Valley Ranch Center, Lot B-R-2, Block 1 (Video Update)
Development Fee Assessment
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $7,709.88 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forvrard
tO workin~ with yOU on this project. If you have any questions, please contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineerin~ & Public Works
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
~S~, D~r. I~sure Services *
DEVELOPMENT FEE TABLE
Project: Valley Ranch Center, Lot B-R-2, Block 1 (V'tde~ Update)
Date: 4/25/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
cOunCIL
APPROVAL
Water Impact Fee $3,37:5.00 $3,37:5.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $I00.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (LrrigafionfFireline) $1,494.15
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigafion/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $:50.00
(100% due at Issuance of Buildin~ Penni0
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee N/A
(100% due prior to Council Approval)
Roadway Impact Fee $2,084.88 $2,084.88
(100% due prior to Council Approval)
Street Light Fee N/A
(100% due prior to Acceptance of lh'oject
Street Sign Fee N/A
(100% due prior to Acceptance of Project
Construction Inspection Fee Need ~ubmittal of
devdopment eon~ac~
TOTAL $9,613.41
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,709.88
DbVELOPMENT FEE WORKSHEEI*
PROJECT: Vall~ Ranch Center, Lot B-R-2, Block 1 (Wgleo Update)
DATE: 4125197
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - I 1/2 inch = 5 ESU's
= ESU's
= ESU's
I - 6 inch -- 2.5 ESU's
Total #: 7.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Impection Fee:
Total #: 2 Connections O $50.00 ea.
(Single family due prior to issuance of buiMing permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter(s) @ $144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) O
Total #: I Fireline Meter(s) @
(100% due prior to issuance of water meters)
$1,494.15
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigatio~ Meter Deposit Fee:
Total #: 1 Meter(s) ~) $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
5
~ $450.00ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Impecflon Fee (All developments):
Total #: I Lots @ $50.00 ea.
{100% due prior to issuance of building permit)
$3,375.00
$144.38
$0.00
$0.00
$1,494.15
$30.00
'35.00
$2,250.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEE
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* l~relim|nary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot
N/A Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Pl~ellmlnal'y plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
NIA
$2,084.88
N/A
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
N/A
Construction ln.~3ection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCL~ATIONS
PR~:
DATE:
Vallw7 Ra~k C~nter, Lot B-R-2, Block I (Video Upda~)
4/25/~97
ROADWAY IMPACT FEE:
Land Use **
Buildin$ $iz~ ($q. Ft.)
Development Un/ts **
Vehicle Miles per Development Unit **
Fee ~r Vehicle Mile ***
Roadway Impact Fee due = (Developmem Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
o~rs / Not specir~ (com,-ercia0
6
4.76
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Rondwny lmpnct Fee Study)