Loading...
Valley R Center-CS 890908Central Regional Wa.tewater System September 8, 1989 Mr. Russell'] . Doyle, P.E. City Eng~eer City of floppell P.O. Bo~ 4?8 Coppe~l, Texas ?§019 Subject: Central Regional Wastewater System Coppe11Interceptor Po/nt of Entry Request Valley Ranch Center Dear Mr. Doyle: In response to the point of entry request dated September 5, 1989, the Authorityhas reviewed the construction standards tobeufll~edon the point of entry. The Authority approves your request based upon the information subm~ttedwh/chincludes the construction plans datedFebruary 1987 for the Valley Ranch Center designedbyAlbertH. HalffAssociates, Inc. for the City of Coppe]/, but is subject to the following requirements. The Central Regional Wastewater System Engineering Division must be contacted (214. 263-2251 or 214 262-5186) at least ?2 hours prior to construction. If the Authority is not notified the Authority reserves the r/ght to request the contractor to excavate his work for inspection. All inspect/ons wi]/ be performed only by Authority inspectors. City inspectors are not responsible for Trin/ty l~iver Authority property. All po/nts of entry mu~t be constructed within one year after their acceptance by the Authority. Any alterations to the plans concerning the Authority's interceptor, point of entry or easements must also be approved by the Authority. A preconstruction meeting with the contractor and the Authority is required prior to construction. P.O. Box 531196 Grand Prairie, Texas 75053 (214) Metro 263-2251 September 8, 1989 Russell Doyle ~a~e ~ All P.V.C. connections shall use an A.C. pipe adaptor. The connection shall be concrete encased 3 feet from the manhole. Connections to existing manholes shall be core drilled. Jack hammering shall not be allowed. Any damage to the manhole during core drilling operations shall be repaired ~mmec~ately by the contractor. There is an existing connection to the Coppell Interceptor at Station 163+95 from the MobLl station at 1301 East Beltiine Road. This connection sha// be removed and the manhole riser plugged prior to construction of the Valley Ranch Center point of entry. Sanitary sewer service for the development cannot commence until the Authority accepts and approves the point of entry In addition to the above, personnel from the Engineering Division must be onsite during construction, as well as prior to any backfilling of the Authority~s facility ~n th~s area. This point of entry shall serve the City of Coppell and will be metered at Meter Station I?.OE. If you have any questions or co~ents please contact me. Patrlcta Cleveland Manager, Technical Services cc: Steve Lemke, Dunaway Associates, Inc.