Loading...
ST9601-CS 990707 TEACUE NALL AND PERKINS ENGINEERS · SURVEYORS ~ MUNICIPAL CONSULTANTS July 07, 1999 Mr. Robert Caudill Tiseo Paving Company, Inc. P.O. Box 270040 Dallas, Texas 75227-0040 Re: Wrangler Drive Project / ST 96-0'1 (Coppell, Texas) Dear Robert: As you begin addressing some of the final items and issues on the referenced project, please remember that you still need to provide the City with verification of the pavement strength in the areas which failed to meet the minimum compressive strength of 3000 psi at 28 days. According to the test results provided by TEAM Consultants, Inc., an area in question is the north half of the roadway between Sta. 35+50 to Sta. 49+50. In accordance with the NCTCOG Standard Specifications, you have the option to core this section of pavement and have the cores tested by an approved laboratory. I would encourage you to coordinate with the City and schedule the necessary cores as soon as possible, so that this issue can be discussed and resolved before you request final acceptance. Should you have any questions, please do not hesitate to give me a call. S' r~IEY' NALL AND PERKINS, INC. L,,, Michael A. Jones, xc: Larry Davis, City of Coppell Q:~proj-r14~cp196164\docs\corres\letter. tiseo.pavernent strength.wpd 915 FLORENCE STREET FORr WORTH. REXAS 76102 (817) ]J6-5773 FAX (817) J36-2813