Loading...
ST0004-CS010806 (2)08/06/01 M0N 10:37 FAX 9727221114 ~00,3 t QUANTUM CONTRACTING, INC. P. O. BOX 430 ~72-771-9fil 1 ROCKWALL, TX 75087 1-972,-722-1114 (fax) Ken C_xfiffin, City Engineer Department of Engineering City of Coppell P 0 Box 478 Coppell, TX 75019 REF: Median paving, Freeport Parkway Bid ltem I-2 of our Freeport Parkway Reconstruct Project sets up 250 SY of median paving ~$42.00/SY for a total of $10,500.00. The scheduled repairs are shown at four locations (M-1 through M-4) and indicate replacement of 4' thick concrete that is severely damaged at those four locations. The actual field measurement of the damaged median totals 157 SY for a cost of $6,594.00. Please note that the repair M-4 has been eliminated since a left turn lane is being built at this location at the expense of the Koll Center Project now under construction. However, I have added a location at the Gateway crossover that is also in serious need of replacement. Median Pavine damaeed areas: M-1 59 SY ;, 0 M-2 53 SY ~,D M-3 15 SY a 2. Gateway 30 SY 157 SY Because of the inevitability of future damage due to the heavy truck ~xaffic at the intersections and crossovers, I recommend the installation of a monolithic median nose at the M-3 instead of the median pavement as scheduled. This will be easier on the tragic and stru~urally more maintainable since the median area would be poured monolithic 08/05/0! M0N 10:37 FAX 9727221114 ~004 with the curb and the concrete thickness would graduate fi.om 11" to 14" thick instead or' the 4" cap. The recommended procedure 'to install the mono median nose is as follows: 1. Sawcut and remove existing curb and gutter and median paving. 2, Excavate 6" below subgrade and install 6" of C.T.B. or lime stabilization. 3. Pour reinforced concrete median noso to replace $' pavement and 6" curb. The tbllowing prices are submitted lbr your considerat/on as a unit price to repa/r and remove each median nose: A. lull-width median nose (~-/-14') $2,200.00 B. Turn lane median nose (+/-4') 900.00 A detail of the mm lane median nose as approved for the Koll Center Project is attached. The full-width nose would be along the same design only wider. Median nose work would have to be done after all north and southbound lane repairs have been completed and open to traffic. Local barricading would be required to move traffic toward the outside lanes since portions of both inside lanes would be removed, In addition to the replacement at the M-3 location, I recommend that the crossovers at Gateway and Fritz as well as the turn lane at Ah'line be considered for replacement at th/s time. 08/06/01 ~I'0N 10:38 FA[ 9?27221114 ~00~ "' ~ ~ ~ PLAN " ~ /I ~ sT~u~ .~.s SECTION PAYMENT REINF BARS < SEC~ON B-B < ) ~EDIAN ~ND D~AI~ ~'