Loading...
ST0004-LR011004~ GEOTECHNICAL, ENVIRONIV~ENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGWEW ? 1050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 _- Concrete Compression Test Report Client: The City of Coppell Report Distribution: (1) The City of Coppell Project: Freeport Parkway Pavement (1) Quantum Contracting Repair TMI Report No.: DC01-066-058 Report Date: 10/04/2001 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 09/27/2001 Slump 5 in max Sampled By Kedric Alexander Air Content 3 % min 6 % max Weather Clear Concrete Temperature n/a Supplier/Mix Hanson/9636 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 820976 Time Batched: n/a Time Sampled: 12:25 pm Slump: 3 in Air Content: 4.0 % Unit Weight: n/a Concrete Temperature: 86° F Ambient Temperature: 90° F Yardage (c.y.): 30 of 60 Placement Location: Paving, Freeport Parkway Sample Location: 60' East from the NE corner of the building and 60' North Cylinder Age Max Load Area Strength Fracture Set Test Date (days) (lbs. force) (sq.in.) (psi} Type 1 09270101 10/04/2001 7 133530 28.27 4720 unbonded cap I 09270102 10/25/2001 28 I 09270103 10/25/2001 28 1 09270104 Hold Normal cylinder size: 6"x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. L-*.../_ TERRA-MAR, INC. S~ Vi~ Pr~id~t The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. Page 1 of l