Loading...
Riverside Church-LR011108 il/13/"'2881 89:88 97'7878888~ TRINITY ENGR-D&LL&5 P~6E 85 Report No.: 10 TFtlNITY ENGINEERINC/KLEIN ...... ,,)ER 221 l Century Center Bivd, ~"' .~,~-~,,,~,:,,~..' ......... '~,:.,,,?,' Suite 101 CONCRETE CYLINDER COMPRESSIVE STRENGTH REPORT ASTM C39 [Report Date: t 118/01 Last Reissued on: Report To: Greg McGahey Project No.: T-4006 Ref. No.: 1001058 Riverside Church of Christ Project: Riverside Church of Christ 150 E Beltline Road Coppell, Texas Phase: N/A Coppe!l, TX 75019 Permit No.: ,,.,,~ : ~ ~l,~er:! Supplier: Beall Concrete Cement Type: Cement Factor (~k/cy): Mix No.: 133 Max, Size Agg.(in,): Design Strength: 3600 ps[ ~, 28 days Admixtures: ::;?llit!' , ~,;! ,, .. .... , : .... ,,. : : Date Sampled: 10/4/01 Date Received: 10/5/01 Measured Specified Source of Sample: Grade Ream - South west of Building Slump(In.): 4 l/2 2 6 Slump w/plasticizer(in.): Contractor: Anchor Companies Air Temperature (°F): 86 .... Truck/Ticket: 206/89003174 Mix Temperature (°F): 88 · Sampled By: H. Crayton Air Content (%): ...... Submitted By: H. Crayton Unit Weight (pcf): Curing Method: Cure Room Batch Size (cy): 10 Specimen Prep: Unbonded Weather: Water Added (gal,) 0 Field Cure Tamp CF) Hi: Lo: Wind (MPH} Time Batched: 2:49 Field Cure Time: 24+4 hrs. Rh (%): Time Sampled: 3:50 Time In Truck: 1' 1 Sample Date Age I Dimensions Area Ultimate Load Compressive Required I Number ~ Tested . (days) Diam. Ht. Lan. (in? (lbs.) Strength (psi) Strength (psi) i 100989 A 10/11/01 7 6 x 12 x '28.27 75000 2650 [ 100989 B 10/11/01 7 6 x 12 x 28.27: 74500 2.630 -- . ~ . ~2 '28127 ' 107000 3780 3000 ; .0989 C 11/1/01 28 ~ x x [ 100989 DI 11/1/01 28 ~1 6 X 12 X . 28.27 110000 3890 3000 Average 28 Day Strength (psi): I 3840 I Al! fractures were conical in nature unless ~oted otherwise. Remarks: ..v,.w.,o. ,,,,,o, cc: Wm. Duane Harrell, P,E. David Turner K.B. Alexander- fax Larry Davis City of Coppetl - fax Lee Stone City of Coppell - fax Bob Bandy V. Aubrey Helium Architects John Millett, P.E. Millett Engineering Group Unless pr~or arrangements have been made, all HOLD specimens will be discarded if required strength Is attained.