Villages C P1-LR 920831 reed engineering GEOTECHNICAL CONSULTANI S August 31, 1992 Project No. 755.1 Report No. 11 Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Residential Building Pads Villages of Coppell, Phase IIIB Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the fill placement in the residential building pads from August 10 through 22, 1992. On August 10, 1992, two density tests were performed on the fill placed by Craig Olden, Inc. on the slope of Block A, Lots 11 and 12 and Lots 9 and 10 in Phase IIIA. Two additional tests were performed in Block A, Lot 10 on August 20, 1992. Tests results are shown on Plate 1. Where tested, the fill was found to comply with the project specifications. on August 14, 1992, three samples of the imported soil being used in Phase IIIB were obtained and returned to the laboratory to determine compliance with the project Plasticity Index (PI) requirement of 28 or less. Test results are as follows: Liquid Plastic Plasticity Limit Limit Index Description (%) (%) (PI) Dark brown & yellowish- 43 16 27 brown clay w/trace of sand Yellowish-brown sandy 37 14 23 clay Dark brown clay w/gravel 40 16 24 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 Don A. Tipton, Inc. Project No. 755.1/Report No. 11 August 31, 1992 Page 2 Test results indicate the materials are acceptable for use as fill in the residential building pads. On August 22, 1992, fill placement and density testing resumed in Block A, Lots 35 through 41. Four field density tests were performed. Test results, which are shown on Plate 1, indicate compliance with the project specifications. Additional reports will be submitted as the work progresses. Sincerely, THE R~ED ENGINEERING Ronald F. Reed, P.E. BES/RFR/wde copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole (1)city of Coppell/Engineering Department/ Mr. Larry Davis reed engineering__ VILLAGES OF COPPELLv PHASE Ilia ~ND IIIB COPPELLv TEX~S REPORT NO. ii Field Density Tests on Residential Buildinq Pads Depth Com- Below Unit pac- Final Dry Moisture tion Test Block Line S.G. Weight Content Curve Level Date No. No. No. (feet) (pcf) (%) No. (%) 08-10-92 324(1) A ll&12 3.0 105.3 18.4 3 100.0 325(1) A 9&10 0.0 102.2 19.9 3 97.1 08-20-92 353(1) A 10 0.1 111.6 15.9 5 93.8 354(1) A 10 0.1 110.4 16.9 5 92.8 08-22-92 355(2) A 41 3.0 108.9 19.1 9 97.2 356(2) A 39 2.5 109.8 16.8 9 98.0 357(2) A 37 2.5 110.4 16.3 9 98.6 358(2) A 35 2.0 108.7 17.5 9 97.1 Footnotes: 1. Test performed in Phase IIIA on fill placed by Craig Olden, Inc. 2. Test performed in Phase IIIB on fill placed by Wier Excavating. GEOTECHNICAL CONSULTANTS -- Plate 1 reed engineering GEOTECHNICAL CONSULTANTS August 31, 1992 Project No. 755.1 Report No. 10 Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Utility Trench Backfill Villages of Coppell, Phase IIIB Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of August 5 through 20, 1992. During the period of August 5 through 20, 1992, a total of 45 field density tests were taken on the utility trench backfill. Test results are shown on Plates 1 and 2. Where tested, the materials were found to be in compliance with project specifications. The utility installation is now complete for this project. If you have any questions, do not hesitate to call. Sincerely, ~onald F. Re d, P.E. ' BES/RFR/wde copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole (1) city of Coppell/Engineering Department/ Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-O019 reed engineering__ VILLAGES OF COPPELL, PHASE IIIB COPPELL, TEXAS REPORT NO. 10 Field Density Tests on Storm and Sanitary Sewer Backfill Depth Com- Below Unit pac- Final Dry Moisture tion Test Line Station/ S. G. Weight Content Curve Level Date No. No. Location (feet) (pcf) (%) No. (%)_ 08-05-92 306 2 3+15 2.0 99.9 22.2 3 95.0 307 2 3+00 0.8 101.2 22.8 3 96.2 308 2 2+00 1.5 101.2 20.8 3 96.2 309 2 2+10 0.0 100.2 23.5 3 95.2 310 2 2+00 3.0 102.2 21.6 3 97.1 311 2 3+15 4,0 102.0 22.4 3 97.0 08-07-92 312 2 5+00 0.0 108.1 18.9 3/5 96.4 313 2 3+00 0.0 100.6 21.8 3 95.6 314 2 1+00 0.0 100.1 24.2 3 95.2 08-10-92 315 F A/42 0.6 102.0 19.3 3 96.9 316 F A/40 0.6 101.4 19.6 3 96 3 317 F 3+00 0.6 95.9 24.4 6 97 6 318 F 5+50 0.6 103.9 19.7 3 98 7 319 F A/36 0.6 103.2 19.6 3 98 1 320 F A/34 0.6 103.9 19.1 3 98 7 321 F A/32 0.6 100.0 20.4 3 95 1 322 F A/30 0.6 111.0 15.0 10 96 2 323 F 7+50 0.6 105.3 18.8 3 10O 1 08-12-92 326 A 12+00 0.0 113.9 14.1 5 95 7 327 A 9+00 0.0 115.1 14.1 5 96 7 328 A A/22 0.0 114.5 14.1 5 96 2 329 A A/24 0.0 113.5 14.1 5 95 4 330 A A/22 0.0 115.9 14.4 5 97 4 331 A A/20 0.0 114.1 13.9 5 95 1 332 A A/20 0.0 116.6 13.4 5 97 9 333 C 0+50 0.0 100.0 23.3 6 101 8 334 C B/1 0.0 98.9 24.1 6 100 7 335 C B/3 0.0 98.0 25.6 6 99.8 336 C B/5 0.0 100.1 22.5 6 101.9 337 G B/5 0.0 98.1 24.9 6 99.9 338 G B/8 0.0 98.6 25.6 6 100.4 339 G 0+75 0.0 99.5 24.8 6 101.3 GEOTECHNICAL CONSULTANTS P1 ate 1 T reed eng.ineering__ VILLAGES OF COPPELL, PHASE IIIB COPPELL, TEXAS REPORT NO. 10 Field Density Tests on Water Line Backfill Depth Com- Below Unit pac- Final Dry Moisture tion Test S.G. Weight Content Curve Level Date No. Location (feet) (pcf) (%) No. (%). 08-20-92 340 Brentwood Lot 10 0.4 107.8 15.3 9 96 3 341 Brentwood Lot 12 0.2 102.9 19.0 7/9 99 1 342 Brentwood Lot 14 0.2 103.6 19.8 7/9 99 8 343 Brentwood Lot 16 0.2 107.5 18.3 9 96 0 344 Brentwood Lot 18 0.2 109.1 19.2 9 97 4 345 Brentwood Lot 20 0.2 107.2 19.0 9 95 7 346 Parker Dr. Lot 22 0.2 108.7 17.3 9 97 1 347 Parker Dr. Lot 23 0.2 111.8 16.6 9 99 8 348 Parker Dr. 13+20(1) 0.2 109.1 18.4 9 97 4 349 Beau Dr. Lot 2 0.2 110.8 17.4 9 98.9 350 Beau Dr. Lot 5 0.2 109.8 18.3 9 98.0 351 Beau Dr. Lot 6 0.2 106.8 18.5 9 95.4 352 Beau Dr. Lot 8 0.2 106.7 19.8 9 95.3 Footnote: (1) Station refers to paving station. Where no station is used test was performed on water service lateral. GEOTECHNICAL CONSULTANTS Plate 2