Villages C P1-LR 920930 eed engineeri.g GEOTECHNICAL CONSULTANTS September 30, 1992 Project No. 755.1 Report No. 13 Don A. Tipton, Inc. 6330 Beltline Road, suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Residential Building Pads Villages of Coppell, Phase IIIB Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the fill placement in the residential building pads from September 14 through 30, 1992. During the above period, 20 field density tests were taken on the fill placed in the residential building pads in Blocks A and B of Phase IIIB. Test results are shown on Plate 1. Where tested, the fill was found to comply with the project specifications. Additional reports will be submitted as the work progresses. Sincerely, THE REED ENGINEERING GROUP Ronald F. Reed, P.E. RFR/wde copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole (1) City of Coppell/Engineering Department/ Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 ,, (FAX) 214/350-0019 T reed engineering__ VILLAGES OF COPPELL, PHASE IIIB COPPELLt TEXAS REPORT NO. 13 Field Density Tests on Residential Building Pads Depth Com- Below Unit pac- Final Dry Moisture tion Test Block Lot S.G. Weight Content Curve Level Date No. No. No. (feet) (pcf) (%) No. (%) 09-15-92 359 A 39 2.0 111.9 15.7 11 97.3 360 A 37 2.0 109.2 17.0 11 95.0 09-16-92 361 A 36 0.0 112.2 12.8 11 97.5 362 A 38 2.0 110.2 12.5 11 95.8 363 A 41 1.5 113.0 11.8 11 98.3 364 A 41 1.0 109.1 13.2 11 95.0 09-17-92 365 A 34 0.0 112.4 12.9 11 97.7 366 A 32 0.0 112.4 14.1 11 97.7 367 A 30 0.0 113.4 12.9 11 98.6 09-18-92 368 A 28 0.0 113.1 13.5 11 98.3 369 A 26 0.0 111.9 14.6 11 97.3 09-28-92 370 A 24 0.0 108.7 15.9 11 95.1 371 A 22 0.0 110.0 15.1 11 95.6 372 A 20 0.0 109.2 15.8 11 95.0 09-29-92 373 A 39 0.0 109.9 15.5 11 95.6 374 B 10 0.0 109.4 15.0 11 95.1 09-30-92 375 A 41 0.0 110.2 13.4 11 95.8 376 A 37 0.0 110.3 14.1 11 95.9 377 B 12 0.0 113.2 14.0 11 98.4 378 B 14 0.0 110.0 14.4 11 95.7 GEOTECHNICAL CONSULTANTS P1 ate 1