Loading...
Video Update-CS 970425The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75O19 214-462-0022 Brian Miller Urban Architecture 7001 Preston Road, Suite 210 Dallas, TX 75205 Valley Ranch Center, Lot B-R-2, Block 1 (Video Update) Development Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $7,709.88 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forvrard tO workin~ with yOU on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griffin, P.E. Director of Engineerin~ & Public Works Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official ~S~, D~r. I~sure Services * DEVELOPMENT FEE TABLE Project: Valley Ranch Center, Lot B-R-2, Block 1 (V'tde~ Update) Date: 4/25/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO cOunCIL APPROVAL Water Impact Fee $3,37:5.00 $3,37:5.00 (100% due prior to Council Approval) Water Tap Inspection Fee $I00.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $144.38 (100% due at Issuance of Water Meter) Water Meter Fee (LrrigafionfFireline) $1,494.15 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigafion/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $:50.00 (100% due at Issuance of Buildin~ Penni0 Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee N/A (100% due prior to Council Approval) Roadway Impact Fee $2,084.88 $2,084.88 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of lh'oject Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee Need ~ubmittal of devdopment eon~ac~ TOTAL $9,613.41 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,709.88 DbVELOPMENT FEE WORKSHEEI* PROJECT: Vall~ Ranch Center, Lot B-R-2, Block 1 (Wgleo Update) DATE: 4125197 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - I 1/2 inch = 5 ESU's = ESU's = ESU's I - 6 inch -- 2.5 ESU's Total #: 7.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Impection Fee: Total #: 2 Connections O $50.00 ea. (Single family due prior to issuance of buiMing permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ $144.38 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) O Total #: I Fireline Meter(s) @ (100% due prior to issuance of water meters) $1,494.15 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigatio~ Meter Deposit Fee: Total #: 1 Meter(s) ~) $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 ~ $450.00ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Impecflon Fee (All developments): Total #: I Lots @ $50.00 ea. {100% due prior to issuance of building permit) $3,375.00 $144.38 $0.00 $0.00 $1,494.15 $30.00 '35.00 $2,250.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEE Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * l~relim|nary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Pl~ellmlnal'y plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A NIA $2,084.88 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction ln.~3ection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCL~ATIONS PR~: DATE: Vallw7 Ra~k C~nter, Lot B-R-2, Block I (Video Upda~) 4/25/~97 ROADWAY IMPACT FEE: Land Use ** Buildin$ $iz~ ($q. Ft.) Development Un/ts ** Vehicle Miles per Development Unit ** Fee ~r Vehicle Mile *** Roadway Impact Fee due = (Developmem Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = o~rs / Not specir~ (com,-ercia0 6 4.76 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Rondwny lmpnct Fee Study)