Coppell Industrial-LR011008 ENVIRONMENTAL CONSULTANTS
CONCR~EPORT
Be el~l Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 209
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 10-08-01
Addison, Texas 75001 TECHNICIAN: R. Hollings
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
I Set Number I Location I Quantity Represented
1 Slab leaveout at G-25 20/80
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
Potter 9349 4000
Test Results
Set Cylinder I Age@ I Total Load I Compressive I Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 3912 10-15-01 7 164810 5830
3912 11-05-01 28 206470 7310
3912 11-05-01 28 209310 7410 7360
Cylinder Data
SetI Cylinder Time ofI I Concrete Air Ticket
lNo. ID Slump Sample Air Temp. Temp. Entrainment Number
3912 5.00 8:45AM 68 74 N/A 614470
Mail Submitted by:
Distribution: (1)Champion Partners, Ltd./
Mr. Kerry Burden REED ENGINEERING GROUP, INC.
(1) C.D.Henderson, Inc./
Mr. Jason Nunley Original Signed By
(1) AECC, Inc./Mr. Fran Carter
(1) Haynes Whayley Associates, Inc./ Keith Atkins
Mr. Kent Penrod KENje
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brent Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 * -rE~. [214] 350 5600 ,, FAX [214] 350 0019