Loading...
Valley R Center-CS 870506GINN, INC. CONSULTING ENGINEERS TO: FROM: DATE: SUBJECT: City of Coppell Attn: Taryon Bowman, Shohre Daneshmand Ginn, Inc., City Engineer May 6, 1987 Valley Ranch Center SE, SW Corner MacArthur & Belt Line S-1007 SUP Car Wash (SE Corner) S-1008 SUP Gas Station (SE Corner) S-1009 SUP Grocery (SE Corner) S-1010 SUP Gas Station (SW Corner) S-1011 SUP Car Wash (SW Corner) S-1017 SUP Convenience Store (SE Corner) S-1018 SUP Convenience Store (SW Corner) We have no objections to any of the above with regard to special use permits or zoning. We do want the opportunity to review each plan regarding preliminary and final plat/plan submittal. Some potential problem areas we see are: Drives along Belt Line and MacArthur are not in accordance with subdivision ordinance regarding widths and spacing and locations. 2. Drainage in this area is a major concern for the City. Gabe Favre /SS GINN, INC. CONSULTING ENGINEERS TO: FROM: DATE: SUBJECT: City of Coppell Attn: Taryon Bowman, Shohre Daneshmand Ginn, Inc., City Engineer May 6, 1987 Valley Ranch Phase IV Water and Sanitary Sewer Plan We have reviewed the above referenced project for conformance to City of Coppell subdivision ordinance, zoning ordinance, and standards,~ and the follow, lng sets forth our comments. Provide documents for right-of-way dedication along Belt Line and MacArthur to dedicate at this time, not future. On 12" line "WB," indicate boring to extend beyond back of curb, a minimum of 5'; also, indicate steel encasement thickness, etc. Storm sewer along front of property will have to be extended prior to any work done on Valley Ranch Center; which may We have no further objections to the water and sewer lines as shown. /ss H. ,Y 0 7 1987 GINN, INC. CONSULTING ENGINEERS TO: FROM: DATE: SUBJECT: City of Coppell Attn: Taryon Bowman, Shohre Daneshmand Ginn, Inc., City Engineer May 6, 1987 Valley Ranch Center Preliminary Plat, Water, Sewer, Grading Plans We have reviewed the above referenced project for conformance to City of Coppell subdivision ordinance, zoning ordinance, and standards, and the following sets forth our comments. We have no objections to the preliminary water and sewer layout plan as presented for the above referenced project. We would like to have the opportunity to review again and see plan/profiles of sewer lines. 10' x 300' right-of-way reservation should be indicated to be dedicated to City at this time, along with documents. Provide detail sheets for all construction; do not allow details by inference to standards only. 4. Add valve on 8" line around rear of building. 5. Indicate fire lanes on plat. 6. Provide overall site plan with dimensions, etc. Driveways are not in accordance with subdivision ordinance; please address. Se Curb inlets shown do not appear to be adequate for anticipated flows. Drainage, steep slope at southwester corner of property not acceptable. 10. If on-site detention is being provided, please provide more information. 11. No open ditches allowed. Storm sewer system along Belt Line Road shall be extended to east property line. 12. Provide details of retaining wall, south property line. Gabe Favre