Loading...
Riverside Church-LR01103111/'81/2881 15:48 9728788882 TR];N];TY ENGR-DALLAS PAGE 82 A TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Blvd, Suite 101, Irving, Texas 75062 ~ 972.870-0808 Metro 972-953-0398 Fax 972-§70-0802 TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E Beltline Road Coppell, Texas Coppell, Texas 75019 Project No.: 10645 REPORT DATE; 10/31/2001 REPORT NO.: '~001370 Test date: l_.0/24(2001 Technician: C, Miller Trinity Engineering / K[einfelder's representative was on the job site for pier drilling. Pier ¢,--45 was drilled it was the final pier for the job. The pier was clean and dry before concrete was poured. 1 set of cylinders were made. Depth to Primary: 1. Initial depth to primary 2. Depth casing set, penetration starts here. COPIES TO: 2- Client. Attn: Greg McGahey TRINITY ENGINEERING I KLE1NFELDER 1- K.B. Alexander, Affn: David Turner AUn: La~ Davis . ' A~: Lee 1- V. Aubrey Helium Amhltec~, A~: Bob Bandy Wm. Duane Harrell, P 1- Mille~ Engineeflng Group, At~: John Mille~. 11,,'"£'i1,,~'2r301 15:40 972870t~802 TRINITY ENGR-D~LL~S PAGE 03  TRINITY ENGINEERING / KLEINFELDER 221 ~i Century Center B, Ivd,, .Suite 101, Irvirtg, Texas 75067_  972-870-0806 Metro {)72-~53-0398 Fax 972-870-0802 STRAIGHT SHAFT PIER REPORT TO: Riverside Church of Christ PROJECT; Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Coppell, Texas 75019 Project No.: 10645 Test Date: 10/24/2001 Report Date: ~10/31/2001 Technician: C. Miller Report No: 1001370 Page 2 of 2 I DENTI FI CATION .............. MARK 45 SHAFT DIAMETER ....... PLAN/ACTUAL 18"/22" TOP OI¢'" 3' froth' ' .... PIER ELEVATION ~ finished floor DEPTH TO PRIMARY 30,5'/32.1' TOTAL DEPTH OF PIER 37.1' PRIMARY PEN ETi~'ATION PLAN/ACTUAL 5.0?5.0' DEPTH AND DIAMETER OF CASING 18"/29,0' PLUMBNESS VARIATION WITHIN TOLERANCE TiME DRILLING COMPLETED 8:45 AM STEEL .............. CAGE LENGTH 36.0' REBAR QUAN./SIZE ~'4'~3 .... HOR,IZONTALNERTICAL 6~t4 CONDITION OF PIER CLEAN .... BEFORE CONCRETE DRY TIME CONCRETE PLACEMENT 10:20 AM Remarks: ' - Top of pier elevation obtained from construction drawings Reports to: 2- Client, Attn: Greg Mc, Gahey 1- K.B. Alexender, Affn: David Turner TRINITY ENGINEERING I KLEINFELDER 2- City of Coppell (fax) Attn: Lar,'y Davis Attn: Lee Stone 1- V. Aubrey Helium A~hltects, Attn: Bob Bandy ....... 1-MIIlett Engineering Group, Attn: John Millet-t, P.E, Win. Duane Harrell, P.E. TRINITY ENGINEERING / KLEINFELDER 2211 Cer~tuty Center Bivd, Suite 101, Irving, Texas 7'5062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Belttine Road Coppe[I, Texas Coppell, Texas 75019 Project No.: 10645 ; REPORT DATE: 10/31/'2001 REPORT NO.: 1001350 ............. Page 1 of 2 Test date: 10122/2001 Technician: C. Milter Trinity Engineering I Kleinfelder's representative was on the job site for pier drilling. 5 piers were drilled on this date. All piers were clean and dry before steel and concrete were added. Depth to Primary: 1. Initial contact with Primary 2. Depth of casing: penetration starts at this point. Cylinders were made from Pier #38 Also contractor poured 2 short sections of grade beam. COPIES TO: 2- Client, Attn: Gre;l McGahey TEINITY ENGINEERING I KLEINFELDER 2- City of Coppell (fax) Attn: Larry Davis , A~tJ'~: Lee Stone 1- V. Aubrey Hallum Archltect~, ^~tn; Bob Bandy Wm. Duane Harrell, P.E. 1- Millett Engineering Group, Attn: John MIIlett, P.E. Tn~ ~.ult* shcrw~ On ~le reDort are i~r th~ exci'uslve use of the ¢Jien~ TRINITY ENGINEERING / KLEINFELDER 22'11 Century Center Blvd., Suite 101, t~lng, Texas 7,5062 g72-570.0808 Metro 972-{)53-0398 Fax 972~870-08P_,2 STRAIGHT SHAFT PIER REPORT TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Coppefl, Texas 75019 Project No,' 10645 Test Date: 10/22/2001 Report Date: 10/31/2001 Technician: C. Miller Rel~ort No: 1001550 Page 2 of 2 .... iDE'NTiFi~,ATiON ...... MARK 29 28 44 43 38 SHAFT 'DIAMETER ....... P LAN/ACTUAL 18"/22" 18"/22" 18"/22" 18"122" 30"/32" TOP OF 3, b[e~w 3, b~eow 3-;--bl~w . 3, bleow 3' bleow ................ PIER ELEVATION ~ finish f~oor finish floor finish floor ,., finish floor finish floor DEPTH TO PRIMARY 30.5'/32,3' 30.5'/32.5' 30.8'/32.7' 30.8'/32.7' 29.5'/31.3' TOTAL DEPTH OF PIER 38.2' 38.1' 38.0' 38,2' 36.4' P RI MARY "P"F."N ETRATION ' PLAN/ACTUAL 5,0'/5.9' 5.0'/5.6' 5.0'/53' 5.0'/5,5' 5.0?5. DEPTH-AND '" DIAMETER OF CASING 18"/29.0° 18"/31.0' 18'731,0' 18"/29.0' 30"/30'0 WITHIN WITHIN'' WITHIN ..... WITHIN WITHIN PLUMBNESS VARIATION ., TOLERANC., ,E TOLERANCE TOLERANCE TOLERANCE TOLERANCE TIME DRILLING COMPLETED 8:40 AM 9:27 AM 11:42 AM 1:13 PM 2:35 PM 'STEEL ........ CAGE LENGTH 36.5' 36.0' 36.5' 36,0' 35.0' REBAR QUAN./SIZE 24h~3 "' 24//~3 24,~3 24/~3 351#3 ......... HORIZONTAL/VERTICAL CONDITION OF PIER CLEAN' CLEAN CLEAN CLEAN CLEAN .... B.EFORE CONCRETE DRY DRY DRY DRY DRY TIME CONCRETE PLACEMENT 10:10 AM 10:30 AM 4:55 PM 4:25 PM 3:55 PM Remarks: - Top of pier elevation ,,o.btained from construction drawings Reports to: 2- Client, Attn; Grog McGahey 1- K.B. Alexander, Attn: David Turner TRINITY ENGINEERING 1 KLEINFELDER Attn: Larry Davis Al:tn: Lee Stone . 1- V. Aubrey Hallum Architects. Attn: Bob Bandy 1- Millett Engineering Group, Attn: John Mlllett. P.E, WITI. Duane Harrell, P.E, 11/81/2081 15:40 9728708882 TRINITY ENGR-DALLAS PAGE 06 A TRINITY ENGINEERING ! KLEINFELDER 2211 Century Center Blvd, Suite I01, Irving, Texas 75062 ~ 972-870-0808 Metro 972-9,53-0398 Fax 972-870-0802 TO: Riverside Church of Christ PROJECT; Riverside Church of Christ '150 E. Beltline Road Coppell. Texas Coppell, Texas 750'~9 Project No.: 10645 REPORT DATE: 10/3112001 REPORT NO.: 1001349 ........................ Pa~.e 1 of 2 Test date: 10/19/2001 Technician: C. Miller Trinity Engineering / Klelnfelder's representative was on the job site to drill piers. 4 piers were drilled on this date, Steel was set in cased piers and was filled with concrete, 1 set of cylinders were made from Pier #30. Depth to Primary: 1, Actual depth to primary 2. Depth where casing was set and penetration began. COPIES TO: 2- Client, Attn: Greg McGahey TRINITY ENGINEERING / KLEINFELDER 1- K.I~. Alexander, Attn: David Turner Arm: Lam/Davig . Attn; Lee Stone 1- V. Aubrey Helium Architects, Attn: Bob Bandy Wm. Duane Harrell, P.E. 1- Millett Engineering Group, Attn: John Millett, P.E.  2211 Century Center Blvd.. Suite 101, Irving, Texas 75062 972-870°0808 Metro 972-§53-0398 Fax 972-870-0802 STRAIGHT SHAFT PIER REPORT TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Cappell, Texas 75019 Project No.: 10645 Test Date: 10/19/2001 Report Date: 10/31/2001 Technician: C. Miller Report No: 1001349 Page 2 of 2 IDE~TIFt'CATION .............................. - ..... MARK 31 32 27 30 SHAFT' DIAMETER ............... PLAN/ACTUAL 18"/22" 24'?28" 24"/28" 30"/32" 'ToP OF 3' below 3' below 3' below 3' I~elow ..... PIER ELEVATION ~ ....finish floor finish,f,,Ioor finish floor finish floor DEPTH TO PRIMARY 32.0'/30.5' 32,4'/30.0' 31,2'/30,6' ! 31.4'/30.2' TOTAL DEPTH OF PIER 37,2' 38.0' 36.6' 37.2' PRIMARY' 15i= NETR;~TION PLAN/ACTUAL 5,0'/5.2' 5,0'/5.6' 5.0'/5.4' 50'/5,8' DECC~H AND ,,, DIAMETER OF CASING 18"/31' 24"/28' 24"/29' 30"/30' PLUMBNESS VARIATION WITHIN .... WITHIN WITHIN WITHIN TOLERANCE TOLERANCE TOLERANCE TOLERANCE TIME DRILLING COMPLETED 8:50 AM 9:45 AM 11:41 AM 1:37 PM STEEL CAGE LENGTH 37.0' 36,0' 35.0' 36.0' REBAR QUAN./SIZE 25~3 .... 35~3 34h~3 ";~:7hr¢5 .... HORfZONTALNERTICAL 6/~ 64~5 6/#5 CONDITION OFPIER- CLEAN 'CLEAN CLEAN CLF_.~I~ ................ BEFORE,.~ONCRETE DRY DRY DRY DRY TIME CONCRETE PLACEMENT 10:35 AM 10:50 AM ,3:50 PM 3:30 PM Remarks: ,..' Top of pier elevation obtained fro__m constructi.o.n drawings _ _ Reports to: 2- Client, Attn: Greg McGaAey t. K,e, Alexander, Att~: David Tumer TRINITY ENGINEERING I KLEINFELDER 2- city of ceppell (fax) Attn; Lee Stone 1- V. ^ubrey Helium Arcllitects, Attn: Bob Bandy ....... 1- Mlllett Englneeflng Group, Attn: JOhn Millett, P.E, Wm. Duane Harmll,