Valley R Center-CS 890905DUNAWAY ASSOCIATES, INC.
8804704
September 5, 1989
Mr. Bob Roth
TRINITY RIVER AUTHORITY
6500 West Singleton Boulevard
Dallas, Texas 75212
RE:
Valley Ranch Center
South~t Corner of Belt Line Road
and MacArthur Boulevard
Dear Mr. Roth:
Attached please find a request for point of entry and plan sheet for proposed City
of Coppell 8-inch sanitary sewer main (Line "SA").
The Mobil constructed Line "SA" Manhole Station 0+25.79 and tied into existing TRA
manhole approximately 1.4 feet higher than the approved design.
Valley Ranch Center plans to remove the existing 8-inch entry into the existing TRA
manhole and re-enter existing TRA manhole at design elevation. This will include
the removal and reconstruction of manhole and 8-inch sewer line installed by Mobil.
Sincerely,
SKL/rel ~Zeve 'K. mke '
cc: Scott Morway
Rick Walker
Mike Robertson
TRINITY RIVER AUTHORITY OF TEXAS
NORTHERN REGION PROJECTS
REQUEST FOR A POINT OF'ENTRY
JULY 86
ATTACHMENT A
CONTRACTING PARTY:
PROPOSED PROJECT NAME:
DESIGN ENGINEER:
CONTACT: ~'v~
FZm c t
TELEPHONE NO.
L~CATION OF PROPOSED CONNECTION (TRA NOMENCLATURE). NOTE: DETAILS CONCERNING
TRA INTERCEPTORS ARE AVAILABLE FROM TIlE PROJECT BUT SHOULD BE VERIFIED IN THE
FIELD PRIOR TO SUBMITTAL.
PROJECT CRWS X TMC
INTERCEPTOR:
STATION NO.:
PLANNED LAND USE FOR THE AREA TO BE SERVED:
ACREAGE: --
INITIAL FLOW EXPECTED: /oho
ULTIMATE FLOW EXPECTED: IZoo
BASIS FOR ESTABLISHING FLOWS:
MGD (DAILY AVERAGE)o. ool MGD (PEAK)
MGD (DAILY AVERAGE).o. oo)2. MGD (PEAK)
TYPE OF CONNECTION:
EXISTING MANHOLE:
SIZE OF CONNECTION:
CONSTRUCT MANHOLE:
SLOPE AT CONNECTION:
MATERIAL OF CONNECTION: P'VC.
METERING FACILITY PROPOSED?
YES ~( NO
IF YES, EASEMENT DOCUMENTS FOR THE METER STATION AND ACCESS ROAD MUST ACCOMPANY
"'THIS REQUEST
TYPE
JULY 86
ATTACHMENTS ACCOMPANYING THIS REQUEST CONTAIN: (PLEASE CHECK)*
CONNECTION:
METERING FACILITY:
PLAN SHEETS
PLAN SHEETS
PROFILE SHEETS
PROFILE SHEETS
SPECIFICATIONS
CONSTRUCTION PRINTS
CONSTRUCTION SPECIFICATIONS
EQUIPMENT SPECIFICATIONS
GENERAL:
SERVICE AREA MAP
(INCLUDES DRAINAGE AREA, CITY
BOUNDARIES, AND NAME OF DEVELOPMENT)
REQUEST TO BE SIGNED BY THE
CONTRACTING PARTY:
NAME:
SIGNATURE:
DATE:
TITLE:
CONTRACTING PARTY: CI'T¥/ O~ C~/~/~J.-~''
* REQUESTS WITHOUT THE ABOVE INFORMATION WILL BE DELAYED UNTIL ALL THE INFORMATION
IS RECEIVED.
TRA USE ONLY
POE NO.
THE ABOVE POINT OF ENTRY IS HEREBY SUBJECT TO THE FOLLOWING CONDITIONS:
SIGNED:
APPROVED BY:
CC: NORTHERN REGION OFFICE
DATE:
DATE: