Loading...
Riverside Church-LR011102 11/05/2001 10:53 9728700802 TRINITY ENGR-DALLA'.:i PAGE 02 Report No.: 1 1 TRINITY ENCINEERING/K1LEINFELDER 2211 Century Center Blvd, ~'~'""~;"~""~'"""~"~' Suite 101 CONCRETE CYLINDER COMPRESSIVE STRENGTH REPORT ASTM C39 Report Date: 11/2/01 Last Reissued on: Report To: Greg McGahey Riverside Church of Christ Project No.: 10645 Eel. No.: 1001370 150 E. Reltline Road Project; Riverside Church of Christ Coppell, Texas Phase: N/A Coppell, TX 75019 Permit No,: ' Mix Data RePorted to Kleinfelder ~upplier: Beatl Concrete Cement Type: M;x No,: ~30 Cement Factor (sidcy): Max, Size Agg,0n.): Design Strength; 3000 psi ~ 28 days Admixtures: Sample' Data ' '~ ObSerVed by Klelnf~lder ! :' '::, Date Sampled: 10/24/01 Date Received: Measured Specified Source of Sample: Pier ~f-45 Slump(In,): 4 1/2 Slump w/plasticizer(in.); Contractor: Air Temperature (*F): 77 TruckJTi(;ket: 234/89003831 Mix Temperature (°F): 75 Sampled By: C. Miller Air Content (%): Submitted By: C, Miller Unit Weight (pot'): Curing Method; Cu re Room Batch Size (cy): 10 5Jpecimen Prep: Uabonded Weather: Water Added (gal.) 0 F;eld Cure Tamp (°F) HI: Lo: Wind (MPH) Time Batched: 09:48 Field Cure Time: 24±4 hrs. Rh (%): Time Sampled: 10:30 Time in Truck: 0:4:2 ::""' !: !i~! i!~.: ~ ~' '.~::" :.'C, :~':~iii':;,:ii.' :!:: /:~:~% ~ ':::.. ;'~,.~ ~:=~ !!~,:~:' :i'; ;! :.ii! .: ! 'i'~i' ~ ~' ~'' ~! ": ":'~' ,~' '~ '~.i..:~;.,~i~ ~ ; .,': ', Sample I Date ' Age Dimensions Area ; Ultimate Load Required co~pr~s,ve Number Tested (days) Diam. Ht. Lan. (In=) (tbs,) St~h (~1) Strength (psi) Average 7 Day Strength (psi): 3330 AIl fractures were conical in nature unless noted othenNise. I [" ~ cc: Wm Duane Harrell, PE David Turner K.B, Alexander - fax Larry Davis City of COppell - fax Lee Stone City of Coppett - fax 9ob Bandy V. Aubrey Hallum Architects .John Millett, P.E, Millett Engineering Group {,~nlesS prior arrangemeots have been made, all HOLD specimens will be discarded ff required Strength Is attained. A TRINITY ENCINEERING/KLEINF£LDEI~ Report No..' 10 ~, ~,,,,;~,~.~ o ~.,,,,~,~,,,~ 2211 Century Center Blvd. ' Suite 101 CONCRETE CYLINDER COMPRESSIVE STRENGTH REPORT ASTM C39 Report Date: 11/2/01 Last Releaued on: Report To: Greg McGahey Riverside Church of Christ Project No.: 10645 Ref. No.: 1001347 150 E. Beitline Road Project: Riverside Church of Christ Coppell, Texas Phase: N/A, Copperl, TX 75019 Permit No.: : Mix Data ;Reported to Kleinfetd~r' ,:?! .... Supplier: Beall Concrete Cement Type: Mix No,: 230 Cement Factor (sldcy); Max. Size Agg.(ln.); Design Strength: 3000 psi (~ 28 days Admixtures: Saa~Ple Data~. 0bserve'd bY Kleinfe der~ ,, r ::., .... , , . ,, Date Sampled: 10/23/01 Date Received: Measured SPeCified Source of Sample: Pier #46 Slump(in.): 5 Slump w/plasticizer(in,): Contractor: Air Temperature (OF): 87 Trtlck/Tlcket: 221 Mix Temperature (OF): 82 Sampled By: C. Miller Air Content {%): .... Submitted By: C, Miller Unit Weight (pcf): ...... Curing Method: Cure Room Batch Size (¢y); 6 Specimen Prep: Unbonded Weather: Water Added (gal.) 5 Field Cure Tamp (°F) Hi: Lo: Wind (MPH) Time Batohed: 14:24 Field Cure Time: 24±4 hrs. Rh (%): Time Sampled: 15;20 Time in Truck: 0; 50 S';'mple Date Age Dimensions I Area ul.m% Loadi Compressive Required ' ....: Number Tested ... (days) r Diem, Ht. Lan. J (In') (lbs.) Strength (psi) Strengtll (psi) i~1145 'A ,, 10/30/01 7 l' 6- x" ~2 x " 28,27 .... 86000" ' 3'040 i 101145 B "10/30/01 I 7l~ 2410 6 X 1;~" X !2~127 ' - ' 68000 ........... 10~145 cD' 1t/20t~i 28 x' x i .... 3od'o ~-_1011'~511'2 '0/01 ..... × x"I I "3000 Average 7 Day Strength (psi): Z730 All fractures were conical in nature unless noted othe~ise. Remarks: cC: Wm. Duane Harmll, P.E. David Turner K.B. A,lexander - fax Larry Davis City of Coppell - fax Lee Stone Cib/of Coppell - fax Bob Bandy V. Aubrey Helium Architects John Miilett, P.E. Millett Engineering Group Unless prior arrangements have been made, al~ HOLD sl3ecimens wll~ be discarded If required strength ia attained, p~dlng OUt ~flen ~ppr~val.