Loading...
ST9601-CS 990723JUL-23-1999 0?:58 TEAGUE NALL AND PERKINS 8173362813 P.02/03 TEAGUE NALL AND PERKINS CONSULTING ENGINEERS OATE: 07/23/99 TO: Larry Davis, City of Coppeli FROM: Mike Jones RE: Wrangler Drive Project (Project No. ST 96-01 ) Pay Estimate No. 14 From Tiseo Paving Company We have reviewed Pay Estimate No. 14 from Tiseo Paving Company for their work on the Wrangler Drive project through 06/30/99. It appears that the work completed during the current period (06/01/99 to 06/30/99) consisted primarily of concrete paving, concrete driveways and concrete sidewalk improvements, along with the installation of pavement markings. Based upon my observations and understanding of the status of Tiseo's work on the project, I would offer the following comments for your consideration before recommending approval of the subject pay estimate: 1. Pay_l_tem_~_o_,]l-l_l 6" P,_ejr)_f_or_ce_d_Concrete Driveway, Etc~ There was additional driveway quantity added for the driveway at Sta. 29+31.96 (the old YMCA) which will over-run the proposal quantity, however, this additional work only consisted of approximately 60 S.Y. This estimate reflects an over-run of 96 S.Y. The extra 36 S.Y. should be verified prior to approval of this estimate, 2. Pay item No. 11-15 4" Reinforced COnCrete Sidewalk, Etc. This estimate reflects an over-run of 104 S.F. This additional quantity should be verified prior to apporval of this estimate. I am not aware of any reason why the quantity should be higher than the original proposal quantity. 3. Pay Item Nos. !1-28, ~I-2.9_&.11-30 Traffic Buttons This estimate reflects an slight over-run for each of these items. The additional quantities should be verified prior to approval of this estimate. 915 FLORENCE STREET 2001 W. IRVING BLVD. FORT WORTH, TEXAS 76102 IRVING, TEXAS 75061 8171336-5773 214/254-1765 PAGE I _ JUL-23-1999 0?:59 TEAGUE NALL AND PERKINS 8173362813 P.03/03 ? TEAGUE NALL AND PERKINS CONSULTING ENGINEERS 4. Pay Item No. 2A ..T:v_p_e II BIB Markers I am assuming that these am markers for the fire hydrants which apparently we did not included in our original proposal. This item wilt need to be included in the final change order alon9 with the item for the adjustment of existing sanitary sewer manholes. Should have any questions, please 9ive me a call, Thanks. I~le!~!',lyoht14'c~196164'~10c.1,~Cor~$~mernQ,dlv~,l;iy~tlmete,no14,wpd 915 FLORENCE STREET 2001 W, IRVING BLVD, FORT WORTH, TEXAS 76102 IRVING, TEXAS 75061 8171336-5773 214/254-1765 PAGE 2 TOTAL P.03