Loading...
Valley R Center-CS 900123COPPELL PUBLIC WORKS DATE: TO: FROM: RE: January 23, 1990 Shohre Daneshmand, Civil Engineer Larry Davis, Construction Inspector Russell Doylo/~ty Engineer Valley Ranch~Center / Sidewalk Location As we have discussed, Larry will compile copies of previously approved drawings byboth Engineering and the Building Inspections Department, as well as a copy of those plans submitted on Monday, January 22, 1990. He will then prepare a memo to Dale Jackson for my signature exhibiting the conflicts that are inherent with the processing of separate permits, etc. Likewise, Larry will provide %his perspective as to how separate permits induces confusion and contribution to the deterioration of quality control on the construction site.  se have the memo ready for my review, etc by Friday, January 1990. Thank you. RRD / b b SIDEWALK.RRD