ST9801-CS001113Sent By: EBCC; FAX (214} 352-3201 November 13, 2000 Mr. Michael A. Martin, P.E. Engineering and Public Works City of Coppell 255 P.arkway Blvd. Coppell, Texas 75019-4409 Re: 2143523201; Nov-13-00 1:26PM; Page 2/3 T :~ ~.~J!' ~ TELEIeHONE {2¶4) 358461t ED SELL COlilSTRUCTIO=I COMPANY -- 10805 HARRY HINE9 PO~T OFFICE BOX 540787 ,, OALI, A$. TEXAS 75354-0787 : DALLAS. TEX. A8 7S220 CoppeEl Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Mr. Martin: 7 . Subsequent to our phoac conversation on November 13,:'~000 regarding sprinkler head adjustments and the City's desire to negotiate a revised gice, we have contacted our irrigator and he has estimated that it will take 218 sprinkler heads to ~'.atch the existing sprinkler system that was rcmovc;d. This information is only anj estimate oI'tl~ number of heads that will bt: required and not a final count of sprinkler heads. :~'t The City of Coppell's October 5, 2000 letter regarding ti'is isubject indicates that the City has requested renegotiation of this bid item based upon the ~tual number of sprinkler heads in accordance with Item 1.37.1 of the NCTCOG Standard boccifications. !EBCC will not have a final count of sprinkler heads until our irriSator has ~ni~ed his work. Since the basis for your request to renegotiate has not been satis:fi6cl, EBCC has t~oVresponded to your letter. ,,. - ::. : . In our phone conversation, you indicated that EBCC wit:i be performing the installation of the sprinkler system at our risk. We do not: agree with that ~sessment and:will not perform the work at our risk. The. City's October 5, 200Oleiter and discus. ions at subsequent biweekly progress meetings did not indicate that a renegotiat~d price had tC,,b~ established prior to start of the work. In fact. the City' s letter indicates that the tcnegotiation ~11~ occur after the :final number of heads has been determined. As stated previously, that event wi,l not occur until the work has been completed. EBCC has proceeded with this work in acccr.,dance with our understanding of tile contract and the City's direction and expe~ts to be paid f~r ~he work. If it is the City's intent to not pay for this work or to remove this wOrk from EBCC's contract. then please direct EBCC to stop work on this item. Please note that EBCC has alre~y:: incurred costs associated with this bid item and would expect to be compensated for those ~sts should the City elect to remove this item from the contract i .i As stated in previous conversations. EBC~ will consid~ die City's re4uest to revise the price for this bid item even though the character elithe work has r.~Dt:changed and tlie item doesn't meet AN EQUAL:!OPPORTUN~TY S:. Pr~OYER Sent EBCC; 2143523201; Nov-13-00 1:26PM; Page 2 ~:' Coppell Road Reconstruction ' Re: Sprinkler Hcad Adjustments th, NCTCOG criteria for an item open to !renegotiationi} Item 1.37.1 applies to major item of work and a-major item of work, as defined in Item 1.0 Or'the NCTCOG Standard Specifications, is an item of work that mnounts to five (5)pen:eat or m-re of the total contract amounL Utilizing a contract amount of $2,060,958L73, a major il~n of work would need to exceed $103,047.94. To qualify as a major item,;-iEBCC would;~ccd to adjust !413 sprinkler heads. The total number of sprinkler hcads to bc aclj~ted will not ~ceed that amount. We are available to discuss this itcm at .yoUr convenient, but would prefer to discuss the item after the work has been completed. hesitate to contact our of~ce. S' cerely, l..~Constntl~t,on Company Robert D. Weber Project Manager xc; If yoU have any qu~ tions regarding this information, don't Mr. A. Scott Maughn, E.LT., FreeSe and Nichol!', Inc., 1701 N.: Market Street Suite 500 LB5 l, Dallas, Texas 75202 'i ! Page 3t3