ST0004-LR011004~ GEOTECHNICAL, ENVIRONIV~ENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON AUSTIN LONGWEW
? 1050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080
_- Concrete Compression Test Report
Client: The City of Coppell Report Distribution: (1) The City of Coppell
Project: Freeport Parkway Pavement (1) Quantum Contracting
Repair
TMI Report No.: DC01-066-058
Report Date: 10/04/2001
Specifications Test Data
Strength 4000 psi @ 28 Days Placement Date 09/27/2001
Slump 5 in max Sampled By Kedric Alexander
Air Content 3 % min 6 % max Weather Clear
Concrete Temperature n/a Supplier/Mix Hanson/9636
Ambient Temperature n/a Air Content Method ASTM C-231-B
Ticket Number: 820976 Time Batched: n/a Time Sampled: 12:25 pm
Slump: 3 in Air Content: 4.0 % Unit Weight: n/a
Concrete Temperature: 86° F Ambient Temperature: 90° F Yardage (c.y.): 30 of 60
Placement Location: Paving, Freeport Parkway
Sample Location: 60' East from the NE corner of the building and 60' North
Cylinder Age Max Load Area Strength Fracture
Set
Test Date (days) (lbs. force) (sq.in.) (psi} Type
1 09270101 10/04/2001 7 133530 28.27 4720 unbonded cap
I 09270102 10/25/2001 28
I 09270103 10/25/2001 28
1 09270104 Hold
Normal cylinder size: 6"x 12"
Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231.
L-*.../_
TERRA-MAR, INC.
S~ Vi~ Pr~id~t
The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of
this report, or any part therein, is strictly prohibited without the express written consent of TMI.
Page 1 of l