost of paving, contingent upon TU's dedication of right-of-way for both Coppell and Sandy Lake Roads, as well as your agreement to donate the right-of-way for the old Brazos Power and Light easement which parallels Sandy Lake Road. TU Electric will pay for relocation of this line at the time the City initiates the upgrade and improvement of Sandy Lake Road. Let me know if this is not consistent with what was discussed at our recent meeting. We will also require that TU provide executed easements the right-of-way for Coppell and Thweat Roads. for Sincerely,. Alan D. Ratliff City Manager ADR/dgc Attachment xc: Larry Jackson, City Attorney bxc: Mayor and city Council ~tem 19: Recons/~'ratton of a Final Plat for the "~pell Switching Station. on a 3.407 acre site located on the northwest corner of Thweatt Road and Sandy Lake Road at the request of TU Electric. Date of P&Z Meeting: P&Z Decision: 4-20-89 Approved (4-1) with stipulations. Date of CC Heeting: 5-9-89 CC Decision: Denied without prejudice (7-o) City Engineer Russell Doyle made the presentation to the Council. This item had been previously denied without prejudice by the Council on Hay 9, 1989. Mr. Doyle stated that the applicant is requesting consideration of approval. The final plat. had been approved by the Planning and Zoning Commission on April 20, 1989 with three (3) variances which were as follows: 1. Using rock versus concrete for yard surface 2. All open ditch drainage on Coppell Road on the perimeter of their site 3. Rock instead of concrete drive for driveways Hr. Doyle further stated that Planning and Zoning Coe~tssion reco~.=ended full landscaping on Coppell Road and Thveatt Road extending 20 feet past Page 8 of 11 the present fence on both the north and the west. Mr. Tom p representing TU Electric was also present to discuss th arsons, a s n this item, Hayor p m h the acre Site lo .... 1 or the Cop-ell S-~ ..... erson sandyRoad. ,t o, ,he northw,,tStation.. on a '"= request of TU ~m ......... ~ Th~eatt Road and on the plat and with the further provision that TV Will be relieved of ~-=~.r~c wzt~ the variances listed the cost of pavinE, contingent upon TU's dedication of right-o/-~ay for both Coppell and Sandy Lake Roads and donate the right-of-way for the old Brazos Power and Light easement which parallels Sandy Lake Road. TU Electric will pay for relocatiOn of this line at the tl~e Initiates the upgrade and improvement of Sandy Lake the City Horton seconded the motion: Road. ' ~ilkerson, Counci . motion carried 7- Councilman Nelson votin* -- ~hnen Thomas, Norton. Sm~h .... 0~Vith Hayor Pro Tem ~ ~u favor o! the motion. - -'-~-, uowman, Robertson and on 10-5-2 C of the Sign Ordinance which rns ~ax ~,,_C_--'.~ The vartance~e~~a.,.~.~_'~ .~=quzrements foI Chief Building Off - --~en~on Tap. Council, Hr, the PO Box 478 Coppelt. Texas 75019 214-462-0022 January 22, 1993 Mr. Al Petter Brazos Electric Cooperative 2404 Lasalle Avenue Waco, Texas 76702-2585 RE: CASE #S-1041(A) - ELECTRICAL SUBSTATION Dear Mr. Petter: This letter is to inform you that your request for approval of a zoning change request, Case//S- 1041(A), for approval of a Special Use Permit, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, January 21, 1993, with the following conditions: 1) 2) 3) 4) that TU Electric and Brazos Electric Cooperative would enter into an agreement with the City of Coppell that relieves both electric companies of paving Thweatt Road and Coppell Road, contingent upon the dedication of right-of-way for both roads to the City of Coppell, and also donation of right-of-way for the old power and light easement, which parallels Sandy Lake Road, TU Electric and/or Brazos Electric Cooperative will pay for relocation of the line at the time the City indicates the upgrade and improvement of Sandy Lake Road, more complete landscaping along Thweatt and Coppell Roads when the roads are finished and including the four variances requested The tentative date scheduled for consideration by the Coppell City Council is Tuesday, February 9, 1993, at 7:30 p.m. A representative for this case must be present at the City Council meeting. Failure to represent this item may result in the denial of this application. If you have any questions regarding this matter, please contact me at (214) 462-0639. Sincerely, Gary L. Sieb, A.I.C.P. Director of Planning & Community Services GLS/lsg X¢: Taryon Bowman, P&Z Coordinator Building Inspection s104 lapz.act Kirk A. King District Ma.agcr II "g~ELECTRIC March 2, 1993 Mr. Gary Sieb, A.I.C.P. Director of Planning & Community Services 255 Parkway Boulevard Coppell, Texas 75019 Re: Paving Assessment at Coppell Substation; Power Lines along Sandy Lake Road (Existing and Contemplated) Dear Mr. Sieb: Pursuant to our earlier discussions, including our meeting on February 26, 1993, I am writing to confirm TU Electric's position regarding the paving assessment along Coppell Road adjacent to the electrical substation and the electric power lines (both existing and contemplated) along Sandy Lake Road. (1) TU Electric will enter into an agreement with the City to remove the wood pole 69 kV electric transmission line presently in place along Sandy Lake Road and depicted in the plat attached (labeled "Locator Map - TU Electric Transmission Line" with the wood pole line highlighted with a yellow marker), and allow the City to utilize (donate) the fight-of-way easements (presently owned by TU Electric for this wood pole line) in the City's proposed improvements and widening of Sandy Lake Road. (2) TU Electric will enter into an agreement to pay the City the paving assessment (estimated at between $179 and $200 per running foot) for the electrical substation site frontage along Coppell Road (designated by TU Electric as the "Coppell substation"). TU Electric is willing to enter into an agreement for the two (2) matters stated above conditioned and contingent upon the City entering into an agreement to provide TU Electric sufficient right-of-way along Sandy Lake Road to construct a double-circuit 138 kV steel pole electric transmission line, preferably in a "center median" configuration, within the City's proposed improvements and widening of Sa-n'd~;l~k~-R-~d~"(as depicted in the plat attached (labeled "Locator Map - TU Electric Transmission Line"). 10924. 9999 2 14400 Josey Lane Farmers Branch, Texas 75234 Mr. Gary Sieb, A.I.C.P. March 2, 1993 Page 2 We want to make very clear that TU Electric maintains an existing double-circuit 138 kV transmission line which exits the Coppell substation in a westerly direction alongside Theawtt Road. The easements for this power line were acquired from private landowners and the right-of-way is not within the presently existing road fight-of-way of Thweatt Road. This power line is not the subject of any of the agreements set forth in this letter. Please do not hesitate to contact me if you have any questions in this regard. CC: Kyle Ray TU Electric Services Room 1780 Union Tower Building Yours veryJa-uly, ~ District Manager Texas Utilities Electric Company 10924. 9999 2