Loading...
Town Center West-CS010523 T H [ G I T Y 0 F ~ COPPELL CONSTRUCTION DEVELOPMENT PERMIT APPLICATION 1. Name of Applicant: 0 ~ I t~ I~e i~C ~i~, Vd, Phone Number: g' - -'Tq 2. Location of Construction (address): I Zq ~ I U ~ "To ~J~ It~ (..~ ~ Subdivision Section # Block # Lot # OR Survey/Abstract # Acreage Location description (attach vicinity map): 3. Type of proposed construction or development: ( ) Residential ( ) Alteration of a natural waterway drainage course (~on-residenfial ( ) Other (describe & attach drawing or sketch) ( ) Placement of Fill (in right-of-way or on private property) 4. Description of Construction Permit requested: (~aving ( ) Median or Landscaping ( ) Box Culvert ( ) Sidewalk ( ) Water Main ( ) Rip Rap ( ) Drive Approach 6e)~.C.P. ( ) Fill Area (%/f~Excavation ( ) Sanitary Sewer Main ( ) Drainage Channel Excavation ( ) Fire Lane ( ) Flume ( ) Slope Protection/Retaining Wall ( ) Bridge (~det (kdfl~arklng Lot · :. Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. 5. All construction shall be in compliance with, but not limited to, the City of Coppeil Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion and Sedimentation Ordinance. 6. Applicant shah provide a copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. t ° CONSTRUCTION DEVELCrrMENT PERMIT APPLICATION - Page 2 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to be~'nn|ng work. Amount Due: f'~ ~ ~ 0 0 Date Paid: NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3500 Street Department @ 972-304-3546 Engineering Department ~ 972-304-3679 ~ Attach barricade plan / trench safety plan of a lane or street closure. (Required) Note: Street closures are allowed from 9:00 a.m. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. > A pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector to schedule meeting. e ' Printed Name Date CityIn~ Contact Number(s) FOR CITY USE ONLY Is the f'dl area located in an identified flood hazard area? ( ) YES ( ~ If YES, then a Floodplain Developme..nt Permit is required before any construction can begin. Is additional information required? ( ) YES (~O Are other federal, state, or local permits requires? ( ) YES (c~ (~E~IT APPLICATION APPROVED ( )PERMIT APPLICATION DISAPPROVED City Approval Date Applicant shall indemnify and forever hold harmless against the City of Cappell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from. the City, if such permit is granted.